Terms and conditions attached to the Award of Community Assistance to Greece for specified Works on the Evzoni-Volos road (Axios Bridge-Kleidi Junction)
1. Location of the project
The project that is the subject of this Decision is situated on the principal road connecting Evzoni-Thessaloniki-Volos. The section concerned is between Axios Bridge and Kleidi Junction.
2. Description of the project
The project concerns the construction of a second carriageway for the existing two-lane, bi-directional, road having a total length of 11,5 kilometres. Associated works will result in the completion over this section of a road with the characteristics of a 2 × 3-lane motorway.
3. Technical description
The pavement width of the new section is designed to 14 metres offering three traffic lanes. Between the existing and the new carriageway there will be a central reservation of 11 metres width (minimum); this central reservation will permit two extra lanes of traffic to be added in the future when traffic flows demand. Two large bridges are included; over the rivers Axios (780 metres) and Loudias (80 metres).
4. Timetable for the project
Work on the project should commence in mid-1983. Completion is scheduled for the end of 1985.
5. Payment schedule
5.1. The Community agrees to contribute 15 % of total costs up to a maximum of 2 500 000 ECU for this project. The remainder of the cost is to be financed through the Greek 'national public investment budget' (Ministry of Public Works). The total cost of the project is estimated at one thousand four hundred million drachmas (eighteen million six thousand European Currency Units at May 1983).
The payment schedule shall be as follows:
Payment 1
Upon receipt by the Commission of evidence that the Greek authorities have complied with the general stipulation imposed by the Commission regarding the tendering for the contracts (see 5.2 below) the Commission shall authorize the payment of an advance of not more than 30 % of the total grant.
Payment 2
Upon receipt by the Commission of certified evidence that work equivalent to 50 % of the project, as defined below, has been completed, the Commission shall pay or cause to be paid a sum equivalent to 45 % of the total grant.
Payment 3
Upon receipt of certified evidence that the project has been completed, the Commission shall pay or cause to be paid the remainder of the sum outstanding.
5.2. Prior to making the first payment (payment 1), the Commission will require the Greek Government to apply EEC Directives 71/305/EEC and 72/277/EEC notably with respect to advertising appropriate works.
5.3. In order to qualify for the second payment the Commission will require evidence that the actual certified payments for the project have equalled or exceeded fifty percent (50 %) of the total cost noted in 5.1 above.
6. Maintenance of accounts
The Commission requires that the Greek authorities responsible maintain accounts and all other information required by the Commission for the effective control over the expenditure on the project. The Commission reserves the right to require written evidence to be supplied during the course of the work of progress and to inspect the site of the works. The accounts of the project are to be maintained for at least eight years after the completion of the works. 7. Certification of payments and control of the works
In respect of each payment the Commission will require from the responsible authorities:
first:
a statement of the works undertaken sufficient to monitor progress. This statement is to be signed by the official responsible for the project to the Greek authorities;
second:
a certified statement of the payments that have been made.
Upon receipt of all payments from the Commission in pursuance of this Decision the Commission will require a receipt to be issued.
8. Responsible officials
The responsible authority for the execution of this Decision in Greece is the Ministry of Public Works, Athens.
For the Commission, the Head of Division 'Infrastructure Planning and Development', Directorate-General for Transport, is responsible for implementation.
9. Publicity
The responsible authority is required to advertise assistance from the Community by erecting site notices.