My bookmarksSign up free

2009/335/EC: Commission Decision of 20 April 2009 on technical guidelines for the establishment of the financial guarantee in accordance with Directive 2006/21/EC of the European Parliament and of the Council concerning the management of waste from extractive industries (notified under document number C(2009) 2798)

2009/335/EC: Commission Decision of 20 April 2009 on technical guidelines for the establishment of the financial guarantee in accordance with Directive 2006/21/EC of the European Parliament and of the Council concerning the management of waste from extractive industries (notified under document number C(2009) 2798)

Directive 2006/21/EC · Decision · 2 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

1.   Member States and competent authorities shall base the calculation of the financial guarantee referred to in Article 14 of Directive 2006/21/EC on the following: (a) the likely impacts on the environment and on human health of the waste facility; (b) the definition of the rehabilitation including the after use of the waste facility; (c) applicable environmental standards and objectives, including physical stability of the waste facility, minimum quality standards for the soil and water resources and maximum release rates of contaminants; (d) the technical measures needed to achieve environmental objectives, in particular measures aiming at ensuring the stability of the waste facility and limit environmental damages; (e) the measures required to achieve objectives during and after closure, including land rehabilitation, after closure treatment and monitoring if required, and, if relevant, measures to reinstate biodiversity; (f) the estimated time scale of impacts and required mitigation measures; (g) an assessment of the costs necessary to ensure land rehabilitation, closure and after closure including possible after closure monitoring or treatment of contaminants. 2.   The assessment referred to in point (g) shall be performed by independent and suitably qualified third parties and shall take into account the possibility of unplanned or premature closure.

Article 2

This Decision is addressed to the Member States.

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next