My bookmarksSign up free

Commission Implementing Regulation (EU) No 1113/2014 of 16 October 2014 establishing the form and technical details of the notification referred to in Articles 3 and 5 of Regulation (EU) No 256/2014 of the European Parliament and of the Council and repealing Commission Regulations (EC) No 2386/96 and (EU, Euratom) No 833/2010

Commission Implementing Regulation (EU) No 1113/2014 of 16 October 2014 establishing the form and technical details of the notification referred to in Articles 3 and 5 of Regulation (EU) No 256/2014 of the European Parliament and of the Council and repealing Commission Regulations (EC) No 2386/96 and (EU, Euratom) No 833/2010

Implementing Regulation (EU) No 1113/2014 Β· Regulation Β· 5 articles

Data as of 2026-07-04 Β· Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. Β· Read the official text β†—

Article 1

The form and technical details of the notification to the Commission of data and information on investment projects in energy infrastructure referred to in Articles 3 and 5 of Regulation (EU) No 256/2014 shall be as set out in the Annex to this Regulation.

Article 2

Regulations (EC) No 2386/96 and (EU, Euratom) No 833/2010 are repealed.

Article 3

Member States shall ensure coherence of statistical information reported based on the template in the Annex and statistical information reported under Regulation (EC) No 1099/2008 on energy statistics.

Article 4

This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union .

Supplementary provisions

ANNEXSupplementary provisions

ANNEX Text of image O1 β€” OIL REFINING Reporting year 20XX Member State in thousand tonnes per year Type of infrastructure Annex point 1.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2)+ 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity Capacity Number Capacity Number Capacity Number Capacity Capacity Number Capacity Capacity Distillation (*) Atmospheric distillation with CCS/CCS ready Vacuum distillation with CCS/CCS ready Cracking (**) Cracking (Thermal) β€” Visbreaking and/or thermal β€” Coking β€” Other with CCS or capture ready Cracking (catalytic) β€” Fluid catalytic cracking β€” Hydrocracking β€” Other with CCS or capture ready Reforming (**) (Naphtha and isomerisation) with CCS or capture ready Text of image Desulphurisation (gasoil, HFO, other) with CCS or capture ready Alkylation Polymerisation Isomerisation (C4) with CCS or capture ready Etherification (MTBE, TAME, ETBE) β€” Other with CCS or capture ready Supplementary Info Art. 5 (3) Indication of e.g. reasons for investment, delays, problems for new infrastructure (*) installations of a capacity β‰₯ 1 Mio tonnes/y (**) installations with a minimum capacity of 500 t/day NB: under construction and FID (Final Investment Decision) include renovation Text of image O2 β€” OIL TRANSPORT Reporting year 20XX Member State Type of infrastructure Annex point 1.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4+ 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Installations to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Crude oil transport pipe- lines (*) Petroleum product pipe- lines (**) Supplementary Info Art. 5 (3) Indication of e.g. reasons for investment, delays, problems for new infrastructure (*) with a capacity β‰₯ 3 Mio Metric tonnes/year for New pipelines + extension/lengthening β‰₯ 30 km (**) with a capacity β‰₯ 1.5 Mio Metric tonnes/year for New pipelines + extension/lengthening β‰₯ 30 km NB: under construction and FID (Final Investment Decision) include renovation Text of image O3 β€” OIL CROSS-BORDER TRANSPORT Reporting year 20XX Member State Transport capacity (Metric Tonnes per day) Cross-border transmission projects and essential links in interconnecting national or international networks Annex point 1.2 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2)+ 2(4)+ 4+ 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3)+ 4+ 5 (1) a) Additions to be commissioned (under construction + FID) Art. 2(3) + 5 (1) c) Infrastructure to be decommissioned (FID) Art. 1(2) + 2(5) + 5 (2) TEN-E projects Supple- mentary info Art 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Ref. TO (*) FROM (**) TO (*) FROM (**) TO (*) FROM (**) TO (*) FROM (**) TO (*) FROM (**) TO (*) FROM (**) TO (*) FROM (**) Crude oil pipelines Annex point 1.2 Cross β€” border/interconnecting point No 1 (location β€” indicate MS/Third countries) Petroleum products pipelines Annex point 1.2 Cross β€” border/interconnecting point nΒ° 1 (location β€” indicate MS/Third countries) (*) to the reporting MS (**) from the reporting MS NB: under construction and FID (Final Investment Decision) include renovation Text of image O4 β€” OIL STORAGE Reporting year 20XX Member State Type of infrastructure Annex point 1.3 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (FID) (*) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (Under construction + FID) (*) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Storage capacity (m3) Storage capacity (m3) Number Storage capacity (m3) Number Storage capacity (m3) Number Storage capacity (m3) Storage capacity (m3) Number Storage capacity (m3) Storage capacity (m3) Crude oil Annex 1.3 Storage installations Tanks Petroleum products Annex 1.3 Storage installations Tanks Supplementary info Article 5(3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Installations with a capacity β‰₯ 150 000 m3 and tanks with a capacity β‰₯ 100 000 m3 NB: under construction and FID (Final Investment Decision) include renovation Text of image G1 β€” GAS TRANSMISSION Reporting year 20XX Member State Type of infrastructure (*) Annex point 2.1 Existing infrastructure Art 5(3) Infrastructure under construction Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Transmission pipelines Annex 2.1 Total power (MW) Number Total Power (MW) Number Total Power (MW) Number Total Power (MW) Total Power (MW) Number Total Power (MW) Total Power (MW) Compressor substations (**) Annex 2.1 Supplementary Info Art. 5 (3) Indication of general comments, including e.g. the case of existing installations non operational for a period of more than 3 years (*) See definition in Annex 2.1 of the Council regulation: Transport pipelines that form part of a network which mainly contains high-pressure pipelines excluding pipelines that form part of an upstream pipeline network and excluding the part of high pressure pipelines primarily used in the context of local distribution of natural gas. (**) connected to transmission pipelines NB: under construction and FID (Final Investment Decision) include renovation Text of image G2 β€” GAS CROSS-BORDER TRANSMISSION Reporting year 20XX Member State Maximum Technical transmission capacity (Nm3/d) Cross-border transmission infrastructure Annex point 2.1 Existing infrastructure Art. 5 (3) Infrastructure Under Construction Art. 1(2) +2(4)+ 4+ 5 (1) a) Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5)+ 5 (2) TEN β€” E project Annex 2.1 Supple- mentary info (*) Article 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Ref. TO (**) FROM (***) TO FROM TO FROM TO FROM TO FROM TO FROM TO FROM Cross-border point No 1 (location β€” indicate MS/Third countries) Cross-border point No 2 (location β€” indicate MS/Third countries) (*) Indication of e.g. of delays, problems for new infrastructure or of the reasons of the increase in technical transmission capacity at a cross-border point in the absence of investment projects in new pipelines (**) to the reporting MS (***) from the reporting MS NB: under construction and FID (Final Investment Decision) include renovation Text of image G3 β€” LNG TERMINALS Reporting year 20XX Member State Type of infrastructure Annex point 2.2 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (*) (under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2) TEN β€” E project Annex 2.1 Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Number Art. 5(1) b) Max. regasification capacity [bcm(N)/y] β€” Art. 5(1) b) Max storage capacity [cm] Art. 5(1) b) Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Terminals for the importation of liquefied natural gas, with a regasification capacity of 1 bcm per year or more (Annex 2.2) NB: under construction and FID (Final Investment Decision) include renovation Text of image G4 β€” GAS STORAGE Reporting year 20XX Member State Type of infrastructure Annex point 2.3 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a)+ Art. 4 Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4 + 5 (1) a) Additions to be commissioned (*) (Under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Aquifer storage Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability β€” Max. withdrawal capacity [mcm/d] Injectability Max. injection capacity [mcm/d] Salt cavity Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability β€” Max. withdrawal capacity [mcm/d] Injectability Max. injection capacity [mcm/d] Depleted field Number Total storage capacity [bcm] Working gas Capacity [bcm] Text of image Deliverability β€” Max. withdrawal capacity [mcm/d] Injectability Max. injection capacity [mcm/d] Aboveground storage (**) Number Total storage capacity [bcm] Working gas Capacity [bcm] Deliverability β€” Max. withdrawal capacity [mcm/d] Injectability Max. injection capacity [mcm/d] Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Installations connected to the transport pipelines (**) Does not include storage capacity of LNG terminals (see separate LNG tables) NB: under construction and FID (Final Investment Decision) include renovation Text of image E1 β€” ELECTRICITY PRODUCTION Reporting year 20XX Member State Type of infrastructure Annex point 3.1 Existing infrastructure Art. 5 (3) Infrastructure under construction Art. 1(2)+ 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a) Additions expected to be commissioned (Under construction + FID) Art. 1(2)+ 5 (1) c) Installations expected to be decommissioned Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Capacity (*) (MW) Capacity (*) (MW) Number Capacity (*) (MW) Number Capacity (*) (MW) Number Capacity (*) (MW) Capacity (*) (MW) Number Capacity (*) (MW) Capacity (*) (MW) Conventional thermal power stations (β‰₯ 100 MW) capable of burning Annex point 3.1 + Art. 5(1) d) Coal and lignite with CCS/CCS ready Oil with CCS/CCS ready Gas with CCS/CCS ready Two or more energy sources (**) / (*) with CCS/CCS ready Others Nuclear Power Stations (β‰₯ 100 MW) of type Annex point 3.1 + Art. 5(1) b) Pressurized Water Reactor Boiling Water Reactor Graphite Gas Reactor Fast Breeder Reactor Others Biomass/bioliquids/waste power generation installations (β‰₯20 MW) capable of burning Annex point 3.1 + Art. 5(1) d) Biomass Waste Bioliquids Power stations with cogeneration of electricity and useful heat (electrical capacity β‰₯ 20 MW) capable of burning Text of image Coal and lignite with CCS/CCS ready Oil with CCS/CCS ready Gas with CCS/CCS ready Biomass Waste Two or more energy sources (**) / with CCS/CCS ready Hydro-electric power stations (β‰₯ 30 MW) of the type Annex point 3.1 + Art. 5(1) b) Seasonal stockage (S) Short-term stockage (ST) Run-of River (R) Pumped storage only (P) Mixed pumped and others Wind power farms (β‰₯ 20 MW) of the type Annex point 3.1 + Art. 5(1) b) On-shore Off-shore Concentrated solar thermal and geothermal installations (β‰₯ 20 MW) Annex point 3.1 Concentrated solar thermal Geothermal Photovoltaic installations (β‰₯10 MW) Annex point 3.1 Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Nominal capacity (**) For installations capable of burning more than one fuel, please indicate the power at total level and for each fuel separately NB: under construction and FID (Final Investment Decision) include renovation Text of image E2 β€” ELECTRICITY TRANSMISSION Reporting year 20XX Member State Type of infrastructure Annex point 3.2 Existing infrastructure Art. 5 (3) Infrastructure under Construction Art. 1(2)+ 2(4) + 4 + 5 (1) a) Planned infrastructure (FID) Art. 1(2) + 2(3) + 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5) + 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Overhead lines (β‰₯220 kV minimum) designed for the voltage commonly used at national level for interconnections lines (select the range) Annex 3.2 AC [220-299 kV] [300-359 kV] [360-499 kV] [x]* DC 300-499 MW 500-699 MW 700-999 MW 1000-1199 MW other Underground lines (β‰₯ 150 kV) AC [150-199 kV] [220-299 kV] [300-359 kV] [360-499 kV] other DC 300-499 MW 500-699 MW 700-999 MW 1000-1199 MW other Text of image Submarine lines (β‰₯ 150 kV) AC [150-199 kV] [220-299 kV] [300-359 kV] [380-499 kV] other DC 300-499 MW 500-699 MW 700-999 MW 1000-1199 MW 1200-1599 MW other Supplementary Info Art. 5 (3) Indication of e.g. the case of existing infrastructure non operational for a period of time exceeding 3 years (*) Fill in in cases two voltage systems coexist within a single Member States NB: under construction and FID ((Final Investment Decision) include renovation Text of image E3 β€” ELECTRICITY CROSS-BORDER TRANSMISSION Reporting year 20XX Member State (MS) Type of infrastructure Annex 3.2 Existing infrastructure Art. 5 (3) Infrastructure under Construction Art. 1(2) +2(4)+ 4+ 5 (1) a) Planned infrastructure (FID) Art. 1(2)+ 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned Art. 1(2) + 2(5)+ 5 (2) TEN-E project Annex 3. Supple- mentary info Art. 5(3) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Characteristics of section in the reporting Member State (MS) Voltage (kV) Trans- mission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Trans- mission capacities (MVA - AC MW - DC) Length (km) Voltage (kV) Trans- mission capacities (MVA - AC MW - DC) [Yes/No] [Yes/No] [Yes/No] [Yes/No] Ref. Overhead lines AC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) No 1 DC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) Underground lines AC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) DC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) Submarine lines AC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) DC Border (MS A β€” MS/Country B) Substation 1 (A)-Substation 1 (B) NB: under construction and FID (Final Investment Decision) include renovation Text of image B1 β€” BIOFUEL PRODUCTION Reporting year 20XX Member State Type of infrastructure Annex point 4 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4+ 5 (1) a) Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4+ 5 (1) a) Additions to be commissioned (*) (Under construction + FID) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3+5] Annual capacity (kt) Annual capacity (kt) Number Annual capacity (kt) Number Annual capacity (kt) Number Annual capacity (kt) Annual capacity (kt) Number Annual capacity (kt) Annual capacity (kt) Installations β€” Un-processed refined oil (Pure Plant Oil) Installations β€” Biofuel from oil crops FAME (Fatty Acid Methyl Ester) and FAEE (Fatty Acid Ethyl Ester) Oils (Hydrotreated and Refinery Co-Processed Oils) Other Installations β€” Biofuel from sugar and starch crops Ethanol ETBE Other Installations β€” Biofuel from lignocellulosics Ethanol Synthetic Biofuel (**) Other Methane installations from biogas Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Installations of a capacity β‰₯ 50 kt/year (**) Fischer-Tropsh, DME, ethanol, methanol, methane, pyrolysis oil etc. NB: under construction and FID (Final Investment Decision) include renovation Text of image C1 β€” CO2 TRANSPORT Reporting year 20XX Member State Type of infrastructure Annex 5.1 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2) +2(4)+ 4 + 5 (1) a) Planned infrastructure (FID) (*) Art. 1(2)+ 2(3) + 4 + 5 (1) a) Additions to be commissioned (under construction + FID) (*) Art. 1(2) + 5 (1) c) Infrastructure to be decommissioned (*) Art. 1(2) + 2(5)+ 5 (2) Position at 1/1/Y Position at 31/3/Y Position at 31/3/Y Y + [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Length (km) Number Length (km) Number Length (km) Number Length (km) Length (km) Number Length (km) Length (km) Dry CO2 transport pipeline Liquid CO2 transport pipeline Total Power (MW) Number Total Power (MW) Number Total Power (MW) Number Total Power (MW) Total Power (MW) Number Total Power (MW) Total Power (MW) Compressor stations Supplementary info Indication of e.g. reasons for the investment, problems, delays for new infrastructure Art. 5(3) (*) Pipelines related to power generation plants and refining installations NB: under construction and FID (Final Investment Decision) include renovation Text of image C2 β€” CO2 STORAGE Reporting year 20XX Member State Type of infrastructure Annex point 5.2 Existing infrastructure Art. 5 (3) Infrastructure under construction (*) Art. 1(2)+ 2(4) + 4 + 5 (1) a) Planned infrastructure (*) (FID) Art. 1(2)+ 2(3)+ 4 + 5 (1) a) Additions to be commissioned (Under construction + FID) (*) Art. 1(2)+ 5 (1) c) Infrastructure to be decommissioned (*) Art. 1(2)+ 2(5) + 5 (2) Position at 1/1/Y Non-operational [>3 Y] Position at 31/3/Y Position at 31/3/Y Y+ [0-2] Y + [3-5] Y + [0-2] Y + [3-5] Aquifer storage Number Total storage capacity [kt] Injectability Max. injection capacity [t/d] Depleted field Number Total storage capacity [kt] Injectability capacity [t/d] Other Supplementary Info Art. 5 (3) Indication of e.g. reasons for the investment, problems, delays for new infrastructure (*) Installations with a capacity β‰₯ 100 kt NB: under construction and FID (Final Investment Decision) include renovation

Source: EUR-Lex (Publications Office of the EU), Β© European Union, reuse permitted under Commission Decision 2011/833/EU.

What to look at next