My bookmarksSign up free
Source

Commission Implementing Decision (EU) 2015/750 of 8 May 2015 on the harmonisation of the 1452-1492 MHz frequency band for terrestrial systems capable of providing electronic communications services in the Union (notified under document C(2015) 3061) (Text with EEA relevance)

Commission Implementing Decision (EU) 2015/750 of 8 May 2015 on the harmonisation of the 1452-1492 MHz frequency band for terrestrial systems capable of providing electronic communications services in the Union (notified under document C(2015) 3061) (Text with EEA relevance)

Implementing Decision (EU) 2015/750 · Decision · 6 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

This Decision is aimed at harmonising the conditions for the availability and efficient use of the 1 452-1 492 MHz frequency band for terrestrial systems capable of providing electronic communications services in the Union.

Article 2

Open ↗

1.   No later than six months after the date of notification of this Decision, Member States shall designate and make available, on a non-exclusive basis, the 1 452-1 492 MHz frequency band for terrestrial systems capable of providing electronic communications services in compliance with the parameters set out in the Annex. 2.   Member States shall ensure that the terrestrial systems referred to in paragraph 1 give appropriate protection to: (a) systems in adjacent bands; and (b) terrestrial broadcasting systems operating within the 1 452-1 479,5 MHz frequency band pursuant to an authorisation in force on the day of notification of this Decision or to subsequent renewal of such authorisation and in compliance with the parameters set by the Maastricht Special Arrangement of 2002, as revised in 2007. 3.   Member States shall facilitate cross-border coordination agreements so as to enable operation of the systems referred to in paragraph 1, taking into account existing regulatory procedures and rights, and relevant international agreements.

Article 3

Open ↗

Member States shall not be bound by the obligations under Article 2 in geographical areas where coordination with third countries makes it necessary for them to deviate from the parameters set out in the Annex. They shall aim to minimise the duration and geographical scope of such deviation.

Article 4

Open ↗

Member States shall report on the application of this Decision no later than nine months after the date of notification. Member States shall monitor use of the 1 452-1 492 MHz frequency band and report their findings to the Commission upon request or at their own initiative in order to allow timely review of this Decision, when necessary.

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX PARAMETERS REFERRED TO IN ARTICLE 2(1) A.   GENERAL PARAMETERS 1. The mode of operation within the 1 452-1 492 MHz frequency band shall be limited to base station (‘downlink-only’) transmission. 2. Block sizes within the 1 452-1 492 MHz frequency band shall be assigned in multiples of 5 MHz. The lower frequency limit of an assigned block shall be aligned with or spaced at multiples of 5 MHz from the lower band edge of 1 452 MHz. 3. Base station transmission must comply with the block edge mask in this annex. B.   TECHNICAL CONDITIONS FOR BASE STATIONS — BLOCK EDGE MASK The following technical parameters for base stations called ‘block edge mask’ (BEM) shall be used in order to ensure coexistence between neighbouring networks in the absence of bilateral or multilateral agreements between operators of such neighbouring networks. Less stringent technical parameters, if agreed among the operators or administrations concerned, may also be used provided that these parameters comply with the technical conditions applicable for the protection of other services or applications, including in adjacent bands or subject to cross-border obligations. The BEM is an emission mask that is defined as a function of frequency in relation to the edge of a block of spectrum for which rights of use are granted to an operator. It consists of in-block and out-of-block power limits. The in-block power limit is applied to a block owned by an operator. Optional in-block requirements are set out below. The out-of-block power limits are applied to spectrum within the 1 452-1 492 MHz frequency band which is outside a block granted to an operator. They are set out in Table 1. Furthermore, coexistence power limits are defined for wireless broadband electronic communications services within the 1 452-1 492 MHz band in order to ensure compatibility between these services and other radio services or applications either within the 1 452-1 492 MHz frequency band or in the adjacent 1 427-1 452 MHz or 1 492-1 518 MHz frequency bands. The co-existence power limits with regard to services or applications in the adjacent bands are set out in Table 2. Additional technical or procedural measures  ( 1 ) or both may be applied at national level to ensure coexistence with services and applications in the adjacent bands. The coexistence limits for T-DAB services in the 1 452-1 492 MHz band are set out in Table 3. In-block requirements An in-block equivalent isotropically radiated power (EIRP)  ( 2 ) limit for base stations is not obligatory. Member States may set an EIRP limit not exceeding 68 dBm/5 MHz which can be increased for specific deployments, for example for the aggregated use of spectrum within the 1 452-1 492 MHz band and spectrum in lower frequency bands. Out-of-block requirements Table 1 Base station BEM out-of-block EIRP limits within the 1 452 -1 492 MHz frequency band per antenna Frequency range of out-of-block emissions Maximum mean out-of-block EIRP Measurement bandwidth – 10 to – 5 MHz from lower block edge 11 dBm 5 MHz – 5 to 0 MHz from lower block edge 16,3 dBm 5 MHz 0 to + 5 MHz from upper block edge 16,3 dBm 5 MHz + 5 to + 10 MHz from upper block edge 11 dBm 5 MHz Frequencies within the 1 452 -1 492 MHz band spaced more than 10 MHz from the lower or upper block edge 9 dBm 5 MHz Coexistence requirements for adjacent bands Table 2 Base station out-of-band EIRP limits for adjacent bands Frequency range of out-of-band emissions Maximum mean out-of-band EIRP Measurement bandwidth Below 1 449 MHz – 20 dBm 1 MHz 1 449 -1 452 MHz 14 dBm 3 MHz 1 492 -1 495 MHz 14 dBm 3 MHz Above 1 495 MHz – 20 dBm 1 MHz Explanatory note to Table 2: these requirements are intended to ensure compatibility with coordinated fixed links, mobile services and aeronautical telemetry services limited to ground stations, deployed in adjacent frequency bands below 1 452 MHz or above 1 492 MHz. Coexistence requirements within the 1 452-1 492 MHz frequency band Table 3 Base-station out-of-block EIRP limits for adjacent channel coexistence with T-DAB within the 1 452 -1 492 MHz frequency band Frequency range of out-of-block emissions Maximum mean out-of-block EIRP Measurement bandwidth 0 to 1,3 MHz from block edge 9,3 dBm 1 MHz 1,3 to 1,5 MHz from block edge 2,8 dBm 1 MHz 1,5 to 1,8 MHz from block edge – 6,7 dBm 1 MHz 1,8 to 2 MHz from block edge – 12,4 dBm 1 MHz 2 to 2,3 MHz from block edge – 13,7 dBm 1 MHz 2,3 to 5 MHz from block edge – 14,9 dBm 1 MHz Remaining frequencies used for T-DAB – 14,9 dBm 1 MHz Explanatory note to Table 3: these requirements apply only if T-DAB is in operation at national level. They are intended to ensure compatibility with T-DAB services in adjacent channels within the 1 452-1 492 MHz frequency band and assume a guard band of at least 1,5 MHz between wireless broadband electronic communications services and T-DAB services. ( 1 )   For instance, one or more of the following: frequency planning coordination, site coordination, more stringent in-band power limits for base stations, more stringent out-of-band equivalent isotropically radiated power limits for base stations than stipulated in Table 2. ( 2 )   In-block EIRP is the total power radiated in any direction at a single location, independent of any base station configuration.

Other acts of the same type
2013/805/EU: Council Implementing Decision of 17 December 2013 authorising the Republic of Poland to introduce measures derogating from point (a) of Article 26(1) and Article 168 of Directive 2006/112/EC on the common system of value added tax2013/806/EU: Commission Decision of 17 December 2013 establishing the ecological criteria for the award of the EU Ecolabel for imaging equipment (notified under document C(2013) 9097) Text with EEA relevance2013/807/EU: Commission Implementing Decision of 17 December 2013 confirming or amending the average specific emissions of CO 2 and specific emissions targets for manufacturers of new light commercial vehicles for the calendar year 2012 pursuant to Regulation (EU) No 510/2011 of the European Parliament and of the Council (notified under document C(2013) 9184)Decision No 1313/2013/EU of the European Parliament and of the Council of 17 December 2013 on a Union Civil Protection Mechanism Text with EEA relevanceDecision No 1359/2013/EU of the European Parliament and of the Council of 17 December 2013 amending Directive 2003/87/EC clarifying provisions on the timing of auctions of greenhouse gas allowances Text with EEA relevanceCouncil Decision 2013/768/CFSP of 16 December 2013 on EU activities in support of the implementation of the Arms Trade Treaty, in the framework of the European Security Strategy2013/785/EU: Council Decision of 16 December 2013 on the conclusion, on behalf of the European Union, of the Protocol between the European Union and the Kingdom of Morocco setting out the fishing opportunities and financial contribution provided for in the Fisheries Partnership Agreement between the European Union and the Kingdom of Morocco2013/786/EU: Council Decision of 16 December 2013 on the signing, on behalf of the European Union, and the provisional application of the Protocol between the European Union and the Union of the Comoros setting out the fishing opportunities and the financial contribution provided for in the Fisheries Partnership Agreement currently in force between the two parties2013/797/EU: Council Implementing Decision of 16 December 2013 implementing Council Regulation (EU) No 1024/2013 of 15 October 2013 conferring specific tasks on the European Central Bank concerning policies relating to the prudential supervision of credit institutions2014/5/EU: Council Decision of 16 December 2013 on the signing, on behalf of the European Union, and provisional application of the Protocol setting out the fishing opportunities and the financial contribution provided for by the Fisheries Partnership Agreement between the European Union and the Republic of SeychellesCouncil Decision 2013/760/CFSP of 13 December 2013 amending Decision 2013/255/CFSP concerning restrictive measures against Syria2013/765/EU: Commission Implementing Decision of 13 December 2013 amending the recognition of Det Norske Veritas pursuant to Regulation (EC) No 391/2009 of the European Parliament and of the Council on common rules and standards for ship inspection and survey organisations (notified under document C(2013) 8876) Text with EEA relevance

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next