My bookmarksSign up free
Source

Commission Implementing Decision (EU) 2016/687 of 28 April 2016 on the harmonisation of the 694-790 MHz frequency band for terrestrial systems capable of providing wireless broadband electronic communications services and for flexible national use in the Union (notified under document C(2016) 2268) (Text with EEA relevance)

Commission Implementing Decision (EU) 2016/687 of 28 April 2016 on the harmonisation of the 694-790 MHz frequency band for terrestrial systems capable of providing wireless broadband electronic communications services and for flexible national use in the Union (notified under document C(2016) 2268) (Text with EEA relevance)

Implementing Decision (EU) 2016/687 · Decision · 8 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

This Decision harmonises the technical conditions for the availability and efficient use of the 694-790 MHz (‘700 MHz’) frequency band in the Union for terrestrial systems capable of providing wireless broadband electronic communications services. It aims also to facilitate flexible national use in response to specific national needs in accordance with RSPP spectrum policy priorities. The harmonised conditions for the 790-791 MHz frequency band under this Decision shall apply without prejudice to the provisions of Decision 2010/267/EU.

Article 2

Open ↗

For the purposes of this Decision the following definitions shall apply: 1. ‘wireless audio PMSE equipment’ means radio equipment used for transmission of analogue or digital audio signals between a limited number of transmitters and receivers, such as radio microphones, in-ear monitor systems or audio links, used mainly for the production of broadcast programmes or private or public social or cultural events; 2. ‘public protection and disaster relief (PPDR) radio communications’ means radio applications used for public safety, security and defence used by national authorities or relevant operators responding to the relevant national needs in regard to public safety and security including in emergency situations; 3. ‘machine-to-machine (M2M) radio communications’ means radio links for the purpose of relaying information between physical or virtual entities that build a complex ecosystem including the internet of Things; such radio links may be realised through electronic communications services (e.g. based on cellular technologies) or other services, based on licensed or unlicensed use of spectrum.

Article 3

Open ↗

1.   When Member States designate and make available the 700 MHz frequency band for use other than high-power broadcasting networks, they shall: (a) designate and make available the 703-733 MHz and 758-788 MHz frequency bands, on a non-exclusive basis, for terrestrial systems capable of providing wireless broadband electronic communications services in compliance with the parameters set out in Sections A.1, B and C of the Annex; (b) subject to national decisions and choice, designate and make available the portions of the 700 MHz frequency band other than those referred to in paragraph 1(a), for use in compliance with the parameters set out in Sections A.2 to A.5 of the Annex. 2.   Member States shall facilitate coexistence among different uses referred to in paragraph 1.

Article 4

Open ↗

Member States shall ensure that the systems referred to in Article 3(1)(a) and (b) give appropriate protection to existing systems in the adjacent 470-694 MHz band, namely digital terrestrial television broadcasting services and wireless audio PMSE equipment in accordance with their regulatory status.

Article 5

Open ↗

Member States shall facilitate cross-border coordination agreements with the aim of enabling operation of the systems referred to in Article 3(1)(a) and, where appropriate, of those referred to in Article 3(1)(b), taking into account existing regulatory procedures and rights as well as relevant international agreements.

Article 6

Open ↗

Member States shall monitor the use of the 700 MHz frequency band and report their findings to the Commission upon request or at their own initiative in order to allow timely review of this Decision, as appropriate.

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX PARAMETERS REFERRED TO IN ARTICLE 3 A.    General parameters 1. Pursuant to Article 3(1)(a), within the 703-733 MHz and 758-788 MHz frequency bands, the frequency arrangement shall be as follows: (a) the assigned block sizes shall be in multiples of 5 MHz  ( 1 ) ; (b) the mode of operation shall be Frequency Division Duplex (FDD); the duplex spacing shall be 55 MHz with terminal station transmission (FDD uplink) located in the lower frequency band 703-733 MHz and base station transmission (FDD downlink) located in the upper frequency band 758-788 MHz; (c) the lower frequency limit of an assigned block shall be aligned with or spaced at multiples of 5 MHz from the band edge of 703 MHz. Without prejudice to the right of Member States to organise and use their spectrum for public safety and public security purposes and for defence, if PPDR radio communications are implemented, the technical conditions for wireless broadband electronic communications services in this annex should be used. 2. Pursuant to Article 3(1)(b), the frequency arrangement within the 738-758 MHz frequency band for use in full or in part for terrestrial systems capable of providing wireless broadband electronic communications services, shall be as follows: (a) the upper band edge of the designated spectrum range shall be either 758 MHz or 753 MHz; the latter is only applicable in conjunction with the frequency arrangement pursuant to Section A.3 starting at 753 MHz; (b) the lower band edge of the designated spectrum range shall start at one of the following: 738 MHz, 743 MHz, 748 MHz or 753 MHz; (c) the mode of operation shall be limited to base station (‘downlink-only’) transmission in accordance with the technical parameters in Section B; (d) the assigned block sizes within the designated spectrum range shall be in multiples of 5 MHz  ( 1 ) ; the upper frequency limit of an assigned block shall be aligned with or spaced at multiples of 5 MHz from the upper band edge. 3. Pursuant to Article 3(1)(b), the frequency arrangement within the frequency bands 698-703 MHz, 733-736 MHz, 753-758 MHz and 788-791 MHz for use in full or in part for PPDR radio communications shall be as follows: the mode of operation shall be Frequency Division Duplex; the duplex spacing shall be 55 MHz with terminal station transmission (PPDR uplink) located in one or both of the frequency band 698-703 MHz and 733-736 MHz, and base station transmission (PPDR downlink) located in one or both of the frequency band 753-758 MHz and 788-791 MHz, respectively. The frequency bands 703-733 MHz and 758-788 MHz, or a subset thereof, may also be used for PPDR radio communications. Such use is addressed in Section A.1. 4. Pursuant to Article 3(1)(b), the frequency arrangement within the frequency bands 733-736 MHz and 788-791 MHz for use for M2M radio communications shall be as follows: the mode of operation shall be Frequency Division Duplex; the duplex spacing shall be 55 MHz with terminal station transmission (M2M uplink) located in the 733-736 MHz frequency band and base station transmission (M2M downlink) located in the 788-791 MHz frequency band. 5. Pursuant to Article 3(1)(b), Member States decide on the frequency arrangement within the frequency bands 694-703 MHz and 733-758 MHz for use in full or in part for wireless audio PMSE equipment. In order to improve the coexistence between indoor wireless audio PMSE equipment used within the 694-703 MHz and/or 733-758 MHz frequency bands, and mobile electronic communications networks, Member States shall encourage, where feasible and necessary, the implementation of interference mitigation solutions. B.    Technical conditions for base stations for terrestrial systems capable of providing electronic communications services within the 738-788 MHz frequency band The following technical parameters for base stations called ‘block edge mask’ (BEM) shall be used in order to ensure coexistence between neighbouring networks and protection of other services and applications in adjacent bands. Less stringent technical parameters, if agreed among the operators or administrations concerned, may also be used provided that these parameters comply with the technical conditions applicable for the protection of other services or applications, including in adjacent bands or subject to cross-border obligations. The BEM  ( 2 ) is an emission mask that is defined as a function of frequency in relation to a ‘block edge’, the latter being the frequency boundary of a spectrum block for which rights of use are assigned to an operator. The BEM consists of several elements which are defined for certain measurement bandwidths. A ‘band edge’ denotes the frequency boundary of a spectrum range designated for a certain use. BEMs for base stations given below have been developed for equipment used in mobile networks. The same base station BEM applies both for FDD downlink use within the 758-788 MHz frequency band (as defined in Section A.1) and optional downlink-only use within the 738-758 MHz frequency band (as defined in Section A.2). The BEMs serve to protect other spectrum blocks used for electronic communications services (including downlink-only use) as well as other services and applications in adjacent bands. Additional measures which do not constrain economies of scale of equipment may be applied at national level to further facilitate the coexistence of electronic communications services and other uses within the 700 MHz frequency band. The base station BEM consists of in-block and out-of-block power limits. The in-block power limit is applied to a block assigned to an operator. The out-of-block power limits are applied to spectrum within or outside the 700 MHz frequency band, which is outside the block assigned. Table 1 contains the different spectrum elements of the base station BEM, whereby all BEM elements except ‘in-block’ are mapped to out-of-block power limits. Optional in-block power limits are given in Table 2. Out-of-block power limits for different BEM elements are given in Table 3 to Table 8. To obtain a base station BEM for a specific block within the FDD downlink or within the 738-758 MHz frequency band when used for optional downlink-only use, the BEM elements are used as follows: In-block power limit is used for the block assigned to the operator. — Transitional regions are determined, and corresponding power limits are used. The transitional regions may overlap with guard bands, adjacent bands and the duplex gap, in which case transitional power limits are used. — For remaining assigned spectrum which constitutes baseline (as defined in Table 1), baseline power limits are used. — For remaining spectrum in the guard bands (i.e. not covered by transitional regions or not used for PPDR or M2M radio communications), guard band power limits are used. — For spectrum in the 733-758 MHz frequency band not used for downlink-only or PPDR or M2M radio communications, duplex gap power limits apply. Table 1 Definition of BEM elements for blocks pursuant to Sections A.1 and A.2 BEM element Definition In-block Refers to a block for which the BEM is derived. Baseline Spectrum used within the frequency bands 703-733 MHz (i.e. FDD uplink) and 758-788 MHz (i.e. FDD downlink) as well as within the 738-758 MHz frequency band for downlink-only (if applicable), for digital terrestrial television broadcasting below the 694 MHz band edge, for terrestrial systems capable of providing electronic communications services above 790 MHz (both uplink and downlink), for PPDR radio communications in the 700 MHz frequency band (both uplink and downlink), and for M2M radio communications in the 700 MHz frequency band (both uplink and downlink). Transitional region Spectrum from 0 to 10 MHz below and from 0 to 10 MHz above the block assigned to an operator; in a frequency range where transitional regions and spectrum used for FDD uplink, PPDR uplink or M2M uplink overlap, transitional power limits do not apply. Guard bands (a) Spectrum between the lower edge of the 700 MHz frequency band and the lower edge of the FDD uplink (i.e. 694-703 MHz); (b) Spectrum between the upper edge of FDD downlink (i.e. 788 MHz) and the lower edge of the FDD downlink according to Decision 2010/267/EU (i.e. 791 MHz). In case of overlap between a transitional region and a guard band, transitional power limits are used. When spectrum is used for PPDR or M2M radio communications, baseline or transitional power limits are used. Duplex gap Spectrum in the 733-758 MHz frequency band. In case of overlap between a transitional region and the part of the duplex gap not used for downlink-only or PPDR radio communications or M2M radio communications, transitional power limits are used. In-block requirements Table 2 Base station in-block power limit Frequency range Maximum mean EIRP  ( 3 ) Measurement bandwidth Block assigned to the operator Not mandatory. In case an upper bound is desired by an administration, a value may be applied, which does not exceed 64 dBm/5 MHz per antenna. 5 MHz Out-of-block requirements Table 3 Base station baseline power limit Frequency range Bandwidth of protected block Maximum mean EIRP Measurement bandwidth Uplink frequencies in the range 698-736 MHz  ( 4 ) ≥ 5 MHz – 50 dBm per cell  ( 5 ) 5 MHz 3 MHz – 52 dBm per cell  ( 5 ) 3 MHz  ( 4 ) ≤ 3 MHz – 64 dBm per cell  ( 5 ) 200 kHz  ( 4 ) FDD uplink frequencies as defined in Decision 2010/267/EU (i.e. 832-862 MHz) ≥ 5 MHz – 49 dBm per cell  ( 5 ) 5 MHz Downlink frequencies in the range 738-791 MHz ≥ 5 MHz 16 dBm per antenna 5 MHz 3 MHz 14 dBm per antenna 3 MHz < 3 MHz 2 dBm per antenna 200 kHz FDD downlink frequencies as defined in Decision 2010/267/EU (i.e. 791-821 MHz) ≥ 5 MHz 16 dBm per antenna 5 MHz Table 4 Base station transitional power limits in the range 733-788 MHz Frequency range Maximum mean EIRP Measurement bandwidth – 10 to – 5 MHz from lower block edge 18 dBm per antenna 5 MHz – 5 to 0 MHz from lower block edge 22 dBm per antenna 5 MHz 0 to + 5 MHz from upper block edge 22 dBm per antenna 5 MHz + 5 to + 10 MHz from upper block edge 18 dBm per antenna 5 MHz Table 5 Base station transitional power limits above 788 MHz Frequency range Maximum mean EIRP Measurement bandwidth 788-791 MHz for a block with upper edge at 788 MHz 21 dBm per antenna 3 MHz 788-791 MHz for a block with upper edge at 783 MHz 16 dBm per antenna 3 MHz 788-791 MHz for a block with upper edge at 788 MHz for protection of systems with bandwidth < 3 MHz 11 dBm per antenna 200 kHz 788-791 MHz for a block with upper edge at 783 MHz for protection of systems with bandwidth < 3 MHz 4 dBm per antenna 200 kHz 791-796 MHz for a block with upper edge at 788 MHz 19 dBm per antenna 5 MHz 791-796 MHz for a block with upper edge at 783 MHz 17 dBm per antenna 5 MHz 796-801 MHz for a block with upper edge at 788 MHz 17 dBm per antenna 5 MHz Table 6 Base station power limits for the part of the duplex gap not used for downlink-only or PPDR radio communications or M2M radio communications Frequency range Maximum mean EIRP Measurement bandwidth – 10 to 0 MHz offset from FDD downlink lower band edge or lower edge of the lowest downlink-only block, but above FDD uplink upper band edge 16 dBm per antenna 5 MHz More than 10 MHz offset from FDD downlink lower band edge or lower edge of the lowest downlink-only block, but above FDD uplink upper band edge – 4 dBm per antenna 5 MHz Table 7 Base station power limits for the part of the guard bands not used for PPDR radio communications or M2M radio communications Frequency range Maximum mean EIRP Measurement bandwidth Spectrum between the lower band edge of the 700 MHz frequency band and FDD uplink lower band edge (i.e. 694-703 MHz); – 32 dBm per cell  ( 6 ) 1 MHz Spectrum between FDD downlink upper band edge and the FDD downlink lower band edge as defined in Decision 2010/267/EU (i.e. 788-791 MHz) 14 dBm per antenna 3 MHz Table 8 Base station baseline power limits for spectrum below 694 MHz Frequency range Maximum mean EIRP Measurement bandwidth Frequencies below 694 MHz where digital terrestrial television broadcasting is protected – 23 dBm per cell  ( 7 ) 8 MHz C.    Technical conditions for terminal stations for electronic communications services within the 703-733 MHz frequency band BEMs for terminal stations given below have been developed for equipment used in mobile networks. The terminal station BEM consists of in-block and out-of-block power limits. The in-block power limit is applied to a block assigned to an operator. The out-of-block power limits are applied to the following spectrum elements: the duplex gap between FDD uplink and FDD downlink (including downlink-only spectrum, if applicable), the guard band between the upper limit of spectrum used for television broadcasting (694 MHz) and FDD uplink (i.e. 694-703 MHz), and spectrum used for television broadcasting (i.e. below 694 MHz). The BEM requirements for terminal stations are given in Table 9 to Table 12  ( 8 ) . The power limits are specified as equivalent isotropically radiated power (EIRP) for terminal stations designed to be fixed or installed and as total radiated power (TRP)  ( 9 ) for terminal stations designed to be mobile or nomadic. Administrations may relax the in-block power limit in certain situations, for example fixed terminal stations in rural areas provided that protection of other services, networks and applications is not compromised and cross-border obligations are fulfilled. In-block requirements Table 9 Terminal station in-block power limit Maximum mean power 23 dBm  ( 10 ) Out-of-block requirements Table 10 Terminal station power limits for the guard band 694-703 MHz Frequency range Maximum mean out-of-block EIRP Measurement bandwidth 694-698 MHz – 7 dBm 4 MHz 698-703 MHz 2 dBm 5 MHz Table 11 (non-mandatory) Terminal station power limits for the duplex gap Frequency range Maximum mean out-of-block EIRP Measurement bandwidth 733-738 MHz 2 dBm 5 MHz 738-753 MHz – 6 dBm 5 MHz 753-758 MHz – 18 dBm 5 MHz Explanatory note to Table 11 The power limits have been derived from the spectrum emission mask specified in clause 4.2.3 of ETSI EN 301 908-13 v6.2.1, which means that LTE-based equipment will comply inherently with the emission limits specified in Table 11. No additional test procedure is required to ensure compliance of such equipment with the power limits specified above. Table 12 Terminal station power limits for frequencies below 694 MHz used for terrestrial broadcasting (unwanted emissions) Frequency range Maximum mean out-of-block power Measurement bandwidth 470-694 MHz – 42 dBm 8 MHz Explanatory notes to Table 12 (1) The derivation of the unwanted emissions limit is based on DTT broadcasting using DVB-T2 and a WBB system with a bandwidth of 10 MHz for a centre frequency separation between DTT broadcasting and WBB of 18 MHz (assuming an 8 MHz TV channel, 9 MHz guard band and a WBB system bandwidth of 10 MHz). If Member States wish to allow the deployment of WBB systems on a national basis with a bandwidth greater than 10 MHz and in case unwanted out-of-block power higher than – 42 dBm/8 MHz is generated in the band below 694 MHz, they should consider: (a) either implementing the greater WBB system bandwidth starting at a frequency higher than 703 MHz so that the required limit of out-of-block power is still met; (b) and/or applying mitigation techniques according to note 3. (2) The value of the unwanted out-of-block emissions limit is derived with regard to fixed DTT reception. Member States who wish to consider portable-indoor DTT reception may need, on a case-by-case basis, to implement further measures at a national/local level (see note 3). (3) Examples of potential mitigation techniques which may be considered by Member States include using additional DTT filtering, reducing the in-block power of the terminal station, reducing the bandwidth of the terminal station transmissions, or using techniques contained in the non-exhaustive list of potential mitigation techniques given in CEPT Report 30. (4) Additional considerations on coexistence between WBB systems and DTT broadcasting: in order to mitigate DTT receiver blocking caused by base station transmission, additional external filtering could be applied at the input of the DTT receiver chain at national level, in particular to avoid overload saturation in antenna amplifiers; furthermore, interference from broadcasting transmitters to base station receivers, either caused by transmitter in-band power or unwanted emissions, may arise. In such cases, appropriate mitigation techniques may be applied on a case-by-case basis at national level. ( 1 )   5 MHz or more; this does not preclude smaller channel bandwidths within an assigned block. ( 2 )   The BEM is based on minimum coupling loss (MCL) analysis and simulations; the BEM elements are defined on a per cell or per antenna basis, depending on the co-existence scenario from which they have been derived. ( 3 )   Equivalent Isotropically Radiated Power (EIRP) is the total power radiated in any direction at a single location, independent of any base station configuration. ( 4 )   Administrations may select a measurement bandwidth of 3 MHz or 200 kHz for protection of a block size of 3 MHz depending on the national implemented options. ( 5 )   In a multi-sector site, the value per ‘cell’ corresponds to the value for one of the sectors. ( 6 )   In a multi-sector site, the value per ‘cell’ corresponds to the value for one of the sectors. ( 7 )   In a multi-sector site, the value per ‘cell’ corresponds to the value for one of the sectors. ( 8 )   Further requirements may be taken into account by ETSI in the harmonised standards. ( 9 )   Total radiated power (TRP) is a measure of how much power the antenna actually radiates. The TRP is defined as the integral of the power transmitted in different directions over the entire radiation sphere. ( 10 )   This value is subject to a tolerance of up to + 2 dB, to take account of operation under extreme environmental conditions and production spread.

Other acts of the same type
Council Decision (EU) 2016/834 of 20 May 2016 on the position to be taken on behalf of the European Union within the Joint Committee set up under the Agreement between the European Union and the Republic of Cape Verde on facilitating the issue of short-stay visas to citizens of the Republic of Cape Verde and of the European Union, with regard to the adoption of the rules of procedure of the Joint CommitteeCouncil Decision (EU) 2016/920 of 20 May 2016 on the signing, on behalf of the European Union, of the Agreement between the United States of America and the European Union on the protection of personal information relating to the prevention, investigation, detection, and prosecution of criminal offencesCouncil Decision (EU) 2016/979 of 20 May 2016 concerning the accession of Croatia to the Convention drawn up on the basis of Article K.3 of the Treaty on European Union, on mutual assistance and cooperation between customs administrationsDecision (EU) 2016/868 of the European Central Bank of 18 May 2016 amending Decision ECB/2014/6 on the organisation of preparatory measures for the collection of granular credit data by the European System of Central Banks (ECB/2016/14)Commission Implementing Decision (EU) 2016/775 of 18 May 2016 on the benchmark to allocate greenhouse gas emission allowances free of charge to aircraft operators pursuant to Article 3f(5) of Directive 2003/87/EC of the European Parliament and of the Council (Text with EEA relevance)Commission Implementing Decision (EU) 2016/786 of 18 May 2016 laying down the procedure for the establishment and operation of an independent advisory panel assisting Member States and the Commission in determining whether tobacco products have a characterising flavour (notified under document C(2016) 2921) (Text with EEA relevance)Commission Implementing Decision (EU) 2016/787 of 18 May 2016 laying down a priority list of additives contained in cigarettes and roll-your-own tobacco subject to enhanced reporting obligations (notified under document C(2016) 2923) (Text with EEA relevance)Council Decision (EU) 2016/815 of 17 May 2016 concerning the accession of Croatia to the Convention, drawn up on the basis of Article K.3 of the Treaty on European Union, on the protection of the European Communities' financial interests and to the Protocol of 27 September 1996, the Protocol of 29 November 1996 and the Second Protocol of 19 June 1997 theretoCouncil Decision (EU) 2016/817 of 17 May 2016 on the conclusion, on behalf of the European Union, of the Protocol setting out the fishing opportunities and the financial contribution provided for by the Fisheries Partnership Agreement between the European Community on the one hand, and the Government of Denmark and the Home Rule Government of Greenland, on the other handCouncil Decision (EU) 2016/833 of 17 May 2016 establishing the position to be adopted, on behalf of the European Union, at the 54th session of the Committee of Experts for the Carriage of Dangerous Goods set up by the Intergovernmental Organisation for International Carriage by Rail (OTIF) as regards certain amendments to Appendix C to the Convention concerning International Carriage by RailCouncil Decision (EU) 2016/763 of 13 May 2016 establishing the position to be taken on behalf of the European Union within the Committee on Government Procurement as regards the draft decision on arbitration procedures pursuant to Article XIX:8 of the Revised Agreement on Government ProcurementCommission Implementing Decision (EU) 2016/771 of 13 May 2016 temporarily authorising Spain to approve for marketing seed of the species Pinus radiata D. Don imported from New Zealand, which does not satisfy the requirements of Council Directive 1999/105/EC in respect of identification and labelling, and planting stock produced from that seed (notified under document C(2016) 2784)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next