My bookmarksSign up free
Source

Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan

Commission Implementing Regulation (EU) 2017/6 of 5 January 2017 on the European Rail Traffic Management System European deployment plan

Implementing Regulation (EU) 2017/6 · Regulation · 8 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Subject matter and scope

Article 1

Open ↗

1.   This Regulation lays down the timetable for the deployment of the European Rail Traffic Management System ('ERTMS') on core network corridors as set out in Annex I. 2.   This Regulation does not apply to ERTMS on-board implementation laid down in point 7.3.3 of Annex III to Decision 2012/88/EU.

ETCS specific implementation rules regarding trackside installations

Article 2

Open ↗

1.   Railway infrastructure managers shall equip the core network corridors with ERTMS and put ERTMS into operation in those corridors at the latest by the dates specified in Annex I to this Regulation, including in railway stations and junctions. The railway link to the elements listed in Annex II of Regulation (EU) No 1315/2013 and to the infrastructure components as referred to in Article 11 of Regulation (EU) No 1315/2013 that are located on the core network corridor shall be equipped and put into operation at the date specified for the respective core network corridor section. Deployment shall be in compliance with Articles 1(4), 7(2c) and 39(3) of Regulation (EU) No 1315/2013. 2.   A core network corridor shall be considered equipped with ERTMS when ERTMS is authorised for the placing in service in accordance with Article 15 of Directive 2008/57/EC of the European Parliament and of the Council  ( 6 ) or Article 18 of Directive (EU) 2016/797 of the European Parliament and of the Council  ( 7 ) , allowing passenger and freight traffic in both directions in particular in case of works or disturbances, and, to the extent necessary for operations of ERTMS-only equipped vehicles, sidings. 3.   Railway infrastructure managers, acting in cooperation, shall make an effort to equip and put into operation ERTMS on cross-border sections simultaneously, in a technically consistent manner. The railway infrastructure managers shall, after having consulted the railway undertakings affected, sign an agreement on technical and operational aspects of the deployment for each cross-border section. The railway infrastructure managers shall conclude such an agreement not later than one year before the earlier of the deployment dates for the given cross-border section. This agreement shall provide transitional provisions for taking into account the needs of the railway undertakings' cross-border operations. In case of a disagreement, the Member States concerned shall initiate an active dialogue in order to find common convergent solutions. They may request support from the Commission. The Member States shall notify such agreements to the Commission not later than one month after the conclusion. 4.   The completion dates set out in agreements for projects co-funded by the Union which are earlier than the dates set out in Annex I shall prevail over those dates. 5.   Member States may decide to keep the existing Class B systems, as defined in point 2.2 of the Annex to Regulation (EU) 2016/919. However, by the dates set out in Annex I, the vehicles referred to in point 1.1 of the Annex to Regulation (EU) 2016/919 which are equipped with ERTMS in a version compatible with the track-side equipment, shall be given access to those lines and to the infrastructure components as referred to in Article 11 of Regulation (EU) No 1315/2013 without requiring them to be equipped with a Class B system.

Notifications

Article 3

Open ↗

1.   Once ERTMS is put into operation on a core network corridor section, the Member State concerned shall notify the Commission of that fact within one month, through the systems established under Article 49(1) of Regulation (EU) No 1315/2013 and Article 5(1) of Commission Implementing Decision 2014/880/EU  ( 8 ) . 2.   Member States shall notify the Commission of any delays in putting ERTMS in operation on a given core network corridor section to be equipped. The railway infrastructure managers shall inform the Member States about those delays accordingly. 3.   When notifying the delays referred in paragraph 2, the Member State concerned shall send to the Commission a file containing a technical description of the project and specifying a new date for putting ERTMS into operation. The file shall specify the causes for the delay and shall indicate the corrective measures taken by the railway infrastructure manager. 4.   If the delay results from an exceptional circumstance, the Commission may accept to postpone the relevant date by a maximum of three years. If a postponement is granted, the Member State shall make the necessary amendments to its national implementation plan as referred to in point 7.4.4 of the Annex to Regulation (EU) 2016/919 within one month of granting that postponement. Exceptional circumstance referred to in the first subparagraph means a circumstance resulting from the planning phase and which is related to specific geological findings, environmental or species protection, archaeological finds, permitting procedures, implementation of an environmental impact assessment pursuant to Directive 2014/52/EU of the European Parliament and of the Council  ( 9 ) ; or a circumstance resulting from the construction and authorisation phases that are out of the control of the project promoter and do not fall into the category of the usual risks that should be addressed at project management level in this type of projects. 5.   If ERTMS specifications set out in Regulation (EU) 2016/919 are changed by legislative act in an incompatible way the Member States shall provide the Commission with an analysis of the impact of the application of the modified legal reference on their network and on the ERTMS planning without unreasonable delay, but at latest at the time of the formal opinion of the Committee referred to in Article 51 of Directive (EU) 2016/797. If a direct impact of the changes can be demonstrated in terms of cost or timeline for specific implementations, Annex I shall be adapted accordingly.

Review

Article 4

Open ↗

Not later than 31 December 2023, the Commission shall, after consultation with the Member States, and with the assistance of the European ERTMS Coordinator referred to in Article 45 of Regulation (EU) No 1315/2013, carry out a review of the dates after 1 January 2024 that are laid down in Annex I to this Regulation.

References

Article 5

Open ↗

References to Annex III to Decision 2012/88/EU shall be construed as references to this Regulation and shall be read in accordance with the correlation table in Annex II.

Entry into force

Article 6

Open ↗

This Regulation shall enter into force on 26 January 2017.

Supplementary provisions

ANNEX IISupplementary provisions

Open ↗

ANNEX II Correlation table Decision 2012/88/EU This Regulation Point 7.3.1 of Annex III Article 1 Point 7.3.2 of Annex III Article 1 and 2 Point 7.3.2.1 of Annex III Article 2(1) Point 7.3.2.2 of Annex III Article 2(1) Point 7.3.2.4 of Annex III — Point 7.3.2.5 of Annex III Article 3(1) Point 7.3.2.6 of Annex III Article 3(2), (3) and (4) Point 7.3.4 of Annex III Annex I Point 7.3.5 of Annex III. Article 2(1)

Other acts of the same type
Commission Implementing Regulation (EU) 2019/1140 of 3 July 2019 establishing models for the control reports and annual audit reports concerning financial instruments implemented by the EIB and other international financial institutions in which a Member State is a shareholder in accordance with Regulation (EU) No 1303/2013 of the European Parliament and of the CouncilCommission Implementing Regulation (EU) 2019/1141 of 3 July 2019 amending Council Regulation (EC) No 1210/2003 concerning certain specific restrictions on economic and financial relations with IraqCommission Delegated Regulation (EU) 2019/1866 of 3 July 2019 amending Delegated Regulation (EU) 2017/653 to align the transitional arrangement for PRIIP manufacturers offering units of funds referred to in Article 32 of Regulation (EU) No 1286/2014 of the European Parliament and of the Council as underlying investment options with the prolonged exemption period under that Article (Text with EEA relevance)Commission Implementing Regulation (EU) 2019/1129 of 2 July 2019 amending Implementing Regulation (EU) No 79/2012 laying down detailed rules for implementing certain provisions of Council Regulation (EU) No 904/2010 concerning administrative cooperation and combating fraud in the field of value added taxCommission Implementing Regulation (EU) 2019/1130 of 2 July 2019 on the uniform conditions for the harmonised application of territorial typologies pursuant to Regulation (EC) No 1059/2003 of the European Parliament and of the CouncilCommission Implementing Regulation (EU) 2019/1131 of 2 July 2019 establishing a customs tool in order to implement Article 14a of Regulation (EU) 2016/1036 of the European Parliament and of the Council and Article 24a of Regulation (EU) 2016/1037 of the European Parliament and of the CouncilCommission Implementing Regulation (EU) 2019/1132 of 2 July 2019 providing temporary exceptional adjustment aid to farmers in the beef and veal sector in IrelandCommission Implementing Regulation (EU) 2019/1173 of 2 July 2019 entering a name in the register of protected designations of origin and protected geographical indications (‘Ayrshire New Potatoes’/‘Ayrshire Earlies’ (PGI))Commission Delegated Regulation (EU) 2019/2035 of 28 June 2019 supplementing Regulation (EU) 2016/429 of the European Parliament and of the Council as regards rules for establishments keeping terrestrial animals and hatcheries, and the traceability of certain kept terrestrial animals and hatching eggs (Text with EEA relevance)Commission Implementing Regulation (EU) 2019/1100 of 27 June 2019 concerning the non-renewal of approval of the active substance desmedipham, in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market, and amending the Annex to Commission Implementing Regulation (EU) No 540/2011 (Text with EEA relevance.)Commission Implementing Regulation (EU) 2019/1101 of 27 June 2019 renewing the approval of the active substance tolclofos-methyl in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market, and amending the Annex to Commission Implementing Regulation (EU) No 540/2011 (Text with EEA relevance.)Commission Regulation (EU) 2019/1102 of 27 June 2019 amending Regulation (EC) No 2003/2003 of the European Parliament and of the Council relating to fertilisers for the purposes of adapting Annexes I and IV (Text with EEA relevance.)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next