My bookmarksSign up free

Commission Implementing Decision (EU) 2018/1135 of 10 August 2018 establishing the type, format and frequency of information to be made available by the Member States for the purposes of reporting on the implementation of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2018) 5009) (Text with EEA relevance.)

Commission Implementing Decision (EU) 2018/1135 of 10 August 2018 establishing the type, format and frequency of information to be made available by the Member States for the purposes of reporting on the implementation of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2018) 5009) (Text with EEA relevance.)

Implementing Decision (EU) 2018/1135 · Decision · 4 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

For installations covered by Chapters II, III and IV of Directive 2010/75/EU, with the exception of waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour, Member States shall make available to the Commission the information set out in Annex I using the format laid down in that Annex, for each installation covered. For waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour and for installations covered by Chapter V of Directive 2010/75/EU, Member States shall make available to the Commission the information set out in Annex II using the format laid down in that Annex. Member States shall report the information set out in Annexes I and II using the harmonised electronic reporting tool made available by the Commission.

Article 2

The information set out in Annex I shall be first submitted for the reporting year 2017 unless otherwise stated in that Annex. For that reporting year, the information shall be submitted by 30 June 2019 at the latest. For subsequent reporting years, the information set out in Annex I shall be submitted every year within 9 months of the end of the reporting year. The information set out in Annex II shall be first submitted for reporting years 2017 and 2018. For those reporting years, the information shall be submitted by 30 September 2019 at the latest. For subsequent reporting years, the information set out in Annex II shall be submitted every three years within 9 months of the end of the last of those reporting years This Decision is addressed to the Member States.

Supplementary provisions

ANNEX ISupplementary provisions

ANNEX I Information on installations covered by Chapters II, III and IV of Directive 2010/75/EU [with the exception of waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour] Note: Member States may indicate information which they consider to be confidential, giving the grounds that are considered to preclude the Commission from making it publicly available. 1.1. Contextual information Type Format 1.1.1. Country identifier Identification of the country where the reported installations and installation parts are located. 1.1.2. Reporting year Calendar year to which the reporting refers. 1.2 Information on all installations covered by Chapter II of Directive 2010/75/EU Type Format 1.2.1. inspireId Unique identifier of the installation that follows the requirements of Directive 2007/2/EC. 1.2.2. thematicId  ( 1 ) Thematic object identifier. 1.2.3. pointGeometry Latitude and longitude (coordinates for the approximate centre of the installation) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. 1.2.4. Name of the installation Official denomination, proper name or conventional name of the installation. 1.2.5. Status The operational status of the installation 1.2.6. Competent authority For activities covered by Annex I to Directive 2010/75/EU, the name of and contact information for: (a) the competent authority or authorities responsible for granting permits under Chapter II of that Directive; (b) the competent authority or authorities responsible for inspections under Chapter II of that Directive. 1.2.7. Activities carried out Identification of all activities covered by Annex I to Directive 2010/75/EU carried out within the installation. 1.2.8. BAT conclusions As from the reporting year 2018, identification of the Commission Implementing Decisions on BAT conclusions that are applicable to any of the activities carried out at the installation. 1.2.9. Other relevant Chapters under Directive 2010/75/EU Identification of the Chapters of Directive 2010/75/EU that apply to the installation (or part thereof). 1.2.10. Baseline report submitted An indication of whether a baseline report as referred to in Article 22(2) of Directive 2010/75/EU, has been submitted to the competent authority. 1.2.11. Permit granted (a) An indication of whether a permit to operate the installation has been granted under Article 5 of Directive 2010/75/EU. (b) URL(s) where the permit(s) is/are made available to the public. (c) As from the reporting year 2018, if no permit has been granted under Article 5 of Directive 2010/75/EU, a description of what enforcement action has been taken. 1.2.12. Reconsideration of permit conditions (a) An indication of whether permit conditions have been reconsidered in accordance with Article 21(3) of that Directive. (b) If applicable, the date on which the permit conditions were updated in accordance with Article 21(3) of Directive 2010/75/EU. 1.2.13. BAT derogation under Article 15(4) of Directive 2010/75/EU For installations where the permit conditions have been reconsidered in accordance with Article 21(3) of that Directive, an indication of whether a derogation was granted under its Article 15(4). As from the reporting year 2018, where a derogation has been granted, information about: (a) the URL making available to the public the specific reasons for the derogation, in accordance with Article 24(2)(f) of Directive 2010/75/EU; (b) the Commission Implementing Decision on BAT conclusions from which the derogation was granted; (c) the BAT-Associated Emission Level (BAT-AEL) from which the derogation was granted; (d) if applicable, the duration of the derogation. 1.2.14. Stricter permit conditions As from the reporting year 2018, for installations where the permit conditions have been reconsidered in accordance with Article 21(3), a specification of whether the permit sets stricter emission limit values than the lower value of the BAT-AEL range, indicating: (a) the applicable Commission Implementing Decisions on BAT conclusions; (b) the applicable BAT-AEL; (c) whether those stricter emission limit values were set pursuant to Article 14(4) or Article 18 of Directive 2010/75/EU or both of those Articles. 1.2.15. Site visits (inspections) (a) The number of site visits to the production installation which were carried out by the competent authority during the reporting year. (b) As from the reporting year 2018, the specific URL of the last site visit report, or a generic URL explaining how individual visit reports can be publicly accessed in accordance with Article 23(6) second subparagraph. 1.2.16. Emission monitoring data As from the reporting year 2018, an indication of how the results of emission monitoring have been made available to the public under Article 24(3)(b), including a URL if websites have been created for this purpose. 1.2.17. eSPIRS identifier As from the reporting year 2018, where the installation is covered by Directive 2012/18/EU the Seveso Plants Information Retrieval System identifier (‘eSPIRS identifier’) for the establishment in which the installation is located. Optional. 1.2.18. Emissions Trading Scheme identifier As from the reporting year 2018, where the installation is, fully or partly, covered by Directive 2003/87/EC the identifier used for reporting under that Directive. Optional. 1.2.19. Remarks Any other relevant information. Optional. 1.3 Additional information on large combustion plants covered by Chapter III and waste incineration and waste co-incineration plants with a capacity of 2 tonnes or more per hour covered by Chapter IV of Directive 2010/75/EU  ( 2 ) Type Format 1.3.1    General information 1.3.1.a. inspireId Unique identifier that follows the requirements of Directive 2007/2/EC, as further specified in Regulation (EU) No 1089/2010, in particular point 8 of Annex IV to that Regulation, as amended. 1.3.1 b. thematicId  ( 3 ) Thematic object identifier. 1.3.1.c. pointGeometry Latitude and longitude (coordinates for the approximate centre of the plant) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. 1.3.1.d. Name of the plant Official denomination or proper or conventional name of the plant. 1.3.1.e. Status The operational status of the plant. 1.3.2.    Information on large combustion plants 1.3.2.a. Total rated thermal input Total rated thermal input of the large combustion plant. 1.3.2.b. Derogations under Directive 2010/75/EU Details of any derogations as provided for in Articles 31 to 35 of Directive 2010/75/EU granted in respect of the large combustion plant. 1.3.2.c. Remarks Any other relevant information. Optional. 1.3.3.    Information on waste incineration and waste co-incineration plants with a nominal capacity of 2 tonnes or more per hour 1.3.3.a. Total nominal capacity Total nominal capacity of the waste incineration or waste co-incineration plant. 1.3.3.b. Permitted capacity for hazardous waste Total permitted capacity for hazardous waste incineration and co-incineration. 1.3.3.c. Permitted capacity for non-hazardous waste Total permitted capacity for non-hazardous waste incineration and co-incineration. 1.3.3.d. Article 46(2) of Directive 2010/75/EU on emission control safeguards As from the reporting year 2018, an indication of: (a) whether more than 40 % of the heat release resulting from the incineration comes from hazardous waste; (b) whether untreated mixed municipal waste is co-incinerated. 1.3.3.e. Specific conditions (a) An indication of whether a change of the operating conditions has been authorised under Article 51 of Directive 2010/75/EU. (b) If applicable, further information on the nature of the authorised change to the operating conditions. (c) As from the reporting year 2018, if applicable: (i) a URL for the permit setting out the operating conditions; (ii) the URL of the last site visit report made publicly available pursuant to Article 23(6), or a URL where it is explained how this report can be publicly accessed. 1.3.3.f. Public disclosure As from the reporting year 2018, an indication of how the information referred to in Article 55(2) of Directive 2010/75/EU has been made available to the public, including a URL if websites have been created for this purpose. 1.3.3.g. Remarks Any other relevant information. Optional. 1.4 Information where the IED installation is part of or coincides with a Facility  ( 4 ) Type Format 1.4.1. inspireId Unique identifier of the facility that follows the requirements of Directive 2007/2/EC. 1.4.2. thematicId  ( 5 ) Thematic object identifier. 1.4.3. riverBasinDistrict Code identifier and/or name assigned to the basin district of a watercourse. 1.4.4. Geometry Latitude and longitude (coordinates for the approximate centre of the facility) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. 1.4.5. Function Activities performed by the facility. Function is described by the activity of the facility expressed as NACE-code. 1.4.6. Name of the facility Official denomination or proper or conventional name of the facility. 1.4.7. Status The operational status of the facility. 1.4.8. Remarks Any other relevant information. Optional. ( 1 )   This field has a multiplicity of 0-1 under INSPIRE. ( 2 )   For the waste incineration and waste co-incineration plants with a capacity between 2 to 3 tonnes/hour the data only has to be submitted as from the reporting year 2018. ( 3 )   This field has a multiplicity of 0-1 under INSPIRE. ( 4 )   This is a ‘Production Facility’ as defined in Regulation (EU) No 1089/2010, Annex IV, point 8.2.1 as ‘one or more installations on the same site operated by the same natural or legal person, designed, built or installed to serve specific production or industrial purposes, comprehending all infrastructure, equipment and materials’ and covered by Regulation (EC) N o 166/2006. ( 5 )   This field has a multiplicity of 0-1 under INSPIRE

ANNEX IISupplementary provisions

ANNEX II Information on waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour and on installations covered by Chapter V of Directive 2010/75/EU 2.1. Waste incineration plants or waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour A reference to the list of such installations made publicly available in accordance with Article 55(3) of Directive 2010/75/EU. 2.2. Installations covered by Chapter V of Directive 2010/75/EU (installations using organic solvents) (a) Total number of installations covered by Chapter V of Directive 2010/75/EU. (b) Number of installations complying with Article 59(1)(b) of Directive 2010/75/EU. (c) Number of installations for which a derogation as provided for in Article 59(2) of Directive 2010/75/EU has been granted. (d) Number of installations for which a derogation as provided for in Article 59(3) of Directive 2010/75/EU has been granted.

Other acts of the same type
Council Decision (EU) 2022/2490 of 8 December 2022 authorising the European Commission and the High Representative of the Union for Foreign Affairs and Security Policy to open negotiations for a Comprehensive Agreement between the European Union and its Member States, of the one part, and the Republic of Tajikistan, of the other partCouncil Decision (EU) 2022/2505 of 8 December 2022 on the position to be taken on behalf of the European Union within the Joint Committee established by the Agreement between the European Community, of the one part, and the Government of Denmark and the Home Government of the Faroe Islands, of the other part, as regards the adoption of the Rules of Procedure of the Joint CommitteeCommission Decision of 7 December 2022 setting up a Commission expert group on public health and repealing Commission Decision setting up a Commission expert group ‘Steering Group on Health Promotion, Disease Prevention and Management of Non-Communicable Diseases’ (Text with EEA relevance) 2022/C 471/08Commission Decision of 7 December 2022 instructing the Central Administrator of the European Union Transaction Log to enter changes to the national allocation tables of Belgium, Czechia, Denmark, Germany, Ireland, Spain, France, Croatia, Italy, Latvia, Lithuania, the Netherlands, Austria, Poland, Portugal, Romania, Slovenia, Slovakia, Finland and Sweden into the European Union Transaction Log 2023/C 46/02Decision 2022/C 478/09Council Implementing Decision (EU) 2022/2385 of 6 December 2022 amending Implementing Decision 2013/805/EU authorising the Republic of Poland to introduce measures derogating from point (a) of Article 26(1) and Article 168 of Directive 2006/112/EC on the common system of value added taxCouncil Implementing Decision (EU) 2022/2411 of 6 December 2022 amending Decision 2007/441/EC authorising the Italian Republic to apply measures derogating from Articles 26(1)(a) and 168 of Directive 2006/112/EC on the common system of value added taxCommission Implementing Decision (EU) 2022/2427 of 6 December 2022 establishing the best available techniques (BAT) conclusions, under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions, for common waste gas management and treatment systems in the chemical sector (notified under document C(2022) 8788) (Text with EEA relevance)Council Decision (CFSP) 2022/2376 of 5 December 2022 amending Decision (CFSP) 2020/1999 concerning restrictive measures against serious human rights violations and abusesCouncil Decision (CFSP) 2022/2377 of 5 December 2022 amending Decision 2010/788/CFSP concerning restrictive measures in view of the situation in the Democratic Republic of the CongoCommission Implementing Decision (EU) 2022/2386 of 5 December 2022 concerning the extension of the actions permitting the making available on the market and use of the biocidal product Biobor JF in accordance with Regulation (EU) No 528/2012 of the European Parliament and of the Council (notified under document C(2022) 8673) (Only the English, Estonian, Finnish, French, German, Hungarian, Maltese, Spanish and Swedish texts are authentic)Council Decision (EU) 2022/2408 of 5 December 2022 on the position to be taken on behalf of the European Union in the Regional Steering Committee of the Transport Community as regards the amendment of the Regional Steering Committee rules of procedure, of the Staff Regulations, and as regards the introduction of the rules of procedure of the Conciliation Committee and of the rules on dispute settlement for the Transport Community Permanent Secretariat

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

What to look at next