LawPlayer
My bookmarksSign up freeSign up free
Source

Commission Implementing Decision (EU) 2018/1478 of 3 October 2018 amending Implementing Decision (EU) 2016/2323 to update the European List of ship recycling facilities established pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance.)

Commission Implementing Decision (EU) 2018/1478 of 3 October 2018 amending Implementing Decision (EU) 2016/2323 to update the European List of ship recycling facilities established pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance.)

Implementing Decision (EU) 2018/1478 · Decision · 3 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.

Article 2

Open ↗

This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union .

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX THE EUROPEAN LIST OF SHIP RECYCLING FACILITIES REFERRED TO IN ARTICLE 16(1) OF REGULATION (EU) No 1257/2013 Ship recycling facilities located in a Member State of the Union Name of the facility Method of recycling Type and size of ships that can be recycled Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority  ( 1 ) Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility  ( 2 ) Date of expiry of inclusion in the European List  ( 3 ) BELGIUM NV Galloo Recycling Ghent Scheepszatestraat 9 9000 Gent BELGIUM Phone: +32 92512521 Email: peter.wyntin@galloo.com Alongside (wet berth), slope Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 265 meters   Width: 36 meters   Draught: 12,5 meters   Tacit approval, with a maximum review period of 30 days 34 000  ( 4 ) 31 March 2020 DENMARK Fornæs ApS Rolshøjvej 12-16 8500 Grenå DENMARK www.fornaes.dk Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 150 meters   Width: 25 meters   Draught: 6 meters   GT: 10 000 The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities. Tacit approval, maximum review period of 14 days 30 000  ( 5 ) 30 June 2021 Smedegaarden A/S Vikingkaj 5 6700 Esbjerg DENMARK www.smedegaarden.net Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 170 meters   Width: 40 meters   Draught: 7,5 meters   Tacit approval, maximum review period of 14 days 20 000  ( 6 ) 15 September 2021 ESTONIA OÜ BLRT Refonda Baltic Afloat at the quayside and in the floating dock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 197 meters   Width: 32 meters   Draught: 9,6 meters   GT: 28 000 Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13 The facility can recycle only these hazardous materials for which it has been licensed. Tacit approval, with a maximum review period of 30 days. 21 852  ( 7 ) 15 February 2021 SPAIN DDR VESSELS XXI, S.L. Port of ‘El Musel’ Gijon SPAIN Phone: +34 630144416 Email: abarredo@ddr-vessels.com Dismantling ramp Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, except nuclear ships. Maximum ship dimensions: Length: 84,95 meters (Ships up to 169,9 meters which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study) The limitations are included in the integrated environmental authorisation. No express procedure defined yet. 0  ( 8 ) 28 July 2020 FRANCE Démonaval Recycling ZI du Malaquis Rue François Arago 76580 LE TRAIT FRANCE Phone: + 33 769791280 Email: patrick@demonaval-recycling.fr Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock):   Length: 140 meters   Width: 25 meters   Depth: 5 meters Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment 0  ( 9 ) 11 December 2022 Gardet & De Bezenac Recycling/Groupe BAUDELET ENVIRONNEMENT – GIE MUG 616, Boulevard Jules Durand 76600 Le Havre FRANCE Phone: +33 235951634 Email: infos@gardet-bezenac.com Floating and slipway Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 150 meters   Width: 18 meters   LDT: 7 000 Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 16 000  ( 10 ) 30 December 2021 Grand Port Maritime de Bordeaux 152, Quai de Bacalan — CS 41320 - 33082 Bordeaux Cedex FRANCE Phone: +33 556905800 Email: maintenance@bordeaux-port.fr Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock):   Length: 240 meters   Width: 37 meters   Depth: 17 meters Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 18 000  ( 11 ) 21 October 2021 Les Recycleurs bretons Zone Industrielle de Kerbriant - 29 610 Plouigneau FRANCE Phone: +33 298011106 Email: navaleo@navaleo.fr Alongside, drydock Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (drydock):   Length: 225 meters   Width: 34 meters   Depth: 27 meters Environmental limitations are defined in the prefectural authorisation. Explicit approval – The competent authority for the approval decision is the minister of environment. 5 500  ( 12 ) 24 May 2021 LATVIA A/S ‘Tosmares kuģubūvētava’ Ģenerāļa Baloža street 42/44, Liepaja, LV-3402 LATVIA Phone: +371 63401919 Email: shipyard@tosmare.lv Ship dismantling (wet berth and dry dock) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 165 m   Width: 22 m   Depth: 7 m   DWT: 14 000   GT: 200 - 12 000   Weight: 100 – 5 000 tonnes   LDT: 100 -5 000 See national permit No. LI10IB0024. Explicit approval — written notification in 30 working days 0  ( 13 ) 11 June 2020 LITHUANIA UAB APK Minijos 180 (berth 133A), LT 93269, Klaipėda, LITHUANIA Phone: +370 46365776 Fax +370 46365776 Email: uab.apk@gmail.com Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 130 meters   Width: 35 meters   Depth: 10 meters   GT: 3 500 See national permit No. TL-KL.1-15/2015 Explicit approval — written notification in 30 working days 1 500  ( 14 ) 17 March 2020 UAB Armar Minijos 180 (berths 127A, 131A), LT 93269, Klaipėda, LITHUANIA Phone: +370 68532607 Email: armar.uab@gmail.com; albatrosas33@gmail.com Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions (berth 127A):   Length: 80 meters   Width: 16 meters   Depth: 6 meters   GT: 1 500 Maximum ship dimensions (berth 131A):   Length: 80 meters   Width: 16 meters   Depth: 5 meters   GT: 1 500 See national permit No. TL-KL.1-16/2015 (berth 127A) See national permit No. TL-KL.1-51/2017 (berth 131A) Explicit approval — written notification in 30 working days 3 910  ( 15 ) 17 March 2020 (berth 127A) 19 April 2022 (berth 131A) UAB Vakaru refonda Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda, LITHUANIA Phone: +370 46483940/483891 Fax +370 46483891 Email: refonda@wsy.lt Alongside (wet berth) Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013 Maximum ship dimensions:   Length: 230 meters   Width: 55 meters   Depth: 14 meters   GT: 70 000 See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015 Explicit approval — written notification in 30 working days 20 140  ( 16 ) 21 May 2020 NETHERLANDS Keppel-Verolme Prof. Gerbrandyweg 25 3197 KK Rotterdam-Botlek THE NETHERLANDS Phone: +31 181234353 Email: mzoethout@keppelverolme.nl Shipbreaking Maximum ship dimensions:   Length: 405 meters   Width: 90 meters   Depth: 11,6 meters The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 52 000  ( 17 ) 21 July 2021 Scheepssloperij Nederland B.V. Havenweg 1; 3295 XZ s-Gravendeel Postbus 5234; 3295 ZJ s-Gravendeel THE NETHERLANDS Phone: +31 786736055 Email: info@sloperij-nederland.nl Shipbreaking Maximum ship dimensions:   Length: 200 meters   Width: 33 meters   Depth: 6 meters   Height: 45 meters (Botlekbridge) Recycling operations start on water to make the hull lighter; the winch to haul ships on the ramp can pull 2 000 tonnes. The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner. Explicit approval 9 300  ( 18 ) 27 September 2021 PORTUGAL Navalria — Docas, Construções e Reparações Navais Porto Comercial, Terminal Sul, Apartado 39, 3811-901 Aveiro PORTUGAL Phone: +351 234378970, +351 232767700 email: info@navalria.pt Dry dock dismantling, decontamination and dismantling on an horizontal plane and inclined plane, according to the ship's size Nominal capacity of the horizontal plane: 700 tonnes Nominal capacity of the inclined plane: 900 tonnes   Conditions applied to the activity are defined in specifications annexed to Title (AL n. o 5/2015/CCDRC, of 26 January 2016 1 900 tonnes  ( 19 ) 26 January 2020 UNITED KINGDOM Able UK Limited Teesside Environmental Reclamation and Recycling Centre Graythorp Dock Tees Road Hartlepool Cleveland TS25 2DB UNITED KINGDOM Phone: +44 1642806080 Email: info@ableuk.com Ship dismantling and associated treatment authorised with dry dock and wet berth Any ship within the dimensions authorised within the permit. Maximum ship dimensions:   Length: 337,5 meters   Beam: 120 meters   Draft: 6,65 meters The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility. Explicit approval 66 340  ( 20 ) 6 October 2020 Dales Marine Services Ltd Imperial Dry Dock Leith Edinburgh EH6 7DR UNITED KINGDOM Contact:   Phone: +44 1314543380   Email: leithadmin@dalesmarine.co.uk; b.robertson@dalesmarine.co.uk Ship dismantling and associated treatment authorizsd within a drydock, and wet berth Any ship up to a maximum of 7 000 tonnes Maximum ship dimensions:   Length: 165 meters   Beam: 21 meters   Draft: 7,7 meters The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility. Explicit approval 7 275  ( 21 ) 2 November 2022 Harland and Wolff Heavy Industries Limited Queen's Island Belfast BT3 9DU UNITED KINGDOM Phone: +44 2890458456 Email: trevor.hutchinson@harland-wolff.com Ship dismantling and associated treatment authorised with dry dock, and wet berth Any ship with the dimensions detailed in the agreed Working Plan. Maximum ship dimensions: The main dock (the largest) is 556 m × 93 m × 1,2 m DWT, and can take vessels up to this size. This largest dry dock is 1,2 million DWT. The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a waste management licence, authorisation number LN/07/21/V2 that limits the operations and places conditions on the operator of the facility. Explicit approval 13 200  ( 22 ) 3 August 2020 Swansea Drydock Ltd Prince of Wales Dry Dock Swansea Wales SA1 1LY UNITED KINGDOM Phone: +44 1792654592 Email: info@swanseadrydocks.com Ship dismantling and associated treatment authorised with dry dock, and wet berth Any ship within the dimensions authorised within the permit. Maximum ship dimensions:   Length: 200 meters   Beam: 27 meters   Draft: 7 meters Site has a Ship Recycling Facility Plan that meets with the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a permit (Reference EPR/UP3298VL) that limits the operations and places conditions on the operator of the facility. Explicit approval 7 275  ( 23 ) 2 July 2020 ( 1 )   As referred to in Article 7(3) of Regulation (EU) No 1257/2013 on ship recycling. ( 2 )   As referred to in the third sentence of Article 32(1)(a) of Regulation (EU) No 1257/2013. ( 3 )   The date of expiry of inclusion in the European List corresponds to the date of expiry of the permit or authorisation granted to the facility in the Member State. ( 4 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year. ( 5 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year. ( 6 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 50 000 LDT per year. ( 7 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year. ( 8 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 60 000 LDT per year. ( 9 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year. ( 10 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 18 000 LDT per year. ( 11 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 23 000 LDT per year. ( 12 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 10 000 LDT per year. ( 13 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 15 000 LDT per year. ( 14 )   According to its permit, the facility is authorised to recycle a maximum 30 000 LDT per year. ( 15 )   According to its permits, the facility is authorised to recycle a maximum 12 000 LDT per year (6 000 LDT per berth). ( 16 )   According to its permit, the facility is authorised to recycle a maximum 45 000 LDT per year. ( 17 )   According to its permit, the theoretical maximum annual ship recycling capacity of the facility is 100 000 tonnes per year. ( 18 )   According to the information submitted, the theoretical maximum annual ship recycling capacity of the facility is 45 000 LDT per year. ( 19 )   No information on theoretical maximum annual ship recycling capacity was provided. ( 20 )   According to its permit, the facility is authorised to recycle a maximum of 230 000 tonnes per year. ( 21 )   According to its permit, the facility is authorised to recycle a maximum of 7 275 tonnes per year. ( 22 )   According to its permit, the facility is authorised to recycle a maximum of 300 000 tonnes per year. ( 23 )   According to its permit, the facility is authorised to recycle a maximum of 74 999 tonnes per year.

Other acts of the same type
Council Decision (EU) 2019/78 of 20 December 2018 on the conclusion, on behalf of the Union, of the Agreement between the European Union and the Republic of Mauritius amending the Agreement between the European Community and the Republic of Mauritius on the short-stay visa waiverCouncil Decision (EU) 2019/79 of 20 December 2018 on the conclusion, on behalf of the Union, of the Agreement between the European Union and the Republic of Seychelles amending the Agreement between the European Community and the Republic of Seychelles on the short-stay visa waiverCouncil Decision (EU) 2019/80 of 20 December 2018 on the conclusion, on behalf of the Union, of the Agreement between the European Union and the Federation of St Kitts and Nevis amending the Agreement between the European Community and the Federation of Saint Kitts and Nevis on the short-stay visa waiverCouncil Decision (EU) 2019/105 of 20 December 2018 on the position to be taken, on behalf of the European Union, within the Association Council established by the Euro-Mediterranean Agreement establishing an association between the European Communities and their Member States, of the one part, and the State of Israel, of the other part, concerning the extension of the EU-Israel Action PlanCouncil Decision (EU) 2019/222 of 20 December 2018 on the position to be taken, on behalf of the European Union, within the Joint Committee established by the Euro-Mediterranean Interim Association Agreement on trade and cooperation between the European Community, of the one part, and the Palestine Liberation Organization (PLO) for the benefit of the Palestinian Authority (PA) of the West Bank and the Gaza Strip, of the other part, concerning the extension of the EU-PA Action PlanCommission Implementing Decision (EU) 2018/2045 of 19 December 2018 renewing the authorisation for the placing on the market of products containing, consisting of or produced from genetically modified maize NK603 × MON 810 (MON-ØØ6Ø3-6 × MON-ØØ81Ø-6) pursuant to Regulation (EC) No 1829/2003 of the European Parliament and of the Council (notified under document C(2018) 8239) (Text with EEA relevance.)Commission Implementing Decision (EU) 2018/2046 of 19 December 2018 authorising the placing on the market of products containing, consisting of or produced from genetically modified maize MON 87427 × MON 89034 × 1507 × MON 88017 × 59122, and genetically modified maize combining two, three or four of the single events MON 87427, MON 89034, 1507, MON 88017 and 59122 and repealing Decision 2011/366/EU (notified under document C(2018) 8238) (Text with EEA relevance.)Council Decision (EU) 2019/3 of 19 December 2018 on the position to be taken on behalf of the European Union within the Regional Steering Committee of the Transport Community as regards certain budgetary matters in relation to the implementation of the Treaty establishing the Transport CommunityCommission Decision (EU) 2019/61 of 19 December 2018 on the sectoral reference document on best environmental management practices, sector environmental performance indicators and benchmarks of excellence for the public administration sector under Regulation (EC) No 1221/2009 on the voluntary participation by organisations in a Community eco-management and audit scheme (EMAS)Text with EEA relevance.Commission Decision (EU) 2019/62 of 19 December 2018 on the sectoral reference document on best environmental management practices, sector environmental performance indicators and benchmarks of excellence for the car manufacturing sector under Regulation (EC) No 1221/2009 on the voluntary participation by organisations in a Community eco-management and audit scheme (EMAS)Text with EEA relevance.Commission Decision (EU) 2019/63 of 19 December 2018 on the sectoral reference document on best environmental management practices, sector environmental performance indicators and benchmarks of excellence for the electrical and electronic equipment manufacturing sector under Regulation (EC) No 1221/2009 of the European Parliament and of the Council on the voluntary participation by organisations in a Community eco-management and audit scheme (EMAS)Text with EEA relevance.Administrative Commission for the Coordination of Social Security Systems — Decision No F3 of 19 December 2018 concerning the interpretation of Article 68 of Regulation (EC) No 883/2004 relating to the method for the calculation of the differential supplement (Text of relevance to the EEA and to the EC/Switzerland Agreement.)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next