Processing of waste
Article 31
The persons or undertakings referred to in the first subparagraph of Article 3(1) shall give advance notification to the Commission of any processing campaign of material that has previously been declared as retained or conditioned waste, excluding repackaging or further conditioning without separation of elements. This advance notification, using the form set out in Annex XII, shall include information on the amount of plutonium, high enriched uranium and uranium-233 per batch, the form (glass, high active liquid, etc.), the expected duration of the campaign, and the location of the material before and after the campaign. Such notification shall be communicated to the Commission at least 200 days before the campaign starts.