My bookmarksSign up free

2009/337/EC: Commission Decision of 20 April 2009 on the… Article 5

2009/337/EC: Commission Decision of 20 April 2009 on the… Article 5

Article 5

1.   In the case of loss of structural integrity for tailings dams, human lives shall be deemed to be threatened where water or slurry levels are at least 0,7 m above ground or where water or slurry velocities exceed 0,5 m/s. 2.   The assessment of the potential for loss of life and danger to human health, shall comprise at least the following factors: (a) the size and properties of the facility including its design; (b) the quantity and quality including physical and chemical properties of the waste in the facility; (c) the topography of the facility site, including damping features; (d) the travel time of a potential flood-wave to areas where people are present; (e) the propagation velocity of the flood-wave; (f) the predicted water or slurry level; (g) the rising rate of water or slurry levels; (h) any relevant, site-specific factors that may influence the potential for loss- of- life or for danger to human health.

Read the full instrument →

Other provisions in 2009/337/EC: Commission Decision of 20 April 2009 on the…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 5 of 2009/337/EC: Commission Decision of 20 April 2009 on the… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next