ANNEX IISupplementary provisions
ANNEX II KNOWLEDGE-SHARING REQUIREMENTS A. Technical set-up and performance — reliability, — CO 2 captured, — performance at different levels, including differences between expected and real performance, — increase in fuel demand; electricity, heat and cooling demand, — key inputs and outputs and design, — future identified Research and Development issues, B. Cost level — capital and operating costs, — totals and costs per unit performance (tonne CO 2 stored, clean MWh produced), C. Project management — legislation/permitting, — stakeholder management, including interaction with Governments, — planning, — project organisation, D. Environmental impact — effectiveness: reduction of CO 2 emissions per unit energy, — other environmental impacts at undisturbed operation, E. Health and safety — incidents and near misses occurred (disturbed operation), — monitoring and resolution systems to track safety, — health issues in undisturbed operation, F. CCS storage site performance — models and simulations (development CO 2 plume – pressure front), — history match results and adjustments (assessment to be made: normal within a deviation range or significant irregularity that needs action), — behaviour of displaced brine through CO 2 injection.