My bookmarksSign up free

2010/713/EU: Commission Decision of 9 November 2010 on… ANNEX III

2010/713/EU: Commission Decision of 9 November 2010 on… ANNEX III

ANNEX IIISupplementary provisions

ANNEX III CORRELATION TABLE Decisions 2008/164/EC, 2008/163/EC, 2008/217/EC, 2008/284/EC, 2006/860/EC, 2008/232/EC, 2006/679/EC, 2006/66/EC, 2006/861/EC Decision No 768/2008/EC This Decision Module A. Internal production control Module A. Internal production control Module CA. Internal production control Module A1. Internal design control with product verification Module A1. Internal production control plus supervised product testing Module CA1. Internal production control plus product verification by individual examination   Module A2. Internal production control plus supervised product checks at random intervals Module CA2. Internal production control plus product verification at random intervals Module B. Type examination Module B. EC-type examination Module CB. EC-type examination Module C. Conformity to type Module C. Conformity to type based on internal production control Module CC. Conformity to type based on internal production control   Module C1. Conformity to type based on internal production control plus supervised product testing     Module C2. Conformity to type based on internal production control plus supervised product checks at random intervals   Module D. Production quality management system Module D. Conformity to type based on quality assurance of the production process Module CD. Conformity to type based on quality management system of the production process   Module D1. Quality assurance of the production process     Module E. Conformity to type based on product quality assurance     Module E1. Quality assurance of final product inspection and testing   Module F. Product verification Module F. Conformity to type based on product verification Module CF. Conformity to type based on product verification   Module F1. Conformity based on product verification     Module G. Conformity based on unit verification   Module H1. Full quality management system Module H. Conformity based on full quality assurance Module CH. Conformity based on full quality management system Module H2. Full quality management system with design examination Module H1. Conformity based on full quality assurance plus design examination Module CH1. Conformity based on full quality management system plus design examination Module V. Type validation by in-service experience (suitability for use)   Module CV. Type validation by in-service experience (suitability for use) Module SB. Type examination   Module SB. EC-type examination Module SD. Product(ion) quality management system   Module SD. EC verification based on quality management system of the production process Module SF. Product verification   Module SF. EC verification based on product verification Module SG. Unit verification   Module SG. EC verification based on unit verification Module SH2. Full quality management system with design examination   Module SH1. EC verification based on full quality management system plus design examination

Read the full instrument →

Other provisions in 2010/713/EU: Commission Decision of 9 November 2010 on…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationANNEX III of 2010/713/EU: Commission Decision of 9 November 2010 on… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next