My bookmarksSign up free

Regulation (EU) No 913/2010 Article 2

Definitions

Article 2

1.   For the purposes of this Regulation, the definitions laid down in Article 2 of Directive 2001/14/EC shall apply. 2.   In addition to the definitions referred to in paragraph 1: (a) ‘freight corridor’ means all designated railway lines, including railway ferry lines, on the territory of or between Member States, and, where appropriate, European third countries, linking two or more terminals, along a principal route and, where appropriate, diversionary routes and sections connecting them, including the railway infrastructure and its equipment and relevant rail services in accordance with Article 5 of Directive 2001/14/EC; (b) ‘implementation plan’ means the document presenting the means and the strategy that the parties concerned intend to implement in order to develop over a specified period the measures which are necessary and sufficient to establish the freight corridor; (c) ‘terminal’ means the installation provided along the freight corridor which has been specially arranged to allow either the loading and/or the unloading of goods onto/from freight trains, and the integration of rail freight services with road, maritime, river and air services, and either the forming or modification of the composition of freight trains; and, where necessary, performing border procedures at borders with European third countries.

Read the full instrument → · Read this in context: CHAPTER I — GENERAL →

Other provisions in CHAPTER I — GENERAL

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 2 of Regulation (EU) No 913/2010 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next