My bookmarksSign up free

2013/498/EU: Commission Implementing Decision of 10 October… Article 6

2013/498/EU: Commission Implementing Decision of 10 October… Article 6

Article 6

1.   The financial contribution from the Union as referred to in Articles 1 to 4 shall be paid on the basis of: (a) a final technical report in accordance with Annex I on the technical execution of the surveillance measures referred to in Article 1, including the results attained during the period from 2 July 2013 to 31 December 2013; (b) a final financial report, in computerised format, in accordance with Annex II, on the costs incurred during the period from 2 July 2013 to 31 December 2013; (c) the results of any on-the-spot checks carried out in accordance with Article 11(1) of Decision 2009/470/EC. The documents supporting the reports referred to in points (a) and (b) shall be made available for on-the-spot checks referred to in point (c) carried out by the Commission. 2.   The final technical report and the final financial report referred to in paragraph 1(a) and (b) shall be submitted by 30 April 2014 at the latest. If that time limit is not observed, except if duly justified circumstances exist for this delay, the specific financial contribution from the Union shall be reduced by 25 % for every calendar month of delay.

Read the full instrument →

Other provisions in 2013/498/EU: Commission Implementing Decision of 10 October…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 6 of 2013/498/EU: Commission Implementing Decision of 10 October… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next