My bookmarksSign up free

Commission Regulation (EU) No 312/2014 Article 15

Commission Regulation (EU) No 312/2014 Article 15

Re-nomination procedure at interconnection points

Article 15

1.   A network user shall be entitled to submit re-nominations within the re-nomination period which starts immediately after the confirmation deadline and ends no earlier than three hours before the end of gas day D. The transmission system operator shall start a re-nomination cycle at the start of every hour within the re-nomination period. 2.   The last re-nomination received by the transmission system operator from a network user before the re-nomination cycle starts shall be taken into account by the transmission system operator in the re-nomination cycle. 3.   The transmission system operator shall send the message regarding the confirmed quantities to the respective network users within two hours from the start of each re-nomination cycle. The start time of the effective gas flow change shall be two hours from the start of the re-nomination cycle, unless: (a) a later time is requested by the network user; or (b) an earlier time is allowed by the transmission system operator. 4.   It shall be assumed that any change to the gas flow occurs at the start of each hour.

Read the full instrument → · Read this in context: CHAPTER IV — NOMINATIONS →

Other provisions in CHAPTER IV — NOMINATIONS

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 15 of Commission Regulation (EU) No 312/2014 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next