Article 2
The annual priority list for 2016 for the development of harmonised electricity rules shall be the following: — network connection rules: — rules on requirements for grid connection applicable to generators (Commission continuing adoption phase after Committee voting in 2015), — demand connection (Commission continuing adoption phase after Committee voting in 2015), — rules on high-voltage direct current transmission system connection (Commission continuing adoption phase after Committee voting in 2015), — rules regarding system operations (Commission continuing adoption phase after Committee voting in 2015), — rules for longer term (forward) capacity allocation (Commission continuing adoption phase after Committee voting in 2015), — balancing rules including network-related reserve power (finalise network code and start Commission adoption phase), — rules on emergency & restoration (finalise network code and start Commission adoption phase), — rules regarding harmonised transmission tariff structures (ACER to prepare framework guideline depending on the results of ACER's scoping activity and decisions taken as part of the energy market design initiative).