Commission Implementing Regulation (EU) 2015/909 Article 3

Commission Implementing Regulation (EU) 2015/909 Article 3

Direct costs on a network-wide basis

Article 3

1.   Direct costs on a network-wide basis shall be calculated as the difference between, on the one hand, the costs for providing the services of the minimum access package and for the access to the infrastructure connecting service facilities and, on the other hand, the non-eligible costs referred to in Article 4. 2.   The Member State may decide that the infrastructure manager applies the costs of efficient service provision for the purposes of calculation of direct costs on a network-wide basis referred to in paragraph 1. 3.   Asset values used for the purpose of calculating direct costs on a network-wide basis shall be based on historic values or, where such values are not available or where current values are lower, on current values. Historic values of the assets shall be based on the amounts paid and documented by the infrastructure manager at the time of acquisition of these assets. In case of a debt relief, whereby all of part of the infrastructure manager's debts have been assumed by another entity, the infrastructure manager shall attribute a relevant part of the debt relief to reduce its asset values and the corresponding direct costs on a network-wide basis. By derogation from the first sentence, the infrastructure manager may apply values including estimated values or current values or replacement values if they can be transparently, robustly and objectively measured and duly justified to the regulatory body. 4.   Without prejudice to Article 4 and if the infrastructure manager can transparently, robustly, and objectively measure and demonstrate on the basis of, inter alia, best international practice that costs are directly incurred by the operation of the train service, the infrastructure manager may include in the calculation of its direct costs on a network-wide basis in particular the following costs: (a) costs of staff needed for keeping open a particular stretch of line if an applicant requests to run a specific train service scheduled outside the regular opening hours of this line; (b) the part of the costs of points infrastructure, including switches and crossings, that is exposed to wear and tear by the train service; (c) the part of the costs of renewing and maintaining the overhead wire or the electrified third rail or both and the supporting overhead line equipment directly incurred as a result of operating the train service; (d) the costs of staff needed for preparing the allocation of train paths and the timetable to the extent that they are directly incurred as a result of operating the train service. 5.   Costs used for calculation under this Article shall be based on payments effected or forecast by the infrastructure manager. Costs calculated under this Article shall be measured or forecast consistently on the basis of data from the same time period.

Read the full instrument →

Other provisions in Commission Implementing Regulation (EU) 2015/909

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 3 of Commission Implementing Regulation (EU) 2015/909 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next