My bookmarksSign up free

Commission Regulation (EU) 2015/1095 Article 3

Commission Regulation (EU) 2015/1095 Article 3

Ecodesign requirements and timetable

Article 3

1.   The ecodesign requirements for professional refrigerated storage cabinets and blast cabinets are set out in Annex II. 2.   The ecodesign requirements for condensing units are set out in Annex V. 3.   The ecodesign requirements for process chillers are set out in Annex VII. 4.   Ecodesign requirements shall apply in accordance with the following timetable: (a) From 1 July 2016: (1) condensing units shall comply with the requirements set out in points 1(a) and 2 of Annex V; (2) process chillers shall comply with the requirements set out in points 1(a) and 2 of Annex VII. (3) professional refrigerated storage cabinets shall comply with the requirements set out in points 1(a)(i) and 2(a) of Annex II; (4) heavy-duty cabinets shall comply with the requirements set out in point 1(b) and 2(a) of Annex II. (5) Blast cabinets shall comply with requirements set out in point 2(b) of Annex II. (b) From 1 January 2018: (1) professional refrigerated storage cabinets shall comply with requirements set out in point 1(a)(ii) of Annex II. (c) From 1 July 2018: (1) condensing units shall comply with the requirements set out in point 1(b) of Annex V; (2) process chillers shall comply with the requirements set out in point 1(b) of Annex VII. (d) From 1 July 2019: (1) professional refrigerated storage cabinets shall comply with requirements set out in point 1(a)(iii) of Annex II. 5.   Compliance with ecodesign requirements for professional refrigerated storage cabinets shall be measured and calculated in accordance with the methods set out in Annexes III and IV. 6.   Compliance with ecodesign requirements for condensing units shall be measured and calculated in accordance with the methods set out in Annex VI. 7.   Compliance with ecodesign requirements for process chillers shall be measured and calculated in accordance with the methods set out in Annex VIII.

Read the full instrument →

Other provisions in Commission Regulation (EU) 2015/1095

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 3 of Commission Regulation (EU) 2015/1095 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next