TSOs' tasks related to single day-ahead and intraday coupling
Article 8
1. In Member States electrically connected to another Member State all TSOs shall participate in the single day-ahead and intraday coupling. 2. TSOs shall: (a) jointly establish TSO requirements for the price coupling and continuous trading matching algorithms for all aspects related to capacity allocation in accordance with Article 37(1)(a); (b) jointly validate the matching algorithms against the requirements referred to in point (a) of this paragraph in accordance with Article 37(4); (c) establish and perform capacity calculation in accordance with Articles 14 to 30; (d) where necessary, establish cross zonal capacity allocation and other arrangements in accordance with Articles 45 and 57; (e) calculate and send cross zonal capacities and allocation constraints in accordance with Articles 46 and 58; (f) verify single day-ahead coupling results in terms of validated cross-zonal capacities and allocation constraints in accordance with Articles 48(2) and 52; (g) where required, establish scheduled exchange calculators for calculating and publishing scheduled exchanges on borders between bidding zones in accordance with Articles 49 and 56; (h) respect the results from single day-ahead and intraday coupling calculated in accordance with Article 39 and Article 52; (i) establish and operate fallback procedures as appropriate for capacity allocation in accordance with Article 44; (j) propose the intraday cross-zonal gate opening and intraday cross-zonal gate closure times in accordance with Article 59; (k) share congestion income in accordance with the methodology jointly developed in accordance with Article 73; (l) where so agreed, act as shipping agents transferring net positions in accordance with Article 68(6).