My bookmarksSign up free

Commission Regulation (EU) 2016/1447 Article 23

Commission Regulation (EU) 2016/1447 Article 23

Priority to active or reactive power contribution

Article 23

Taking into account the capabilities of the HVDC system specified in accordance with this Regulation, the relevant TSO shall determine whether active power contribution or reactive power contribution shall have priority during low or high voltage operation and during faults for which fault-ride-through capability is required. If priority is given to active power contribution, its provision shall be established within a time from the fault inception as specified by relevant TSO.

Read the full instrument → · Read this in context: CHAPTER 2 — Requirements for reactive power control and voltage support →

Other provisions in CHAPTER 2 — Requirements for reactive power control and voltage support

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 23 of Commission Regulation (EU) 2016/1447 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next