My bookmarksSign up free

Commission Regulation (EU) 2017/1485 Article 71

Commission Regulation (EU) 2017/1485 Article 71

Quality control for grid models

Article 71

When defining the quality controls in accordance with Articles 67(1)(b) and 70(1)(c), all TSOs shall jointly determine controls aimed at least to check: (a) the coherence of the connection status of interconnectors; (b) that voltage values are within the usual operational values for those transmission system elements having influence on other control areas; (c) the coherence of transitory admissible overloads of interconnectors; and (d) that active power and reactive power injections or withdrawals are compatible with usual operational values.

Read the full instrument → · Read this in context: TITLE 1 — DATA FOR OPERATIONAL SECURITY ANALYSIS IN OPERATIONAL PLANNING →

Other provisions in TITLE 1 — DATA FOR OPERATIONAL SECURITY ANALYSIS IN OPERATIONAL PLANNING

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 71 of Commission Regulation (EU) 2017/1485 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next