My bookmarksSign up free

Commission Regulation (EU) 2017/2196 Article 16

Commission Regulation (EU) 2017/2196 Article 16

Automatic over-frequency control scheme

Article 16

1.   The scheme for automatic over-frequency control of the system defence plan shall lead to an automatic decrease of the total active power injected in each LFC area. 2.   In consultation with the other TSOs of its synchronous area, each TSO shall set out the following parameters of its scheme for automatic over-frequency control: (a) the frequency thresholds for its activation; and (b) the reduction ratio of injection of active power. 3.   Each TSO shall design its automatic over-frequency control scheme taking into account the capabilities of the power generating modules concerning the limited frequency sensitive mode — overfrequency and of the energy storage units, in its LFC area. If the limited frequency sensitive mode — overfrequency does not exist or is not sufficient to fulfil the requirements set out in points (a) and (b) of paragraph 2, each TSO shall set up in addition a step-wise linear disconnection of generation in its LFC area. The TSO shall establish the maximum size of the steps for disconnection of power generating modules and/or of HVDC systems in consultation with the other TSOs of its synchronous area.

Read the full instrument → · Read this in context: SECTION 2 — Measures of the System Defence Plan →

Other provisions in SECTION 2 — Measures of the System Defence Plan

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 16 of Commission Regulation (EU) 2017/2196 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next