Regulation (EU) 2019/941 Article 8

Regulation (EU) 2019/941 Article 8

Methodology for short-term and seasonal adequacy assessments

Article 8

1.   By 5 January 2020, the ENTSO for Electricity shall submit to ACER a proposal for a methodology for assessing seasonal and short-term adequacy, namely monthly, week-ahead to at least day-ahead adequacy, which shall cover at least the following: (a) the uncertainty of inputs such as the probability of a transmission capacity outage, the probability of an unplanned outage of power plants, severe weather conditions, variable demand, in particular peaks depending on weather conditions, and variability of production of energy from renewable sources; (b) the probability of the occurrence of an electricity crisis; (c) the probability of the occurrence of a simultaneous electricity crisis. 2.   The methodology referred to in paragraph 1 shall provide for a probabilistic approach, including multiple scenarios, and shall take into account the national, regional and Union context, including the level of interconnection between Member States and, to the extent possible, third countries within synchronous areas of the Union. The methodology shall take into account the specificities of each Member State's energy sector, including specific weather conditions and external circumstances. 3.   Before submitting the proposed methodology, the ENTSO for Electricity shall conduct a consultation involving at least the regional coordination centres, industry and consumer organisations, producers or their trade bodies, transmission system operators, relevant distribution system operators, competent authorities, regulatory authorities and other relevant national authorities. The ENTSO for Electricity shall duly take into account the results of the consultation and present them, together with the proposed methodology, at a meeting of the ECG. 4.   Within two months of receipt of the proposed methodology, ACER shall, after consulting the ECG in its formation composed only of representatives of the Member States, approve or amend the proposal. The ENTSO for Electricity and ACER shall publish the final version of the methodology on their websites. 5.   The ENTSO for Electricity shall update and improve the methodology in accordance with paragraphs 1 to 4 where significant new information becomes available. The ECG in its formation composed only of representatives of the Member States may recommend, and ACER or the Commission may request, such updates and improvements with due justification. Within six months of receipt of the request, the ENTSO for Electricity shall submit to ACER a draft of the proposed changes. Within two months of receipt of such a draft, ACER shall, after consulting the ECG, in its formation composed only of representatives of the Member States, approve or amend the proposed changes. The ENTSO for Electricity and ACER shall publish the final version of the updated methodology on their websites.

Read the full instrument → · Read this in context: CHAPTER II — Risk assessment →

Other provisions in CHAPTER II — Risk assessment

CitationArticle 8 of Regulation (EU) 2019/941 (LawPlayer, data as of 2026-07-04)

DATA NOTES

About the data

Sources

This page

Law
Article 8 of Regulation (EU) 2019/941 is headed “Methodology for short-term and seasonal adequacy assessments” and is a provision of EU legislation.
Text
The text of Article 8 of Regulation (EU) 2019/941 begins “1. By 5 January 2020, the ENTSO for Electricity shall submit to ACER a proposal for a methodology for assessing seasonal and short-term…”.
Location
Article 8 of Regulation (EU) 2019/941 is placed under “CHAPTER II: Risk assessment”.
Previous
On LawPlayer, the provision listed immediately before Article 8 of Regulation (EU) 2019/941 is Article 7.
Next
On LawPlayer, the provision listed immediately after Article 8 of Regulation (EU) 2019/941 is Article 9.
Synced
LawPlayer last synced the text of Regulation (EU) 2019/941 from EUR-Lex (Publications Office of the European Union) on 4 July 2026.
Article 8 of Regulation (EU) 2019/941 is reproduced on LawPlayer from EUR-Lex (Publications Office of the European Union).

Sources

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged. · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Data as of 2026-07-04Read the official text ↗

About

On LawPlayer, every article of an EU act has its own page, linked to the full text and, where the act has them, to its Titles, Chapters and Sections; the same site also covers Taiwan's statutes, court judgments and company registration records, and the legislation of 13 other jurisdictions.EU law entry

What to look at next