Review
Article 4
By 31 December 2025 at the latest, the Commission shall, following a request from Belgium and Luxembourg, or at its own initiative, carry out a review of the actions and of the timetable referred to in Article 2, with the assistance of the European Coordinator for the North Sea–Mediterranean Core Network Corridor.