Section 8
SEC. 8. The grantee shall be under a continuing obligation to keep in good repair the roadbed of said tramway and Hie surface of the road, highway or street between the rails and between the tracks of the tramway and for eighteen inches on each side of said tracks for the entire length of the tramway, and within Hie town proper or poblacion or municipality of Daet and within the barrio proper or poblacion of any barrio of said municipality through which said tramway passes, the space between the rails and tracks of the tramway arid for eighteen inches on each side of said tracks to be filled flush to the top of the rails by the grantee with the same material as that used hi the construction of the road, highway, or street and as may be prescribed by ordinance of the municipality of Daet: Provided, however, That in case of dispute between the municipality and the grantee, the work shall be done with the material and in the manner prescribed by the Consulting Engineer to the Commission: And provided further, That if the municipality shall order a change in the kind of material after the same has once been laid by the grantee, the material necessary to make the change shall be furnished by the municipality and the work of laying such material and putting the same in place shall be borne by the grantee at his own proper cost and expense.