Section 5
SEC. 5. The electric installations used by the grantee shall be in accordance with the general regulations contained in the last edition of the National Electric Code as adopted in the United States, and the work of construction, operation, and maintenance of said power plant shall he subject to inspection and examination by the Consulting Engineer to the Commission or his authorized agent, who shall at all times have the right of access to the plant for such purpose.