Section 3
SEC 3. The poles erected by the grantee shall be of such a height as to maintain the wires stretched on the same at a distance of at least twenty feet above the level of the ground, and shall be of such appearance as not to disfigure the streets, and shall be placed with due regard for the public safety so as not to be a danger to the same, in accordance with a plan approved by the municipal authorities, represented by the municipal president, and said grantee shall supply electric power, heat, and light to any applicant for the same, within fifteen days after the date of his application, and as between such applicant and other like applicants, in the order of the date of his application, up to the limit of the capacity of the plant of said grantee, to be determined by the district engineer on the application of said grantee, and should the demand for electric power, heat, and light at any time increase beyond the capacity of the plant of said grantee to supply the same, the capacity of said plant shall be increased to meet such demand, upon authorization by the municipal council of Romblon: Provided, That the point at which the electric power, heat, or light is to be supplied, shall not be more than thirty meters from the lines or wires operated by said grantee.