My bookmarksSign up free

BP 13 Preamble

Preamble

Title A—TRANSPORT PROJECTS For the construction, improvement, rehabilitation, reconstruction, and/or completion of the following projects, including detailed engineering and acquisition of sites, equipment, materials, supplies, and services to be used directly for the projects: (a) HIGHWAYS National Capital Region 1. Manila South Diversion Road Interchange ( Pasay City) ..........P20,000,000 2. Circumferential Road C-3 and Radial Road R-10 (Regionwide) ..........100,000,000 3. Various local roads in support to Regional Development Plans (Regionwide) ...........50,000,000 4. Various national roads and bridges (Regionwide) ...........80,000,000 5. Road restoration and rehabilitation program (Regionwide) ...........50,000,000 Region I 6. Rosario-Laoag Road (La Union, Ilocos Sur and Ilocos Norte) ..........100,000,000 7. Laoag-Allacapan Road (Ilocos Norte) ...........50,000,000 8. Ilocos Norte Rural Development Project (Ilocos Norte) ...........50,000,000 9. Luzon Road Package, Olongapo-Bugallon (Pangasinan) ...........50,000,000 10. Various project roads in support to Regional Development Plans (Regionwide) ...........10,000,000 11. Major bridges (Regionwide) ...........10,000,000 12. Various national roads and bridges (Regionwide) ...........15,000,000 13. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region II 14. Ilagan-Palanan Road (Isabela) ............50,000,000 15. Chico Irrigation Project, road component (Isabela) ...........30,000,000 16. Laoag-Allacapan Road (Cagayan) ...........50,000,000 17. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 18. Major bridges (Regionwide) ...........10,000,000 19. Various national roads (Regionwide) ...........15,000,000 20. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region III 21. Capaz-Botolan Road (Tarlac and Zambales) ...........50,000,000 22. Luzon Road Package, Olongapo-Bugallon (Zambales) ...........80,000,000 23. Various local roads In support to Regional Development Plans (Regionwide) ...........10,000,000 24. Major bridges (Regionwide) ...........10,000,000 25. Various national roads (Regionwide) ...........15,000,000 26. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region IV 27. Mindoro Integrated Rural Development Project, road component (Mindoro Oriental and Mindoro Occidental) .......60,000,000 28. Luzon Road Package, Tagaytay-Batangas Road ( Tagaytay City and Batangas) .......80,000,000 29. Various local roads in support to Regional Development Plans (Regionwide) .......25,000,000 30. Major bridges (Regionwide) .......20,000,000 31. Various national roads (Regionwide) .......20,000,000 32. Road restoration and rehabilitation program (Regionwide) .......30,000,000 Region V 33. Third and Fourth IBRD Package (Albay) ...........30,000,000 34. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 35. Major bridges (Regionwide) ...........10,000,000 36. Various national roads (Regionwide) ...........15,000,000 37. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 38. Secondary and feeder roads, Bicol River Basin (Camarines Sur) ...........80,000,000 Region VI 39. Third and Fourth IBRD Package ( Iloilo, Capiz, Aklan and Negros Occidental) ..........250,000,000 40. Various local roads in support to Regional Development Plans (Regionwide) ...........20,000,000 41. Major bridges (Regionwide) ...........20,000,000 42. Various national roads (Regionwide) ...........25,000,000 43. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region VII 44. Third and Fourth IBRD Package ( Cebu) ........P120,000,000 45. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 46. Major bridges (Regionwide) ...........10,000,000 47. Various national roads (Regionwide) ...........15,000,000 48. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region VIII 49. Samar Integrated Rural Development Project, road component .........200,000,000 50. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 51. Major bridges (Regionwide) ...........10,000,000 52. Various national roads (Regionwide) ...........15,000,000 53. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 54. Palo-Carigara-Ormoc-Maasin Sogod Road ( Leyte and Leyte del Sur) .........100,000,000 Region IX 55. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 56. Major bridges (Regionwide) ...........10,000,000 57. Various national roads (Regionwide) ...........20,000,000 58. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region X 59. Mindanao secondary and feeder roads (Misamis Oriental and Agusan del Norte) .........100,000,000 60. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 61. Major bridges (Regionwide) ...........10,000,000 62. Various national roads (Regionwide) ...........15,000,000 63. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region XI 64. Mindanao secondary and feeder roads ( South Cotabato) .........150,000,000 65. Various local roads in support to Regional Development Plans (Regionwide) ...........10,000,000 66. Major bridges (Regionwide) ...........10,000,000 67. Various national roads (Regionwide) ...........15,000,000 68. Road restoration and rehabilitation program (Regionwide) ...........20,000,000 Region XII 69. Mindanao secondary and feeder roads (Sultan Kudarat) .........P45,000,000 70. Various local roads in support to Regional Development Plans (Regionwide) ...........15,000,000 71. Major bridges (Regionwide) ...........15,000,000 72. Various national roads (Regionwide) ...........20,000,000 73. Road restoration and rehabilitation program (Regionwide) ...........25,000,000 Nationwide 74. Major bridges ...........40,000,000 75. Road restoration and rehabilitation program ...........80,000,000 TOTAL FOR HIGHWAYS.................... P 2,900,000,000 (b) RAILWAYS National Capital Region Light Rail Transit System ...........P200,000,000 TOTAL FOR RAILWAYS.................... P200,000,000 (c) PORTS Region I 1. Sual Fishing Port Project (Pangasinan) ...........37,000,000 Region IV 2. Lucena Fishing Port Project (Lucena City) ...........99,000,000 Region V 3. Camaligan Fishing Port Project (Camarines Sur) ...........60,000,000 Region VI 4. Philippine Rural Infrastructure Project, port components (San Jose de Buenavista, Antique; Culasi, Capiz; and Dumaguit, Aklan) ...........32,000,000 5. Iloilo Fishing Port Project ( Iloilo City) .........161,000,000 Region VIII 6. Samar Integrated Rural Development Project, port components ( San Jose, Northern Samar; Catbalogan, Samar; and Guiuan and Dolores, Eastern Samar) ..........12,000,000 Region IX 7. Zamboanga Fishing Port Project ( Zamboanga City) ..........72,000,000 Region X 8. Port of Cagayan de Oro (Cagayan de Oro City) ..........63,000,000 Region XI 9. Port of Davao ( Davao City and Davao del Sur) ..........53,000,000 TOTAL FOR PORTS.................... P589,000,000 (d) AIRPORTS AND AIR NAVIGATIONAL FACILITIES Region I 1. Laoag International Airport ( Laoag City) ..........46,000,000 Region IV 2. Puerto Princesa Airport (Puerto Princesa City) ..........13,000,000 Region VI 3. Kalibo Airport (Aklan) ..........10,000,000 Region VII 4. Dumaguete Airport (Dumaguete City) ..........11,000,000 Region IX 5. Pagadian Airport ( Pagadian City) ..........11,000,000 6. Cagayan de Sulu Airport (Tawi-Tawi) ..........11,000,000 Region XI 7. General Santos Airport (General Santos City) ..........22,000,000 8. Bislig Airport (Surigao del Sur) ..........10,000,000 TOTAL FOR AIRPORTS AND AIR NAVIGATIONAL FACILITIES.................... P134,000,000 TOTAL FOR TRANSPORT.................... P3,823,000,000 Title B—WATER RESOURCES PROJECTS For the construction, improvement, rehabilitation, re­construction, and/or completion of the following projects, including detailed engineering and acquisition of sites, equipment, materials, supplies, and services to be used directly for the projects: (a) IRRIGATION Region I 1. Ilocos Norte Integrated Develop­ment Project, including Palsiguan River and Quiaoit (Quiom-Maypalig) Multi-Purpose Projects, irrigation component (Ilocos Norte) ........P705,000,000 2. Philippine Rural Infrastructure Project, irrigation component (Abra) ..........12,000,000 3. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region II 4. Chico River Basin Project, irrigation component (Isabela and Kalinga-Apayao) ........540,000,000 5. Upper Pampanga River Project Watershed Development (Nueva Vizcaya) ..........15,000,000 6. Cagayan Integrated Area Development Project, irrigation component (Cagayan) ..........65,000,000 7. Philippine Rural Infrastructure Project, irrigation component (Kalinga-Apayao) ..........19,000,000 8. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region III 9. Upper Pampanga River Project Watershed Development (Nueva Ecija) ..........15,000,000 10. Tarlac Irrigation System Improvement Project (Tarlac) ..........26,000,000 Region IV 11. Laguna de Bay Development Project, irrigation component (Mabitac, Pagsanjan, Cabuyao, and San Pedro, Laguna; and Baras, Tanay, and Pililla, Rizal; and Cavite) ..........70,000,000 12. Amnay ( Asis River) Irrigation Project ( Mindoro Occidental) ..........18,000,000 13. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 14. Mindoro Integrated Area Development Project, irrigation component (Mindoro Oriental and Mindoro Occidental) ..........22,000,000 15. Upper Pampanga River Project Watershed Development (Quezon) ..........15,000,000 Region V 16. Baliuag-San Vicente Area Development Project, irrigation component (Camarines Sur) ..........90,000,000 17. Rinconada Area Development Project, irrigation component (Camarines Sur) ..........42,000,000 18. Bula-Minalabac Irrigation Project (Camarines Sur) ..........22,000,000 19. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region VI 20. Philippine Rural Infrastructure Project, irrigation component (Aklan, Antique, and Capiz) ..........27,000,000 21. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region VII 22. Philippine Rural Infrastructure Project, irrigation component (Bohol) ..........19,000,000 Region VIII 23. Samar Integrated Rural Development Project, irrigation component ( Northern Samar) ........142,000,000 24. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region IX 25. Philippine-Australian Development Project, irrigation component (Zamboanga del Sur) ..........14,000,000 26. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region X 27. Agusan del Sur Irrigation Project (Bunawan-Salvacion, Agusan del Sur) ..........50,000,000 28. Pulangui River Irrigation Project ( Valencia, Bukidnon) ..........39,000,000 29. Agusan II Irrigation Project (Cabadbaran, Agusan del Norte; and Solibao-Gibong, Agusan del Sur) ..........60,000,000 30. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 Region XI 31. Tago River Irrigation Project (Surigao del Sur) ........138,000,000 32. Davao del Norte Irrigation Project II (Libuganon-Lasang, Davao del Norte) ..........78,000,000 33. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 34. Allah Valley Irrigation Project ( South Cotabato) ........220,000,000 Region XII 35. National Irrigation Systems Improvement Project (Regionwide) ..........20,000,000 TOTAL FOR IRRIGATION.................... P2,663,000,000 (b) FLOOD CONTROL AND DRAINAGE National Capital Region 1. Mangahan Floodway (Rizal) .......P132,000,000 2. Napindan Hydraulic Control Structure, flood control component (Rizal) ..........66,000,000 3. Marikina Multi-Purpose Project, flood control component (Rizal) ..........88,000,000 Region I 4. Tina-Gasgas Flood Control and Twin Impounding Reservoirs (Ilocos Norte) .......200,000,000 5. Catchment basins and impounding reservoirs, flood control component (Regionwide) .........50,000,000 6. Construction and reconstruction of railroad and highway bridges with inadequate waterways (Regionwide) .........75,000,000 7. Dredging of main rivers and outlets (Regionwide) .........15,000,000 8. River training and bank protection of various rivers (Regionwide) ...........5.000,000 9. Local flood control, drainage and related activities (Regionwide) ...........5,000,000 Region II 10. Magat Multi-Purpose Project, flood control component (Isabela) ........200,000,000 11. Cagayan River Control (Cagayan and Isabela) ..........82,000,000 12. Matuno Flood Control and Impounding Reservoir (Nueva Vizcaya) ........100,000,000 13. Sta. Cruz Flood Control and Impounding Reservoir (Nueva Vizcaya) ........100,000,000 14. Catchment basins and impounding reservoirs, flood control component (Regionwide) ..........40,000,000 15. Dredging of main rivers and outlets (Regionwide) ...........3,000,000 16. River training and bank protection of various rivers (Regionwide) ..........35,000,000 17. Local flood control, drainage and related activities (Regionwide) ..........12,000,000 Region III 18. Labangan Floodway (Bulacan) ..........10,000,000 19. Catchment basins and impounding reservoirs, including sabo works, flood control component (Regionwide) ........150,000,000 20. Construction and reconstruction of railroad and highway bridges with inadequate waterways (Regionwide) ........150,000,000 21. Dredging of main rivers and outlets (Regionwide) ..........50,000,000 22. River training and bank protection of various rivers (Regionwide) ..........30,000,000 23. Local flood control, drainage and related activities (Regionwide) ..........20,000,000 Region IV 24. Mindoro Flood Control and Schistosomiasis Control Project (Mindoro Oriental) ..........12,000,000 25. Cavite Flood Control and Drainage ( Cavite) ..........15,000,000 26. Catchment basins and impounding reservoirs, flood control component (Regionwide) ...........3,000,000 27. Dredging of main rivers and outlets (Regionwide) ...........4,000,000 28. River training and bank protection of various rivers (Regionwide) ...........3,000,000 29. Local flood control, drainage and related activities (Regionwide) ...........2,000,000 Region V 30. Mayon Volcano Sabo Works and Related Projects (Albay and Legaspi City) ..........18,000,000 31. Sorsogon Schistosomiasis Control Project (Sorsogon) ..........10,000,000 32. Lake Bato-Pantao Bay Diversion Channel (Camarines Sur) ........230,000,000 33. Catchment basins and impounding reservoirs, including sabo works, flood control component (Regionwide) ..........50,000,000 34. Construction and reconstruction of railroad and highway bridges, with inadequate waterways (Regionwide) ..........50,000,000 35. Dredging of main rivers and outlets (Regionwide) ..........20,000,000 36. River training and bank protection of various rivers (Regionwide) ..........10,000,000 37. Local flood control, drainage and related activities (Regionwide) ..........10,000,000 Region VI 38. Panay River Control (Capiz and Roxas City) ..........18,000,000 39. Catchment basins and impounding reservoirs, flood control component (Regionwide) ..........20,000,000 40. Dredging of main rivers and outlets (Regionwide) ...........8,000,000 41. River training and bank protection of various rivers (Regionwide) ...........6,000,000 42. Local flood control, drainage and related activities (Regionwide) ...........4,000,000 Region VII 43. Catchment basins and impounding reservoirs, including sabo works, flood control component (Regionwide) ..........30,000,000 44. Dredging of main rivers and outlets (Regionwide) ...........8,000,000 45. River training and bank protection of various rivers (Regionwide) ...........4,000,000 46. Local flood control, drainage and related activities (Regionwide) ...........8,000,000 Region VIII 47. Sab-a Basin Schistosomiasis Control and Drainage Project (Leyte) ..........17,000,000 48. Catchment basins and impounding reservoirs, flood control component (Regionwide) ..........30,000,000 49. Dredging of main rivers and outlets (Regionwide) ...........8,000,000 50. River training and bank protection of various rivers (Regionwide) ...........3,000,000 51. Local flood control, drainage and related activities (Regionwide) ...........9,000,000 Region IX 52. Saaz River Control and Drainage (Zamboanga City) ..........10,000,000 53. Catchment basins and impounding reservoirs, flood control component (Regionwide) ..........15,000,000 54. Dredging of main rivers and outlets (Regionwide) ...........5,000,000 55. River training and bank protection of various rivers (Regionwide) ...........6,000,000 56. Local flood control, drainage and related activities (Regionwide) ...........4,000,000 Region X 57. Catchment basins and impounding reservoirs, flood control component (Regionwide) .........120,000,000 58. Dredging of main rivers and outlets (Regionwide) ..........30,000,000 59. River training and bank protection of various rivers (Regionwide) ..........30,000,000 60. Local flood control, drainage and related activities (Regionwide) ..........20,000,000 Region XI 61. Davao River Control, drainage and related projects ( Davao City) ..........52,000,000 62. Tuganay River Control (Carmen, Davao del Norte) ..........15,000,000 63. Catchment basins and impounding reservoirs, flood control component (Regionwide) ..........40,000,000 64. Dredging of main rivers and outlets (Regionwide) ..........10,000,000 65. River training and bank protection of various rivers (Regionwide) ..........10,000,000 66. Local flood control, drainage and related activities (Regionwide) ..........10,000,000 Region XII 67. Catchment basins and impounding reservoirs, flood control component (Regionwide) .........200,000,000 68. Dredging of main rivers and outlets (Regionwide) ..........65,000,000 69. River training and bank protection of various rivers (Regionwide) ..........30,000,000 70. Local flood control, drainage and related activities (Regionwide) ..........30,000,000 TOTAL FOR FLOOD CONTROL DRAINAGE.................... P2,930,000,000 c) WATER SUPPLY 1. Rural Water Supply Communal Systems (Nationwide) .........P40,000,000 TOTAL FOR WATER SUPPLY.................... P40,000,000 TOTAL FOR WATER RESOURCES.................... P5,633,000,000 GRAND TOTAL.................... P9,456,000,000

Read the full instrument →

Other provisions in BP 13

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of July 4, 2026

CitationBP 13 Preamble (LawPlayer, data as of July 4, 2026)

Source: Supreme Court E-Library, Republic of the Philippines. Philippine laws are public documents (works of the government).

Continue your research