Preamble
Title A.—HIGHWAYS For the construction, improvement, rehabilitation, reconstruction, and/or completion of the following highways projects, including detailed engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region .................... P 300,000,000 1. Metro Manila Major Roads 300,000,000 Region I .................... P 370,000,000 1. Rosario-Laoag Road 180,000,000 2. Ilocos Norte Rural Development Project, Road Component 40,000,000 3. Baguio-Bontoc-Banawe-Lubuagan 150,000,000 Region II .................... P 70,000,000 1. Dugo Jct.— San Vicente Road 70,000,000 Region IV .................... P 550,000,000 1. Palawan Integrated Rural Development Project, Road Component 200,000,000 2. Mindoro Integrated Rural Development Project, Road Component 350,000,000 Region V .................... P 120,000,000 1. Bicol River Basin, Road Component 120,000,000 Region VI .................... P 80,000,000 1. Antique-Aklan Road 80,000,000 Region VII .................... P 100,000,000 1. Bohol Integrated Development Project, Road Component 50,000,000 2. Various Road Projects, Cebu 30,000,000 3. Various Road Projects, Negros Oriental 10,000,000 4. Various Road Projects, Siquijor 10,000,000 Region VIII .................... P 500,000,000 1. West Leyte Road Improvement Project, including four (4) supplementary road sections in Northwest 300,000,000 2. Samar Integrated Rural Development Project 200,000,000 Region IX .................... P 200,000,000 1. Zamboanga del Sur Integrated Development Project, Road Component 170,000,000 2. For various Road Projects in the islands of Basilan, Sulu and Tawi-Tawi 30,000,000 Region X .................... P 90,000,000 Region XI .................... P 90,000,000 Inter-Regional .................... P2,930,000,000 1. Laoag-Allacapan Road 170,000,000 2. Junction Narvacan, Ilocos Sur-Abra- Kalinga Road 180,000,000 3. Southern Philippine Development Authority, Road Component (a) Malabang-Marawi Road 130,000,000 (b) Ganassi-Tubod Road 100,000,000 (c) Lake Lanao Circumferential Road 130,000,000 (d) Molundo-Wao-Banisilan-Libungan-Carmen Road 330,000,000 (e) Dipolog-Zamboanga Coastal Road 600,000,000 (f) Cotabato- Zamboanga Coastal Road 500,000,000 (g) Cotabato City-General Santos Road ( South Cotabato Coastal Road) 180,000,000 (h) Surigao del Norte-Surigao del Sur- Davao Oriental Coastal Road 410,000,000 4. Dalton Pass 200,000,000 Nationwide .................... P4,560,000,000 1. Philippine Rural Road Project 130,000,000 2. Luzon Road Project 300,000,000 3. Philippine Island Road Project 400,000,000 4. Major Bridges 600,000,000 5. Urban Road and Related Project 200,000,000 6. Bliss Project, Road Component 80,000,000 7. Pambansang Bagong Nayon Project 50,000,000 8. Traffic Safety Devices and Road Signs 70,000,000 9. Detailed Engineering of Various Roads/Bridges 100,000,000 10. Development of Roads and Bridges 200,000,000 11. Various National Roads and Bridges 500,000,000 12. Local and Rural Roads and Bridges 500,000,000 13. Construction of Area and Base Shops 600,000,000 14. Slum Improvement and Resettlement Project 100,000,000 15. Restoration and Improvement Project 530,000,000 16. Ferry Services __200,000,000 Total, Title A.......... P9,960,000,000 Title B.—RAILWAYS For the construction of the following projects, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region P 800,000,000 1. Light Rail Transit System 800,000,000 NCR and Other Regions 1. Repair, Maintenance and Improvement of Rolling Stocks, Tracks and other Facilities including Rehabilitation of the South and North Main Lines and the Commuter Service P2,120,000,000 Total, Title B.......... P2,920,000,000 For the construction, dredging, improvement, provision, rehabilitation, reconstruction and/or completion of port projects, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. C.—1. Fishing Ports Region I P 76,000,000 1. Sual Fishing Port, Pangasinan 76,000,000 Region IV P 36,000,000 1. Lucena Fishing Port 36,000,000 Region V P 44,000,000 1. Camaligan Fishing Port, Camarines Sur 44,000,000 Region VI P 139,000,000 1. Iloilo Fishing Port 139,000,000 Region IX P 177,000,000 1. Zamboanga Fishing Port __177,000,000 Total, Title C-1.......... P 472,000,000 C-2. Commercial Ports Region I .......................... P 11,000,000 Region II ........................ 10,000,000 Region III ..................... 13,000,000 Region IV ...................... 23,000,000 Region V ......................... 16,000,000 Region VI ....................... 25,000,000 Region VII....................... 17,000,000 Region VIII ..................... 29,000,000 Region IX ......................... 18,000,000 Region X .......................... 21,000,000 Region XI ......................... 20,000,000 Region XII ......................... 14,000,000 Nationwide ........................ 20,000,000 Total, Title C-2 ............. P 237,000,000 Grand Total, Title C........ P 709,000,000 For the construction, improvement, rehabilitation, reconstruction, and/or completion of the following airports and air navigational facility projects, including feasibility and detailed engineering studies, acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. Region I......................... P 10,600,000 Region II ....................... 33,500,000 Region III ...................... 3,400,000 Region IV ....................... 363,580,000 Region V ........................ 13,170,000 Region VI ....................... 31,500,000 Region VII ...................... 566,750,000 Region VIII ..................... 34,100,000 Region IX ....................... 553,900,000 Region X ........................ 17,000,000 Region XI ....................... 219,500,000 Region XII ...................... 23,000,000 National Capital Region (NCR)............. 695,000,000 Various Air Navigational Aids Projects..... 380,000,000 Total, Title D..................... P2,945,000,000 Title E.—IRRIGATION For the construction, improvement, provision, rehabilitation, reconstruction and/or completion of irrigation systems, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. Region I .................... P 65,000,000 1. National Irrigation System Improvement Project, Regionwide 49,000,000 2. Various Irrigation System and Projects, Regionwide 16,000,000 Region II .................... P 516,000,000 3. Cagayan Integrated Agricultural Development Project (Irrigation Component), Cagayan 22,000,000 4. San Pablo-Cabagan Irrigation Project, Isabela 17,000,000 5. Watershed Management and Soil Erosion Control Project, Regionwide 312,000,000 6. Nationwide Irrigation Systems Improvement Project, Regionwide 145,000,000 7. Various Irrigation Systems and Projects, Regionwide 20,000,000 Region III .................... P 155,000,000 8. Tarlac Irrigation Systems Improvement Project 19,000,000 9. Central Luzon Ground Water Irrigation Project 77,000,000 10. Upper Pampanga River Irrigation Systems, San Antonio Extension and Completion of Drainage Facilities 18,000,000 11. Bayto River Irrigation Project, Zambales 21,000,000 12. Various Irrigation Systems and Projects, Regionwide 20,000,000 Region IV .................... P 418,000,000 13. Amro-Pinamacan Irrigation Project, Aurora 54,000,000 14. Laguna de Bay Development Project (Irrigation Component), Laguna, Rizal and Cavite 205,000,000 15. Lumintao River Irrigation Project, Mindoro Occidental 57,000,000 16. Amnay River Irrigation Project, Mindoro Occidental 41,000,000 17. National Irrigation System Improvement Project, Regionwide 41,000,000 Various Irrigation Systems and Projects, Regionwide 20,000,000 Region V .................... P 475,000,000 19. Naga-Calabanga Irrigation Project, Camarines Sur 350,000,000 20. San Francisco River Irrigation Project, Albay 41,000,000 21. Virac-Calolbon Irrigation Project, Catanduanes 15,000,000 22. National Irrigation Systems Improvement Project, Regionwide 69,000,000 Region VI .................... P 165,000,000 23. Binalbagan River Irrigation Project, Negros Occidental 36,000,000 24. National Irrigation Systems Improvement Project, Regionwide 129,000,000 Region VII .................... P 276,000,000 25. Bohol Irrigation Project (Wahig-Pamacsalan Reservoir Project) 258,000,000 26. Bayawan River Irrigation Project, Negros Oriental 18,000,000 Region VIII .................... P 116,000,000 27. National Irrigation Systems Improvement Project, Regionwide 116,000,000 Region IX .................... P 165,000,000 28. Sibuguey River Irrigation Project Zamboanga del Sur 30,000,000 29. National Irrigation Systems Improvement Project, Regionwide 135,000,000 Region X .................... P 219,000,000 30. Agusan del Sur Irrigation Project (Bunawan-Salvacion) 10,000,000 31. Agusan II Irrigation Project, Agusan del Sur and Agusan del Norte 56,000,000 32. Bukidnon Irrigation Project 153,000,000 Region XI .................... P 529,000,000 33. Davao del Norte Irrigation Project II Libunganon and Lasang 95,000,000 34. Davao del Norte III, Hijo, Manat, Kipaliku, Tuganay, and Libuganon 337,000,000 35. Allah River Irrigation Project, South Cotabato 41,000,000 36. National Irrigation Systems Improvement Project, Regionwide 46,000,000 37. Various Irrigation Systems and Projects, Regionwide 10,000,000 Region XII .................... P 148,000,000 38. Rugnan River Irrigation Project, Lanao del Sur 11,000,000 39. National Irrigation Systems Improvement Project, Regionwide 137,000,000 Nationwide .................... P1,409,000,000 40. Mindanao Irrigation Study III 20,000,000 41. Philippine Rural Infrastructure Project II (Communal Irrigation Development Package Project) 384,000,000 42. Rehabilitation and Agricultural Institutional Development Project 85,000,000 43. Investigation and Survey of Proposed Irrigation Projects, including Feasibility Studies 70,000,000 44. Various Irrigation Systems and Projects 800,000,000 45. Mini-Hydros on National Irrigation Systems __50,000,000 Total Title E.......... P 4,656,000,000 TITLE F.—FLOOD CONTROL AND DRAINAGE For the construction, dredging, improvement, rehabilitation, reconstruction and/or completion of flood control and drainage projects, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region .................... P 121,000,000 1. Dagat-Dagatan Lagoon Reclamation and Flood Control Project 121,000,000 Region I .................... P 89,000,000 2. Abra River Control Project 21,000,000 3. Mabini River Control Project 25,000,000 4. Aringay River Control Project, Aringay, Tubao, and Pugo, La Union 19,000,000 5. Tagamusing River Control Project, Binalonan and Manaoag, Pangasinan 14,000,000 6. Bontoc ( Chico) River Control Project, Mountain Province 10,000,000 Region II .................... P 80,000,000 7. Cagayan Integrated Area Development Project (Flood Control Component) 30,000,000 8. Tuguegarao Drainage System, Cagayan 10,000,000 9. Pinacanawan River Control, Cagayan 10,000,00 10. Chico River Control Project, Kalinga-Apayao 10,000,000 11. Calanasan River Control Project, Kalinga-Apayao 10,000,000 12. Ifugao River Control Project, Ifugao 10,000,000 Region III .................... P 166,000,000 13. Pampanga River Control System, Pampanga, Bulacan, Nueva Ecija and Tarlac 29,000,000 14. Maculcol River Control Project, San Felipe and San Narciso, Zambales 50,000,000 15. Quintanguil River Control Project, Arayat and Magalang, Pampanga 12,000,000 16. Abacan River Control Project, Angeles and Mexico, Pampanga 28,000,000 17. Batacan River Control Project, San Clemente, Tarlac 15,000,000 18. Camiling River Control Project, Camiling and Mayantoc, Tarlac 15,000,000 19. Dredging and Improvement of Major Rivers in Bataan and Bulacan 17,000,000 Region IV .................... P 87,000,000 20. Magasawang Tubig River Control Project, Naujan. Oriental Mindoro 16,000,000 21. Cavite Flood Control and Drainage Project, Kawit and Noveleta, Cavite 20,000,000 22. Laguna Lake Development Project, Flood Control Component 41,000,000 23. Balanak River Control Project, Pagsanjan, Laguna 10,000,000 Region V .................... P 20,000,000 24. Daet River Control Project, Camarines Norte 10,000,000 25. Sorsogon Schistosomiasis Control and Related Projects 10,000,000 Region VI .................... P 84,000,000 26. Aklan River Control Project, Banga, Libacao, Lezo, Numancia, Malinao, Aklan 8,000,000 27. Jalaur River Control Project, Calinog, Iloilo 8,000,000 28. Dumangas-Zarraga- Leganes Flood Control Project, Iloilo 8,000,000 29. Iloilo City Drainage System 8,000,000 30. Kalibo Drainage System, Aklan 8,000,000 31. San Carlos City Drainage System 8,000,000 32. Regionwide 36,000,000 Region VII .................... P 65,000,000 33. Siaton River Control Project, Negros Oriental 10,000,000 34. Cebu City Drainage System 11,000,000 35. Bacong River Control Project, Negros Oriental 11,000,000 36. Dumaguete City Drainage System 10,000,000 37. Tumogong River Control Project, Bais City 13,000,000 38. Inabanga River Control Project, Inabanga, Bohol 10,000,000 Region VIII .................... P 54,000,000 39. Saba Basin Schistosomiasis Control and Related Projects, Leyte 10,000,000 40. Tacloban City Drainage System 14,000,000 41. Ormoc City Drainage System 10,000,000 42. Subang Dacu River Control Project, Southern Leyte 10,000,000 43. Regional Government Center Drainage System, Palo, Leyte 10,000,000 Region IX .................... P 20,000,000 44. Dipolog River Control Project 10,000,000 45. Polanco River Control Project, Zamboanga del Norte 10,000,000 Region X .................... P 82,000,000 46. Lake Mainit Drainage, Jabonga and Tubay, Agusan del Norte 20,000,000 47. Tuguibo River Control Project, Tuguibo, Agusan del Norte 12,000,000 48. Mambayaoan River Control Project, Balingasag, Misamis Oriental 10,000,000 49. Cabadbaran River Control Project, Agusan del Norte 10,000,000 50. Tubay River Control Project, Agusan del Norte 10,000,000 51. Usogon River Control Project, Bonifacio, Misamis Occidental 10,000,000 52. Lawayan River Control Project, Oroquieta City 10,000,000 Region XI .................... P 122,000,000 53. Upper Agusan River Control Project, Davao del Norte 60,000,000 54. Tago River Control Project, Surigao del Sur 22,000,000 55. Davao City Drainage System 10,000,000 56. Nabanturan River Control Project, Davao del Norte 10,000,000 57. Glan River Control Project, South Cotabato 10,000,000 58. Sta. Cruz and Padada River Control Project, Davao del Sur 10,000,000 Region XII .................... P 30,000,000 59. Marawi City Drainage System 10,000,000 60. Cotabato City Drainage System 10,000,000 61. Iligan City Flood Control and Drainage System 10,000,000 Nationwide .................... P 1,038,000,000 62. Pampanga, Bicol, and Cotabato Rivers System Dredging Project 185,000,000 63. Schistosomiasis Flood Control and Related Projects 53,000,000 64. Various Flood Control and Drainage and Related Projects __P 800,000,000 Total, Title F ........... P 2,058,000,000 Title G.—SHORE PROTECTION For the construction, improvement, provision, rehabilitation, reconstruction and/or completion of shore protection projects, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region .................... P 5,000,000 Region I .................... 8,000,000 Region II .................... 6,000,000 Region III .................... 5,000,000 Region IV .................... 6,000,000 Region V .................... 6,000,000 Region VI .................... 8,000,000 Region VII .................... 7,000,000 Region VIII .................... 9,000,000 Region IX .................... 6,000,000 Region X .................... 9,000,000 Region XI .................... 6,000,000 Region XII .................... 6,000,000 Nationwide .................... ___20,000,000 Total, Title G .......... P 107,000,000 Title H.—TELECOMMUNICATIONS For the construction, improvement, provision, rehabilitation, reconstruction, and/or completion of telecommunications projects, including feasibility and detailed engineering studies, acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region (NCR) .................... P 13,500,000 Development of Telecommunications Training Institute 13,500,000 Regions I & II .................... P 388,100,000 Rural Telecommunications Development Project 388,100,000 Regions III & IV .................... P 375,000,000 Rural Telecommunications Development Project 375,000,000 Region V .................... P 194,700,000 Rural Telecommunications Development Project 194,700,000 Regions VI & VII .................... P 2,055,000,000 Rural Telecommunications Development Project 2,055,000,000 Region VIII .................... P 540,000,000 Rural Telecommunications Development Project 540,000,000 Regions IX, X, XI & XII .................... P 3,382,600,000 Rural Telecommunications Development Project 3,382,600,000 Nationwide .................... 651,100,000 Improvement and Development of National and Regional Telecommunications Network ___651,100,000 Total, Title H .......... P 7,600,000,000 For the construction, improvement, provision, rehabilitation, reconstruction, and/or completion of postal facilities, including detailed engineering studies, acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. National Capital Region .................... P 49,600,000 1. Bureau of Post Building 39,600,000 2. National Postal Training Center 10,000,000 Various Post Offices/Distribution Centers P 170,600,000 Region I .................... 16,000,000 Region II .................... 9,000,000 Region III .................... 16,000,000 Region IV .................... 16,000,000 Region V .................... 9,000,000 Region VI .................... 12,000,000 Region VII .................... 15,000,000 Region VIII .................... 10,600,000 Region IX .................... 10,000,000 Region X .................... 10,000,000 Region XI .................... 12,000,000 Region XII .................... 10,000,000 National Capital Region (NCR) .................... ___25,000,000 Total, Title I .......... P 220,200,000 Title J.—FEASIBILITY STUDIES AND ENGINEERING ACTIVITIES For the conduct of feasibility studies and investigation surveys, preparation of plans and designs, and other engineering activities for infrastructure projects. Nationwide P 500,000,000 1. Public Works and Highways 300,000,000 2. Transportation and Communications __200,000,000 Total, Title J.......... P 500,000,000 Title K.—RIGHTS-OF-WAY For the acquisition of rights-of-way necessary for the implementation of public works projects. Nationwide P 600,000,000 1. Public Works and Highways 400,000,000 2. Transportation and Communications _200,000,000 Total, Title K .......... P 600,000,000 For the construction, improvement, provision, rehabilitation and reconstruction of various miscellaneous public works projects, including engineering and acquisition of sites, equipment, materials, supplies and services to be used directly for the projects. Nationwide Various Projects P 300,000,000 Total, Title L P 300,000,000