Section 2
SECTION 2. Upon takeover of the water system, the MWSS shall evaluate such system considering the adequacy, potability and other prevailing operating conditions. The MWSS shall thereafter cause the system to operate at the desired level as to provide adequate and potable water supply. The cost to render the system operable shall be chargeable to the subdivision owner/developer provided that the provision of adequate water supply has been specified or implied in the contract of sale or other forms used in offering the housing units within the project for sale. Otherwise, the cost to make the system operational shall be chargeable to the homeowners of the subdivision.