Section 5
SEC. 5. Whenever it shall become necessary in the erection of its poles to take up any portion of the side or other materials which may have been placed, taken or of the public streets or thoroughfares, the grantee shall, after said poles shall have been erected, replace without delay said sidewalks and other property in a proper manner, removing from the same all rubbish, dirt, refuse, or other materials which may have been placed, taken or dug up thereon in and during the process of the erection of such poles, leaving all such sidewalks in as good condition as before the work was done.