My bookmarksSign up free

RA 4464 Section 3

RA 4464 Section 3

Section 3

SEC. 3. For the purpose of erecting and placing the poles or other supports of such wires or other conductors or of laying and maintaining underground said wires, cables or other conductors, it shall be lawful for the grantee, his successors or assigns, to make excavations or lay conduits in any of the public places, highways, streets, alleys, lanes, avenues, sidewalks or bridges in the municipalities of Capaz and Concepcion, both in the Province of Tarlac: Provided, however, That any public place, highway, street, alley, lane, avenue, sidewalk or bridge disturbed, altered or changed by reason of the erection of poles or other supports, or the laying of underground wires or other conductors, or of conduits, shall be repaired and restored to the satisfaction of the district engineer of the province, and removing from the same all rubbish, dirt, refuse, or other materials which may have been placed there or taken up in the erection of said poles or the laying of said underground conduits, leaving them in as good condition as they were before the work was done.

Read the full instrument →

Other provisions in RA 4464

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of July 4, 2026

CitationRA 4464 Section 3 (LawPlayer, data as of July 4, 2026)

Source: Supreme Court E-Library, Republic of the Philippines. Philippine laws are public documents (works of the government).

Continue your research