s 22FY Deviation from approved design score
22FY. Where the design score in relation to any major energy use change to a Type 2 building has been approved by the Commissioner of Building Control under section 22FX and the owner of the building, in carrying out the major energy use change, intends to depart or deviate from the design on which the approved design score was assessed, the mechanical engineer appointed under section 22FX(1)(a) —(a) must ensure that the design score for the major energy use change with such departure or deviation still meets the minimum environmental sustainability standard, subject to any modification or waiver under section 22FX(5); but[Act 28 of 2024 wef 30/09/2025] (b) need not re-submit the design score to the Commissioner of Building Control for approval.[22/2012] [Act 28 of 2024 wef 30/09/2025]