High Speed Rail (London - West Midlands) Act 2017 s 2

High Speed Rail (London - West Midlands) Act 2017 s 2

s 2 Further provision about works

(1) The nominated undertaker may, for the purposes of or in connection with the scheduled works or otherwise for Phase One purposes, do any of the following within the Act limits— (a) carry out and maintain railway electrification and signalling works; (b) make, provide and maintain all such approaches, bridges, subways, interchanges, roundabouts, turning places, lifts, stairs, escalators, ramps, passages, means of access, shafts, buildings, apparatus, plant and machinery as may be necessary or expedient; (c) construct, provide and maintain all such embankments, aprons, abutments, retaining walls, wing walls, culverts and other works as may be necessary or expedient; (d) demolish the whole or part of any building or structure; (e) alter or remove any structure erected upon any highway or adjoining land; (f) alter, or alter the position of, railway track and any apparatus associated with railway track; (g) alter, or alter the position of, other apparatus, including mains, sewers, drains and cables; (h) alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses; (i) carry out and maintain such other works, of whatever description, as may be necessary or expedient. (2) Subsection (1) does not authorise the making of any cut for drainage purposes which is more than 3.4 metres wide at the bottom. (3) The nominated undertaker may within the Act limits— (a) carry out and maintain landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of any of the works authorised by this Act, and (b) carry out and maintain works for the benefit or protection of land affected by any of the works authorised by this Act. (4) Schedule 2 contains further and supplementary provision about works. (5) Without prejudice to subsection (1)(g), the nominated undertaker may, for the purposes of or in connection with the works authorised by this Act, undertake the electric line diversions and other works specified in the table in Schedule 3.

Read this section in the full act →

DATA NOTES

About the data

Sources

This page

Law
High Speed Rail (London - West Midlands) Act 2017, s 2 is headed “Further provision about works” and is a provision of UK legislation.
Text
The text of High Speed Rail (London - West Midlands) Act 2017, s 2 begins “(1) The nominated undertaker may, for the purposes of or in connection with the scheduled works or otherwise for Phase One purposes, do any…”.
Location
High Speed Rail (London - West Midlands) Act 2017, s 2 is placed under “Works”.
Date
High Speed Rail (London - West Midlands) Act 2017 was enacted on 23 February 2017.
Previous
On LawPlayer, the provision listed immediately before High Speed Rail (London - West Midlands) Act 2017, s 2 is s 1.
Next
On LawPlayer, the provision listed immediately after High Speed Rail (London - West Midlands) Act 2017, s 2 is s 3.
Synced
LawPlayer last synced the text of High Speed Rail (London - West Midlands) Act 2017 from legislation.gov.uk (The National Archives) on 4 July 2026.
High Speed Rail (London - West Midlands) Act 2017, s 2 is reproduced on LawPlayer from legislation.gov.uk (The National Archives).

Sources

Contains public sector information licensed under the Open Government Licence v3.0.Read the official text

About

On LawPlayer, every provision of a UK Act or statutory instrument has its own page, linked to the full text and to its Parts; the same site also covers Taiwan's statutes, court judgments and company registration records, and the legislation of 13 other jurisdictions.UK legislation entry

What to look at next