art 3 Power to carry out works
(1) Subject to the provisions of this Order, the Trust may, in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plan and sections, carry out and maintain the following works in the parish of Thurso, county of Caithness, Highland, and on the foreshore and bed of the sea adjacent thereto together with all necessary and proper works and conveniences connected therewith or incidental thereto:— Work No 1: A quay of solid construction commencing at a point above the level of high water 85 metres east of the existing Terminal Quay and 52 metres south of the existing shoreline at ND 310415 970472 and extending east-northeast for a distance of 400 metres termin ating at a point ND 310777 970636, and the construc tion over part thereof of necessary buildings with a reclamation of the seabed by infilling, levelling and surfacing. Work No 2: An extension of the existing Terminal Quay as a solid structure commencing at a point on the foreshore above the level of high water 42 metres east of the existing Terminal Quay at ND 310355 970508 and extending south-southeast for a distance of 325 metres terminating at a point at ND 310482 970207, and the construction over part thereof of necessary buildings with a reclamation of the seabed by infilling, levelling and surfacing. Work No 3: A breakwater quay commencing at a point 29 metres south of the centre line of Work No 1 and 50 metres west of the termination point of the said Work No 1 at a point at ND 310741 970591 extending 153 metres south-southeast and then a further 116 metres south-southwest to terminate at a point at ND 310794 970348, of solid construction bedded on filling placed on the seabed. Work No 4: A breakwater quay of solid construction commencing from a point 23 metres north of the south end of the existing berthing jetty at ND 310452 970185 and extending 198 metres east-northeast then a further 120 metres north-northeast to terminate at a point ND 310655 970347 together with a reclamation of the seabed by infilling, levelling and surfacing. Work No 5: Dredging of an area of seabed commencing from the east side of Work No 2 at a point ND 310463 970341 and extending 115 metres east-northeast to terminate at a point ND 310575 970384. Work No 6: An extension of the existing Harbour Quay as a solid structure commencing at the east face of the existing Outer Quay at a point ND 310089 970361 and extending 120 metres east-northeast to terminate at the west face of the existing Ola Quay at a point ND 310202 970405, with a reclamation of the seabed by infilling, levelling and surfacing. (2) The Trust may, within the limits of deviation, maintain, renew, reconstruct and alter temporarily or permanently the works.