The Bitton Railway Order 2002 art 4

The Bitton Railway Order 2002 art 4

art 4 Power to construct works

(1) The undertaker may construct and maintain the scheduled work. (2) Subject to article 5 below, the scheduled work shall be constructed in the line or situations shown on the deposited plan and in accordance with the levels shown on the deposited section. (3) The undertaker may, within the limits of deviation, carry out and maintain such of the following works as may be necessary or expedient for the purposes of, in connection with or in consequence of, the construction of the scheduled work, namely— (a) works to alter the position of apparatus, including mains, sewers, drains and cables; (b) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses; and (c) landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised works. (4) The undertaker may, within the limits of deviation carry out such other works (of whatever nature) as may be necessary or expedient for the purposes of, or in connection with or in consequence of, the construction of the scheduled work.

Read this section in the full act → · Open PART II →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.

What to look at next