Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy

Regulation (EC) No 663/2009 of the European Parliament and of the Council of 13 July 2009 establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy

Regulation (EC) No 663/2009 · Regulation · 30 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

CHAPTER I — INTRODUCTORY PROVISIONS

Subject matter

Article 1

This Regulation establishes a financing instrument entitled the European Energy Programme for Recovery (the EEPR) for the development of projects in the field of energy in the Community which, by providing a financial stimulus, contribute to economic recovery, the security of energy supply and the reduction of greenhouse gas emissions. This Regulation establishes sub-programmes to advance those objectives in the fields of: (a) gas and electricity infrastructures; (b) offshore wind energy; and (c) carbon capture and storage. This Regulation identifies projects to be financed under each sub-programme and lays down criteria for identifying and implementing actions to realise these projects.

Definitions

Article 2

For the purposes of this Regulation, the following definitions shall apply: (a) ‘carbon capture and storage’ means the capture of carbon dioxide (CO 2 ) from industrial installations, its transport to a storage site and its injection into a suitable underground geological formation for the purposes of permanent storage; (b) ‘eligible costs’ has the same meaning as in Regulation (EC, Euratom) No 2342/2002; (c) ‘gas and electricity infrastructures’ means: (i) all high-voltage lines, excluding those of distribution networks, and submarine links, provided that this infrastructure is used for interregional or international transmission or connection; (ii) high-pressure gas pipelines, excluding those of distribution networks; (iii) underground storage facilities connected to the high-pressure gas pipelines referred to in point (ii); (iv) reception, storage and regasification facilities for liquefied natural gas (LNG); and (v) any equipment or installations essential for the infrastructure referred to in points (i), (ii), (iii) or (iv) to operate properly, including protection, monitoring and control systems; (d) ‘part of a project’ means any activity that is independent financially, technically or over time and which contributes to the completion of a project; (e) ‘investment phase’ means the phase of a project during which construction takes place and capital costs are incurred; (f) ‘offshore wind energy’ means the electric power generated from turbine engines powered by wind and situated in the sea, whether near or far from the shore; (g) ‘planning phase’ means the phase of a project that precedes the investment phase, during which project implementation is prepared, and includes, where appropriate, feasibility assessment, preparatory and technical studies, obtaining licences and authorisations and incurring capital costs.

Budget

Article 3

1.   The financial envelope for the implementation of the EEPR for 2009 and 2010 shall be EUR 3 980 000 000, allocated as follows: (a) gas and electricity infrastructure projects: EUR 2 365 000 000; (b) offshore wind energy projects: EUR 565 000 000; (c) carbon capture and storage projects: EUR 1 050 000 000. 2.   Individual legal commitments implementing the budgetary commitments made in 2009 and 2010 shall be made by 31 December 2010.

CHAPTER II — SUB-PROGRAMMES
SECTION 1 — Gas and electricity infrastructure projects

Objectives

Article 4

The Community shall promote gas and electricity infrastructure projects having the highest Community added value and contributing to the following objectives: (a) security and diversification of sources of energy, routes and supplies; (b) the optimisation of the capacity of the energy network and the integration of the internal energy market, in particular concerning cross-border sections; (c) the development of the network to strengthen economic and social cohesion by reducing the isolation of the least favoured regions or islands of the Community; (d) the connection and integration of renewable energy resources; and (e) the safety, reliability and interoperability of interconnected energy networks, including the ability to use multidirectional gas flows where necessary.

Priorities

Article 5

The EEPR shall serve urgently to adapt and develop energy networks of particular importance to the Community in support of the operation of the internal energy market and, in particular, to increase interconnection capacity, security and diversification of supply and to overcome environmental, technical and financial obstacles. Special Community support is necessary to develop energy networks more intensively and to accelerate their construction, notably where the diversity of routes and sources of supply is low.

Granting of Community financial assistance

Article 6

1.   Financial assistance under the EEPR (EEPR assistance) for gas and electricity infrastructure projects shall be awarded for actions that implement the projects listed in Part A of the Annex or parts of such projects, and which contribute to the objectives laid down in Article 4. 2.   The Commission shall call for proposals to identify the actions referred to in paragraph 1 and shall assess the compliance of those proposals with the eligibility criteria laid down in Article 7 and the selection and award criteria laid down in Article 8. 3.   The Commission shall inform the beneficiaries of any EEPR assistance to be granted.

Eligibility

Article 7

1.   Proposals shall be eligible for EEPR assistance only if they implement the projects listed in Part A of the Annex, do not exceed the maximum amount of EERP assistance laid down therein and fulfil the selection and award criteria under Article 8. 2.   Proposals may be submitted: (a) by one or several Member States, acting jointly; (b) with the agreement of all Member States directly concerned by the project in question: (i) by one or several public or private undertakings or bodies acting jointly; (ii) by one or several international organisations acting jointly; or (iii) by a joint undertaking. 3.   Proposals submitted by natural persons shall not be eligible.

Selection and award criteria

Article 8

1.   In assessing the proposals received under the call for proposals referred to in Article 6(2), the Commission shall apply the following selection criteria: (a) the soundness and technical adequacy of the approach; (b) the soundness of the financial package for the full investment phase of the action. 2.   In assessing the proposals received under the call for proposals referred to in Article 6(2), the Commission shall apply the following award criteria: (a) maturity, defined as reaching the investment stage, and incurring substantial capital expenditure by the end of 2010; (b) the extent to which lack of access to finance is delaying the implementation of the action; (c) the extent to which EEPR assistance will stimulate public and private finance; (d) socioeconomic impacts; (e) environmental impacts; (f) the contribution to the continuity and interoperability of the energy network, and to the optimisation of its capacity; (g) the contribution to the improvement of service quality, safety and security; (h) the contribution to the creation of a well-integrated energy market.

Funding conditions

Article 9

1.   EEPR assistance shall contribute to project-related expenditure for the implementation of the project, incurred by the beneficiaries or by third parties responsible for the implementation of a project. 2.   EEPR assistance shall not exceed 50 % of the eligible costs.

Instruments

Article 10

1.   Following the call for proposals referred to in Article 6(2), the Commission, acting in accordance with the management procedure referred to in Article 26(2), shall select the proposals to receive EEPR assistance and determine the amount of EEPR assistance to be granted. The Commission shall specify the conditions and methods for the implementation of the proposals. 2.   EEPR assistance shall be granted on the basis of Commission decisions.

Member States’ financial responsibilities

Article 11

1.   Member States shall undertake the technical monitoring and financial control of projects in close cooperation with the Commission and shall certify the amount and the conformity with this Regulation of the expenditure incurred in respect of projects or parts of projects. Member States may request the participation of the Commission during on-the-spot checks. 2.   Member States shall inform the Commission of the measures taken under paragraph 1 and, in particular, shall supply a description of the control, management and monitoring systems established to ensure that projects are successfully completed.

SECTION 2 — Offshore wind projects

Granting of EEPR assistance

Article 12

1.   EEPR assistance for offshore wind projects shall be awarded following a call for proposals limited to the actions that implement the projects listed in Part B of the Annex. 2.   The Commission shall call for proposals to identify the actions referred to in paragraph 1 and shall assess the compliance of these proposals with the eligibility criteria laid down in Article 13 and the selection and award criteria laid down in Article 14. 3.   The Commission shall inform the beneficiaries of any EEPR assistance to be granted.

Eligibility

Article 13

1.   Proposals shall be eligible for EEPR assistance only if they implement the projects listed in Part B of the Annex, do not exceed the maximum amount of EEPR assistance laid down therein and fulfil the selection and award criteria under Article 14. Those projects shall be led by a commercial undertaking. 2.   Proposals may be submitted by one or several undertakings, acting jointly. 3.   Proposals submitted by natural persons shall not be eligible.

Selection and award criteria

Article 14

1.   In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following selection criteria: (a) the soundness and technical adequacy of the approach; (b) the soundness of the financial package for the full investment phase of the project. 2.   In assessing the proposals received under the call for proposals referred to in Article 12(1), the Commission shall apply the following award criteria: (a) maturity, defined as reaching the investment stage, and incurring substantial capital expenditure by the end of 2010; (b) the extent to which lack of access to finance is delaying the implementation of the action; (c) the extent to which the project improves or increases the scale of installations and infrastructures that are already under construction, or are in the planning phase; (d) the extent to which the project includes the construction of full-size and industrial-scale installations and infrastructures, and addresses in particular the following matters: (i) the balancing of the variability of wind electricity through integrative systems; (ii) the existence of large-scale storage systems; (iii) the management of wind farms as virtual power plants (more than 1 GW); (iv) the existence of turbines placed further from the shore or in deeper waters (20 to 50 m) than is currently standard; (v) novel sub-structure designs; or (vi) processes for assembly, installation, operation and decommissioning and testing of these processes in life-size projects; (e) the innovative features of the project and the extent to which it will demonstrate the implementation of such features; (f) the impact of the project and its contribution to the Community’s offshore wind grid system, including its replication potential; (g) the commitment demonstrated by the beneficiaries to disseminate to other European operators the results of technological advances made by the project in a manner compatible with Community law and in particular with the objectives and structures outlined in the Strategic Energy Technology Plan for Europe.

Funding conditions

Article 15

1.   EEPR assistance shall contribute to project-related expenditure for the implementation of the project. 2.   EEPR assistance shall not exceed 50 % of the eligible costs.

Instruments

Article 16

1.   Following the call for proposals referred to in Article 12(1), the Commission, acting in accordance with the management procedure referred to in Article 26(2), shall select the proposals to receive EEPR assistance and determine the amount of funding to be granted. The Commission shall specify the conditions and methods for the implementation of the proposals. 2.   EEPR assistance shall be granted on the basis of grant agreements.

SECTION 3 — Carbon capture and storage projects

Granting of EEPR assistance

Article 17

1.   EEPR assistance for carbon capture and storage projects shall be awarded to actions that implement the projects listed in Part C of the Annex. 2.   The Commission shall call for proposals to identify the actions referred to in paragraph 1 of this Article and shall assess the compliance of the proposals with the eligibility criteria laid down in Article 18 and the selection and award criteria laid down in Article 19. 3.   If several proposals from projects located in the same Member State comply with the eligibility criteria laid down in Article 18 and the selection criteria laid down in Article 19(1), the Commission shall select for EEPR assistance, on the basis of the award criteria in Article 19(2), no more than one proposal per Member State among those proposals. 4.   The Commission shall inform the beneficiaries of any EEPR assistance to be granted.

Eligibility

Article 18

1.   Proposals shall be eligible for EEPR assistance only if they implement the projects listed in Part C of the Annex, fulfil the selection and award criteria under Article 19 and the following conditions: (a) the projects demonstrate that they have the ability to capture at least 80 % of CO 2 in industrial installations and to transport and geologically store this CO 2 safely underground; (b) in power installations, CO 2 capture is demonstrated on an installation of at least 250 MW electrical output or equivalent; (c) project promoters make a binding declaration that the generic knowledge generated by the demonstration plant will be made available to the wider industry and to the Commission to contribute to the Strategic Energy Technology Plan for Europe. 2.   Proposals shall be submitted by one or several undertakings, acting jointly. 3.   Proposals submitted by natural persons shall not be eligible.

Selection and award criteria

Article 19

1.   In assessing the proposals received under the call for proposals referred to in Article 17(2), the Commission shall apply the following selection criteria: (a) the soundness and technical adequacy of the approach; (b) maturity, defined as reaching the investment stage, which includes exploration and development of storage options, and incurring substantial investment-related expenditure for the project by the end of 2010; (c) the soundness of the financial package for the full investment phase of the project; (d) identification of all necessary permits required for construction and operation of the project at the proposed site(s) and the existence of a strategy to secure those permits. 2.   In assessing the proposals received under the call for proposals referred to in Article 17(2), the Commission shall apply the following award criteria: (a) the extent to which lack of access to finance is delaying the implementation of the action; (b) requested funding per tonne of CO 2 to be abated in the first five years of operation of the project; (c) the complexity of the project and level of innovation of the overall installation including other accompanying research activities and the commitment demonstrated by the beneficiaries to disseminate to other European operators the results of the technological advances made by the project in a manner compatible with Community law and in particular with the objectives and structures outlined in the Strategic Energy Technology Plan for Europe; (d) the soundness and adequacy of the management plan including, in relation to the scientific, engineering and technical information and data contained therein, demonstration of readiness of the proposed concept to achieve operation of the project by 31 December 2015.

Funding conditions

Article 20

1.   EEPR assistance shall contribute only to project-related expenditure for the implementation of the project which is attributable to carbon capture, transport and storage, taking account of possible operating benefits. 2.   EEPR assistance shall not exceed 80 % of total eligible investment costs.

Instruments

Article 21

1.   Following the call for proposals referred to in Article 17(2), the Commission, acting in accordance with the management procedure referred to in Article 26(2), shall select the proposals to receive EEPR assistance and determine the amount of EEPR assistance to be granted. The Commission shall specify the conditions and methods for the implementation of the proposals. 2.   EEPR assistance shall be granted on the basis of grant agreements.

CHAPTER III — COMMON PROVISIONS

Other EEPR assistance and instruments

Article 22

1.   A part of the Community assistance for the projects listed in the Annex may be granted through a contribution to an appropriate instrument under the resources of the European Investment Bank. That contribution shall not exceed EUR 500 000 000. 2.   The Community exposure to the loan guarantee instrument or other financing instrument, including management fees and other eligible costs, shall be limited to the amount of the Community contribution to that instrument and there shall be no further liability on the general budget of the European Union. 3.   The Commission, acting in accordance with the management procedure referred to in Article 26(2), shall decide on the amount of EEPR assistance to be granted to that instrument. The Commission and the European Investment Bank shall conclude a memorandum of understanding specifying the conditions and the methods for the implementation of that decision.

Programming and implementing arrangements

Article 23

1.   Calls for proposals shall be directly launched by the Commission on the basis of budgetary availabilities referred to in Article 3(1) and the eligibility, selection and award criteria set out in Chapter II. 2.   EEPR assistance shall cover only project-related expenditure incurred by the beneficiaries and, as regards projects under Article 9, also by third parties responsible for the implementation of a project. Expenditure may be eligible from the date referred to in Article 29. 3.   VAT shall not be an eligible cost, except for non-refundable VAT. 4.   Projects and actions financed under this Regulation shall be carried out in accordance with Community law and shall take into account any relevant Community policies, in particular those relating to competition including the applicable State aid rules, protection of the environment, health, sustainable development and public procurement.

Member States’ general responsibilities

Article 24

Within the sphere of their responsibility, Member States shall make every effort to implement the projects which receive EEPR assistance, notably through efficient administrative authorisation, licensing and certification procedures.

Protection of the European Communities’ financial interests

Article 25

1.   The Commission shall ensure that, when actions financed under this Regulation are implemented, the financial interests of the Community are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective checks and by the recovery of amounts unduly paid and, if irregularities are detected, by effective, proportionate and dissuasive penalties, in accordance with Regulation (EC, Euratom) No 2988/95, Regulation (Euratom, EC) No 2185/96 and with Regulation (EC) No 1073/1999. 2.   For the Community actions financed under this Regulation, the notion of irregularity referred to in Article 1(2) of Regulation (EC, Euratom) No 2988/95 shall mean any infringement of a provision of Community law or any breach of a contractual obligation resulting from an act or omission by an economic operator, which has, or would have, the effect of prejudicing the general budget of the European Union or budgets managed by it, by an unjustified item of expenditure. 3.   All implementing measures resulting from this Regulation shall provide, in particular, for supervision and financial control by the Commission or any representative authorised by it, and by audits by the European Court of Auditors, including, if necessary, on-the-spot audits.

CHAPTER IV — IMPLEMENTING AND FINAL PROVISIONS

Committees

Article 26

1.   The Commission shall be assisted by the following committees: (a) for gas and electricity infrastructure projects, the committee established by Article 15 of Regulation (EC) No 680/2007 of the European Parliament and of the Council of 20 June 2007 laying down general rules for the granting of Community financial aid in the field of the trans-European transport and energy networks  ( 9 ) ; (b) for offshore wind projects, the committee established by Article 8 of Council Decision 2006/971/EC of 19 December 2006 concerning the Specific Programme Cooperation implementing the Seventh Framework Programme of the European Community for research, technological development and demonstration activities (2007 to 2013)  ( 10 ) ; (c) for carbon capture and storage projects, the committee established by Article 8 of Decision 2006/971/EC. 2.   Where reference is made to this paragraph, Articles 4 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. The period laid down in Article 4(3) of Decision 1999/468/EC shall be set at one month.

Evaluation

Article 27

1.   The Commission shall carry out an evaluation of the EEPR by 31 December 2011 in order to assess its contribution to the effective use made of the appropriations. 2.   The Commission may request a beneficiary Member State to provide a specific evaluation of projects financed under Section 1 of Chapter II of this Regulation or, where appropriate, to supply it with the information and assistance required to undertake an evaluation of such projects. 3.   The Commission shall present to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions an evaluation report on the results achieved by the EEPR.

Information to the European Parliament and to the Council

Article 28

The Commission shall monitor the implementation of this Regulation. It shall, each year, on presentation of the preliminary draft budget, present a report to the European Parliament and to the Council on the implementation of the EEPR. If the report identifies serious risks in implementing the priority projects, the Commission shall recommend measures to offset those risks, and shall, where appropriate and consistent with the Recovery Plan, make additional proposals for such projects.

Entry into force

Article 29

This Regulation shall enter into force on the day following its publication in the Official Journal of the European Union .

Supplementary provisions

ANNEXSupplementary provisions

ANNEX ELIGIBLE PROJECTS A.    Gas and Electricity infrastructure projects 1.    Gas interconnectors Project Location of projects supported Envisaged Community contribution (EUR million) Southern Gas Corridor NABUCCO Austria, Hungary, Bulgaria, Germany, Romania 200 ITGI – Poseidon Italy, Greece 100 Baltic interconnection Skanled/Baltic pipe Poland, Denmark, Sweden 150 LNG network Liquefied Natural Gas terminal at Polish coast at port of Świnoujście Poland 80 Central and South East Europe Slovakia-Hungary Interconnector (Veľký Krtíš - Vecsés) Slovakia, Hungary 30 Gas transmission system in Slovenia between the Austrian Border to Ljubljana (excluding the section Rogatec-Kidričevo) Slovenia 40 Interconnection Bulgaria-Greece (Stara Zagora — Dimitrovgrad-Komotini) Bulgaria, Greece 45 Romania-Hungary gas interconnector Romania, Hungary 30 Expansion of Gas Storage Capacity in the Czech hub Czech Republic 35 Infrastructure and equipment to permit reverse gas flow in the event of short term supply disruption Austria, Bulgaria, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Poland, Portugal, Romania, Slovakia 80 Slovakia-Poland interconnection Slovakia, Poland 20 Hungary-Croatia interconnection Hungary 20 Bulgaria-Romania interconnection Bulgaria, Romania 10 Mediterranean Reinforcement of FR gas network on the Africa-Spain-France axis France 200 GALSI (Gazoduc Algérie-Italie) Italy 120 Gas Interconnection Western Axis Larrau Branch Spain 45 North Sea area Germany-Belgium-United Kingdom pipeline Belgium 35 France-Belgium connection France, Belgium 200 TOTAL   1 440 2.    Electricity interconnectors Project Location of projects supported Envisaged Community contribution (EUR million) Baltic interconnection Estlink-2 Estonia, Finland 100 Interconnection Sweden-Baltic States, and strengthening of the grid in Baltic States Sweden, Latvia, Lithuania 175 Central and South East Europe Halle/Saale – Schweinfurt Germany 100 Wien-Győr Austria, Hungary 20 Mediterranean Portugal-Spain interconnection reinforcement Portugal 50 Interconnection France-Spain (Baixas - Sta Llogaia) France, Spain 225 New 380 kV AC submarine cable between Sicily – Continental Italy (Sorgente – Rizziconi) Italy 110 North Sea area 500 MW Ireland/Wales interconnector (Meath-Deeside) Ireland, United Kingdom 110 Electricity interconnection Malta-Italy Malta/Italy 20 TOTAL   910 3.    Small island projects Small isolated island initiatives Cyprus 10 Malta 5 TOTAL   15 B.    Offshore wind projects Project Capacity Location of projects supported Envisaged Community contribution (EUR million) 1.    Grid integration of offshore wind energy 1.1. Baltic – Kriegers Flak I, II, III Building on projects under development. Financing aimed at ensuring extra cost for securing a joint interconnection solution. 1,5 GW Denmark, Sweden, Germany, Poland 150 1.2. North sea grid Modular development of offshore grid, demonstration of virtual offshore power plant and integration in the existing onshore grid system. 1 GW United Kingdom, Netherlands, Germany, Ireland, Denmark, Belgium, France, Luxembourg 165 2.    New turbines, structures and components, optimisation of manufacturing capacities 2.1. Borkum West II – Bard 1 – Nordsee Ost – Global Tech I New generation of multi-megawatt size turbines (5-7 MW) and innovative structures, situated far from shore (up to 100 km) in deeper waters (up to 40 m). 1,6 GW Germany 200 2.2. Aberdeen offshore wind farm (European testing centre) Building on project presently under development – testing of multi-MW turbines. Development of innovative structures and substructures including optimisation of manufacturing capacities of offshore wind energy production equipment. An increase in size of 100 MW can be envisaged. 0,25 GW United Kingdom 40 2.3. Thornton Bank Building on project presently under development. Learning from the Downvind project (cofinanced through FP6). Upscaling the Downvind installations turbines (5 MW size) in deep waters (up to 30 m) with low visual impact (up to 30 km). 90 MW Belgium 10 TOTAL     565 C.    Carbon capture and storage projects Project Name/Location Envisaged Community contribution (EUR million) Fuel Capacity Capture Technique Storage Concept Huerth Germany 180 Coal 450 MW IGCC Saline Aquifer Jaenschwalde     Coal 500 MW Oxyfuel Oil/Gas fields Eemshaven Netherlands 180 Coal 1 200 MW IGCC Oil/Gas fields Rotterdam Coal 1 080 MW PC Oil/Gas fields Rotterdam Coal 800 MW PC Oil/Gas fields Bełchatów Poland 180 Coal 858 MW PC Saline Aquifer Compostilla (León) Spain 180 Coal 500 MW Oxyfuel Saline Aquifer Kingsnorth United Kingdom 180 Coal 800 MW PC Oil/Gas fields Longannet Coal 3 390 MW PC Saline Aquifer Tilbury Coal 1 600 MW PC Oil/Gas fields Hatfield (Yorkshire) Coal 900 MW IGCC Oil/Gas fields Porto Tolle Italy 100 Coal 660 MW PC   Industrial carbon capture project Florange France 50 Transport of CO 2 from industrial installation (steel plant) to underground storage (saline aquifer) TOTAL 1 050

Other acts of the same type
Commission Implementing Regulation (EU) 2019/1173 of 2 July 2019 entering a name in the register of protected designations of origin and protected geographical indications (‘Ayrshire New Potatoes’/‘Ayrshire Earlies’ (PGI))Commission Delegated Regulation (EU) 2019/2035 of 28 June 2019 supplementing Regulation (EU) 2016/429 of the European Parliament and of the Council as regards rules for establishments keeping terrestrial animals and hatcheries, and the traceability of certain kept terrestrial animals and hatching eggs (Text with EEA relevance)Commission Implementing Regulation (EU) 2019/1100 of 27 June 2019 concerning the non-renewal of approval of the active substance desmedipham, in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market, and amending the Annex to Commission Implementing Regulation (EU) No 540/2011 (Text with EEA relevance.)Commission Implementing Regulation (EU) 2019/1101 of 27 June 2019 renewing the approval of the active substance tolclofos-methyl in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market, and amending the Annex to Commission Implementing Regulation (EU) No 540/2011 (Text with EEA relevance.)Commission Regulation (EU) 2019/1102 of 27 June 2019 amending Regulation (EC) No 2003/2003 of the European Parliament and of the Council relating to fertilisers for the purposes of adapting Annexes I and IV (Text with EEA relevance.)Commission Implementing Regulation (EU) 2019/1103 of 27 June 2019 amending Council Regulation (EC) No 1210/2003 concerning certain specific restrictions on economic and financial relations with IraqCommission Implementing Regulation (EU) 2019/1090 of 26 June 2019 concerning the non-renewal of approval of the active substance dimethoate, in accordance with Regulation (EC) No 1107/2009 of the European Parliament and of the Council concerning the placing of plant protection products on the market, and amending the Annex to Commission Implementing Regulation (EU) No 540/2011 (Text with EEA relevance.)Commission Regulation (EU) 2019/1091 of 26 June 2019 amending Annex IV to Regulation (EC) No 999/2001 of the European Parliament and of the Council as regards the requirements for export of products containing processed animal protein derived from ruminants and non-ruminants (Text with EEA relevance.)Council Regulation (EU) 2019/1097 of 26 June 2019 amending Regulation (EU) 2019/124 as regards certain fishing opportunitiesCommission Implementing Regulation (EU) 2019/1098 of 26 June 2019 amending Regulation (EC) No 1484/95 as regards fixing representative prices in the poultrymeat and egg sectors and for egg albuminCommission Delegated Regulation (EU) 2019/1668 of 26 June 2019 amending Directive (EU) 2016/1629 of the European Parliament and of the Council laying down technical requirements for inland waterway vesselsCommission Implementing Regulation (EU) 2019/1084 of 25 June 2019 amending Regulation (EU) No 142/2011 as regards the harmonisation of the list of approved or registered establishments, plants and operators and the traceability of certain animal by-products and derived products (Text with EEA relevance.)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

What to look at next