My bookmarksSign up free
Source

2012/688/EU: Commission Implementing Decision of 5 November 2012 on the harmonisation of the frequency bands 1920 - 1980  MHz and 2110 - 2170  MHz for terrestrial systems capable of providing electronic communications services in the Union (notified under document C(2012) 7697) Text with EEA relevance

2012/688/EU: Commission Implementing Decision of 5 November 2012 on the harmonisation of the frequency bands 1920 - 1980  MHz and 2110 - 2170  MHz for terrestrial systems capable of providing electronic communications services in the Union (notified under document C(2012) 7697) Text with EEA relevance

Decision · 5 articles

In forceLast amended 2020-05-19

Version history

  1. Superseded version
  2. In force

Data as of 2026-11-02 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

This Decision aims at harmonising the conditions for the availability and efficient use of the frequency bands 1 920 -1 980  MHz and 2 110 -2 170  MHz (hereafter ‘the paired terrestrial 2 GHz band’) for terrestrial systems capable of providing electronic communications services in the Union.

Article 2

Open ↗

1.   Member States shall designate and make available, on a non-exclusive basis, the paired terrestrial 2 GHz band for terrestrial systems capable of providing electronic communications services in compliance with the parameters set out in the Annex to this Decision. 2.   Until 1 January 2026, Member States need not apply the General Parameters laid down in section B of the Annex in respect of rights of use for terrestrial electronic communications networks of spectrum in the paired terrestrial 2 GHz frequency band existing on the date when this Decision takes effect, to the extent that the exercise of those rights does not prevent the use of that band according to the Annex, subject to market demand. 3.   Member States shall ensure that the systems referred to in paragraph 1 give appropriate protection to systems in adjacent bands. 4.   Member States shall facilitate cross-border coordination agreements with the aim of enabling the operation of the systems referred to in paragraph 1, taking into account existing regulatory procedures and rights.

Article 3

Open ↗

Member States shall keep the use of the paired terrestrial 2 GHz band under scrutiny and report their findings to the Commission to allow regular and timely review of this Decision. Member States shall report to the Commission on the implementation of this Decision by 30 April 2021.

Supplementary provisions

PARAMETERS REFERRED TO IN ARTICLE 2(1)

ANNEXSupplementary provisions

Open ↗

ANNEX PARAMETERS REFERRED TO IN ARTICLE 2(1) A.    DEFINITIONS Active antenna systems (AAS) means a base station and an antenna system where the amplitude and/or phase between antenna elements is continually adjusted resulting in an antenna pattern that varies in response to short term changes in the radio environment. This excludes long-term beam shaping such as fixed electrical down tilt. In AAS base stations the antenna system is integrated as part of the base station system or product. Non-active antenna systems (non-AAS) means a base station and an antenna system that provides one or more antenna connectors, which are connected to one or more separately designed passive antenna elements to radiate radio waves. The amplitude and phase of the signals to the antenna elements is not continually adjusted in response to short term changes in the radio environment. Equivalent isotropically radiated power (EIRP) is the product of the power supplied to the antenna and the antenna gain in a given direction relative to an isotropic antenna (absolute or isotropic gain). Total radiated power (TRP) is a measure of how much power a composite antenna radiates. It equals the total conducted power input into the antenna array system less any losses in the antenna array system. TRP means the integral of the power transmitted in different directions over the entire radiation sphere as shown in the formula: where P(θ,φ) is the power radiated by an antenna array system in direction (θ,φ) given by the formula: P ( θ, φ ) = P Tx g ( θ, φ ) where P Tx denotes the conducted power (measured in Watts), which is input into the array system, and g(θ,φ) denotes the array system’s directional gain along the (θ, φ) direction. B.    GENERAL PARAMETERS Within the paired terrestrial 2 GHz band, the frequency arrangement shall be as follows: (1)  The duplex mode of operation is Frequency Division Duplex (FDD). The duplex spacing shall be 190 MHz with terminal station transmission (FDD uplink) located in the lower part of the band starting at 1 920 MHz and finishing at 1 980 MHz (‘lower band’) and base station transmission (FDD downlink) located in the upper part of the band starting at 2 110 MHz and finishing at 2 170 MHz (‘upper band’). (2)  The assigned block size shall be in multiples of 5 MHz ( 1 ). The lower frequency limit of an assigned block in the lower band of 1 920-1 980 MHz shall be aligned with or spaced at multiples of 5 MHz from its lower edge of 1 920 MHz. The lower frequency limit of an assigned block in the upper band of 2 110-2 170 MHz shall be aligned with or spaced at multiples of 5 MHz from its lower edge of 2 110 MHz. An assigned block may also have a size in the range of 4,8-5 MHz as long as it fits within the boundaries of a 5 MHz block as defined above. (3)  The lower band of 1 920-1 980 MHz or portions thereof, can be used for uplink-only operation ( 2 ) without paired spectrum within the upper band of 2 110-2 170 MHz. (4)  The upper band of 2 110-2 170 MHz or portions thereof, can be used for downlink-only operation ( 3 ) without paired spectrum within the lower band of 1 920-1 980 MHz. (5)  Base station and terminal station transmission shall be in compliance with the technical conditions specified in Part C and Part D, respectively. C.    TECHNICAL CONDITIONS FOR BASE STATIONS – BLOCK EDGE MASK The following technical parameters for base stations called Block Edge Mask (BEM) are an essential component of conditions necessary to ensure coexistence between neighbouring networks, in the absence of bilateral or multilateral agreements between operators of such neighbouring networks. Less stringent technical parameters, if agreed among all affected operators of such networks, may also be used provided that these operators continue to comply with the technical conditions applicable for the protection of other services, applications or networks and with obligations resulting from cross-border coordination. The BEM consists of several elements given in Table 1. The in-block power limit is applied to a block assigned to an operator. The baseline power limit, designed to protect the spectrum of other operators, and the transitional region power limit, enabling filter roll-off from the in-block to the baseline power limit represent out-of-block elements. Power limits are provided separately for non-AAS and AAS. For non-AAS, the power limits apply to the mean EIRP. For AAS, the power limits apply to the mean TRP ( 4 ). The mean EIRP or mean TRP are measured by averaging over a time interval and over a measurement frequency bandwidth. In the time domain, the mean EIRP or mean TRP is averaged over the active portions of signal bursts and corresponds to a single power control setting. In the frequency domain, the mean EIRP or mean TRP is determined over the measurement frequency bandwidth as given in Tables 2, 3 and 4 below ( 5 ). In general, and unless stated otherwise, the BEM power limits correspond to the aggregate power radiated by the relevant device including all transmit antennas, except in the case of baseline and transition requirements for non-AAS base stations, which are specified per antenna. Block Edge Mask (BEM) Figure Example of base station BEM elements and power limits Table 1 Definition of BEM elements BEM element Definition In-block Refers to a block for which the BEM is derived. Baseline Spectrum within the FDD downlink frequency band used for WBB ECS, with the exception of block assigned to the operator and the corresponding transitional regions. Transitional region Spectrum within the FDD downlink within 0 to 10 MHz below and 0 to 10 MHz above the block assigned to the operator. The transitional regions do not apply below 2 110 MHz or above 2 170 MHz. Table 2 In-block power limits for non-AAS and AAS base stations BEM element Frequency range Non-AAS EIRP limit AAS TRP limit In-block Block assigned to the operator Not obligatory. In case an upper bound is set by a Member State, a value of 65 dBm/(5 MHz) per antenna may be applied. Not obligatory. In case an upper bound is set by a Member State, a value of 57 dBm/(5 MHz) per cell  ( 1 ) may be applied. ( 1 )    In a multi-sector base station, the AAS radiated power limit applies to each one of the individual sectors. Explanatory note to Table 2: The corresponding in-block TRP limit is determined following guidelines given in ETSI TS 138 104 V15.6.0, Annex F, sections F.2 and F.3, on the basis of an antenna gain of 17 dBi and a total of eight beam forming antenna elements (scaling factor of 9 dB): 65 dBm/(5 MHz) – 17 dBi + 9 dB = 57 dBm/(5 MHz). Table 3 Baseline out-of-block power limits for non-AAS and AAS base stations BEM element Frequency range within FDD downlink Non-AAS mean EIRP limit per antenna  ( 1 ) AAS mean TRP limit per cell  ( 2 ) Measurement bandwidth Baseline Frequencies spaced more than 10 MHz from the lower or upper block edge 9 dBm 1 dBm 5 MHz ( 1 )    The non-AAS BEM level is defined per antenna and applicable to base station configuration with up to four antennas per sector. ( 2 )    In a multi-sector base station, the AAS radiated power limit applies to each one of the individual sectors. Table 4 Transitional region out-of-block power limits for non-AAS and AAS base stations BEM element Frequency range within FDD downlink Non-AAS mean EIRP limit per antenna  ( 1 ) AAS mean TRP limit per cell  ( 2 ) Measurement bandwidth Transitional region – 10 to – 5 MHz from lower block edge 11 dBm 3 dBm 5 MHz – 5 to 0 MHz from lower block edge 16,3 dBm 8 dBm 5 MHz 0 to + 5 MHz from upper block edge 16,3 dBm 8 dBm 5 MHz + 5 to + 10 MHz from upper block edge 11 dBm 3 dBm 5 MHz ( 1 )    The non-AAS BEM level is defined per antenna and applicable to base station configuration with up to four antennas per sector ( 2 )    In a multi-sector base station, the AAS radiated power limit applies to each one of the individual sectors. Explanatory note to Tables 3 and 4: In alignment with the standardisation of unwanted emission conducted power (TRP) for AAS base stations in ETSI TS 138 104 (V15.6.0), Annex F, sections F.2 and F.3, the out-of-block TRP limits are set to a value that corresponds to a total of eight beam forming antenna elements, resulting in 8 dB difference between AAS and non-AAS as for the in-block case. D.    TECHNICAL CONDITIONS FOR TERMINAL STATIONS Table 5 Terminal station BEM in-block power limit Maximum mean in-block power  ( 1 ) 24 dBm ( 1 )    This power limit is specified as EIRP for terminal stations designed to be fixed or installed and as TRP for terminal stations designed to be mobile or nomadic. EIRP and TRP are equivalent for isotropic antennas. It is recognised that this value may be subject to a tolerance defined in the harmonised standards to take account of operation under extreme environmental conditions and production spread. Explanatory note to Table 5: Member States may relax this limit for specific deployments, e.g. fixed terminal stations in rural areas provided that protection of other services, networks and applications is not compromised and cross-border obligations are fulfilled.

Other acts of the same type
Council Decision (EU) 2016/367 of 4 March 2016 on the conclusion of the Cooperation Agreement on Satellite Navigation between the European Union and its Member States and the Kingdom of NorwayCouncil Decision (EU) 2016/859 of 4 March 2016 on the signing, on behalf of the European Union and its Member States, and provisional application of a Protocol to the Euro-Mediterranean Agreement establishing an Association between the European Community and its Member States, of the one part, and the Republic of Lebanon, of the other part to take account of the accession of the Republic of Croatia to the European UnionCommission Implementing Decision (EU) 2016/320 of 3 March 2016 amending Decision 2004/842/EC concerning implementing rules whereby Member States may authorise the placing on the market of seed belonging to varieties for which an application for entry in the national catalogues of varieties of agricultural plant species or vegetable species has been submitted (notified under document C(2016) 1221) (Text with EEA relevance)Commission Implementing Decision (EU) 2016/321 of 3 March 2016 adjusting the geographical scope of the authorisation for cultivation of genetically modified maize (Zea mays L.) MON 810 (MON-ØØ81Ø-6) (notified under document C(2016) 1231) (Text with EEA relevance)Commission Implementing Decision (EU) 2016/299 of 2 March 2016 terminating the anti-dumping proceedings concerning imports of silico-manganese originating in IndiaCouncil Decision (EU) 2016/298 of 29 February 2016 on the position to be adopted by the European Union within the ACP-EU Committee of Ambassadors regarding approval of derogations to the Financial Regulation of the Centre for the Development of the Enterprise (CDE)Commission Implementing Decision (EU) 2016/281 of 26 February 2016 determining the date from which the Visa Information System (VIS) is to start operations at external border crossing pointsCommission Decision of 25 February 2016 setting up a Scientific, Technical and Economic Committee for FisheriesCouncil Decision (CFSP) 2016/280 of 25 February 2016 amending Decision 2012/642/CFSP concerning restrictive measures against BelarusCouncil Decision (EU) 2016/350 of 25 February 2016 on the conclusion of the Arrangement between the European Union and the Swiss Confederation on the modalities of its participation in the European Asylum Support OfficeCommission Decision (EU) 2016/255 of 23 February 2016 amending the Annex to the Monetary Agreement between the European Union and the Vatican City StateCouncil Decision (CFSP) 2016/207 of 15 February 2016 amending Decision 2013/233/CFSP on the European Union Integrated Border Management Assistance Mission in Libya (EUBAM Libya)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next