Member States shall use the formats set out in Annexes I and II to this Decision to notify the Commission of the information on the adoption and substantial revisions of the waste management plans and waste prevention programmes referred to in Articles 28 and 29 of Directive 2008/98/EC.
This Decision is addressed to the Member States.
ANNEX ISupplementary provisions
ANNEX I
FORMAT FOR NOTIFYING THE INFORMATION ON THE ADOPTION AND SUBSTANTIAL REVISIONS OF THE WASTE MANAGEMENT PLANS
Name of the plan:
…
Administrative body (name, address, e-mail address, and other contact details where necessary) responsible for adoption/revision of the plan:
…
Electronic link to a publicly available website for the plan:
…
Administrative body (name, address, e-mail address, and other contact details where necessary) in charge of coordinating the information provided in this form:
…
Please tick the applicable box:
Adoption of a new waste management plan
Substantial revision of a waste management plan
(Important: Please indicate the relevant page number(s) of the notified plan and/or reference document related to each question)
1. General Information
1.1.
Date of adoption/revision (month/year):
1.2.
Does the plan cover the entire territory of the Member State?
Yes
No
If no, please indicate what parts of the territory are not covered and provide reasons:
…
1.3.
What is the scope of the waste management plan?
All waste streams
Municipal solid waste
Hazardous waste
Specific waste streams. Please specify:
If the plan does not cover all waste streams, please indicate the relevant additional plans:
…
1.4.
Does the plan comply with the requirements of Directive 2008/98/EC?
Yes
No
If no, please indicate the reasons:
…
1.5.
Is the plan designed in accordance with the waste hierarchy set out in Article 4 of Directive 2008/98/EC?
Yes
No
If no, please specify for which waste streams the plan deviates from the waste hierarchy and the reasons for such deviations:
…
1.6.
Does the plan include any waste prevention programme?
Yes
No
If yes, please provide the relevant website links:
…
1.7.
How did the relevant stakeholders and authorities and the general public participate in the elaboration of the waste management plans and waste prevention programmes?
…
2. Information on collection schemes and waste treatment installations
2.1.
Does the plan assess the need for new collection schemes and major disposal/recovery installation and related investments?
Yes
No
2.2.
Does the plan provide information about the location of planned disposal or major recovery installations and the criteria for the choice of that location?
Yes
No
If yes, please indicate where these criteria are set out in the plan:
…
3. Information on waste-related targets
3.1.
Are packaging and packaging waste covered by the plan (Article 14 of European Parliament and Council Directive 94/62/EC ( 1 ) )
Yes
No
3.2.
Does the plan set out strategies or measures for the implementation of the reduction of biodegradable waste going to landfills (Article 5 of Council Directive 1999/31/EC ( 2 ) )
Yes
No
3.3.
Does the plan contribute to reach the landfill biodegradable diversion targets?
Yes
No
3.4.
Does the plan evaluate the usefulness and suitability of economic and other instruments, e. g. landfill taxes, in addressing waste issues?
Yes
No
If yes, please specify which economic instruments and related measures have been included in the plan:
…
( 1 )
OJ L 365, 31.12.1994, p. 10 .
( 2 )
OJ L 182, 16.7.1999, p. 1 .
ANNEX IISupplementary provisions
ANNEX II
FORMAT FOR NOTIFYING THE INFORMATION ON THE ADOPTION AND SUBSTANTIAL REVISIONS OF THE WASTE PREVENTION PROGRAMMES
Name of the programme:
…
Electronic link to a publicly available website for this programme:
…
Administrative body (name, address, e-mail address and other contact details where necessary) responsible for the adoption/revision of the programme:
…
Administrative body (name, address, e-mail address, and other contact details where necessary) in charge of coordinating these answers:
…
Please tick the applicable box:
Adoption of a new waste prevention programme
Substantial revision of a waste prevention programme ( 1 )
In case of a notification of a substantial revision of a waste prevention programme, which plan/programme does this revision refer to?
Please describe briefly the scope and the main elements of the revision, indicating where the revised elements can be found within the waste prevention programme:
…
(Important: Please indicate the relevant page number(s) of the notified programme and/or reference document related to each question)
1. General information
1.1.
Date of adoption/revision (month/year):
1.2.
Does the programme cover the entire territory of your Member State?
Yes
No
If no, please indicate what parts of the territory are not covered and provide reasons:
…
1.3.
Is the programme integrated into a waste management plan?
Yes
No
If yes, please specify the waste management plan(s):
…
1.4.
Is the programme included in other environmental policy programme(s)?
Yes
No
If yes, please specify the programme(s):
…
2. Information on waste prevention
2.1.
Does the programme describe the existing prevention measures?
Yes
No
2.2.
Does the programme set out waste prevention objectives?
Yes
No
2.3.
To what extent do the objectives and measures aim at the decoupling of economic growth from the environmental impacts of waste generation?
…
2.4.
Does the programme specify quantitative and/or qualitative benchmarks for adopted waste prevention measures?
Yes
No
If yes, please indicate whether they are qualitative and/or quantitative and the relevant page number(s):
…
2.5.
Does the programme determine specific qualitative and/or quantitative targets and indicators?
Yes
No
If yes, please indicate whether they are qualitative and/or quantitative and the relevant page number(s):
…
( 1 ) Only applicable if a waste prevention programme has already been notified to the European Commission.