2013/799/EU: Commission Decision of 17 December 2013 on the notification by the Kingdom of Spain of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2013) 9089)

2013/799/EU: Commission Decision of 17 December 2013 on the notification by the Kingdom of Spain of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2013) 9089)

Directive 2010/75/EU · Decision · 4 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

1.   The transitional national plan which the Kingdom of Spain notified to the Commission pursuant to Article 32(5) of Directive 2010/75/EU on 14 December 2012, which includes the large combustion plants listed in Annex I to this decision, is not in accordance with the requirements laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU, and shall, therefore, not be accepted. 2.   If the Kingdom of Spain intends to implement a transitional national plan pursuant to Article 32(5), it shall take all necessary measures to address, in a revised version of the plan, the following elements: (a) for plant 2, to correct the emission limit value applied for calculating its contribution to the SO 2 ceiling for 2016; the plant is not eligible for using the emission limit value of 800 mg/Nm 3 for SO 2 for calculating its contribution to the 2016 TNP ceiling on the basis of Article 5(2) of Directive 2001/80/EC, as that emission limit value is not referred to in the second subparagraph of Article 32(3) of Directive 2010/75/EU; (b) for plant 5, to correct the method applied for calculating its contribution to the 2016 TNP ceiling for SO 2 ; that contribution shall be calculated for the entire period 2001-2010 either on the basis of the minimum desulphurisation rate, or on the basis of the emission limit values; (c) for plants 13, 15, 17, 18, 24 and 25: to correct the emission limit values applied for calculating their contribution to the NO x ceiling for 2016; in order for the plants to be eligible for using the emission limit value of 1 200 mg/Nm 3 , the Kingdom of Spain shall demonstrate that the average annual volatile content of the solid fuel used in the plants was below 10 % in the reference years considered for the TNP; (d) to correctly update the total emission ceilings for all years calculated in accordance with the corrected values mentioned in the previous points; (e) to clarify all issues and complement the data as mentioned in Annex II to this decision.

Supplementary provisions

ANNEX ISupplementary provisions

Open ↗

ANNEX I LIST OF PLANTS INCLUDED IN THE TNP Number Plant name in the TNP Total rated thermal input on 31.12.2010 (MW) 1 C.T. Litoral I 1 222 2 C.T. Litoral II 1 268 3 C.T. Compostilla I (G2 and 3) 1 332 4 C.T. Compostilla I (G4 and 5) 1 960 5 C.T. As Pontes 3 800 6 C.T. Teruel (Andorra) 3 000 7 C.T. Besós 3 (CTCC) 722 8 C.T. San Roque (G2) (CTCC) 711 9 C.T. Foix 1 315 10 C.T. Los Barrios 1 645 11 C.T. Puentenuevo 976 12 C.T. Tarragona I (CTCC) 676 13 C.T. Anllares 953 14 C.T. La Robla I 691 15 C.T. La Robla II 951 16 C.T. Meirama 1 437 17 C.T. Narcea I 193 18 C.T. Narcea II 459 19 C.T. Narcea III 993 20 C.T. Aboño I 919 21 C.T. Aboño II 1 364 22 C.T. Soto III 830 23 C.T. de Lada 4 986 24 C.T. de Velilla 1 430 25 C.T. de Velilla 2 1 010 26 Central GICC Puertollano 670 27 San Ciprián I 147 28 San Ciprián II 147 29 San Ciprián IIII 147 30 Cogecan 93 31 Sniace Co-generation I 126 32 Sniace Co-generation II 126 33 Solal 146 34 Solvay I 376

ANNEX IISupplementary provisions

Open ↗

ANNEX II LIST OF DATA REFERRED TO IN POINT (E) OF ARTICLE 1(2) 1. For plant 6 which uses a desulphurisation rate of 92 % in 2016: clarification shall be provided if conditions for application of this value as set in table C3 to Appendix C of the Annex to Implementing Decision 2012/115/EU are met (a contract for fitting a flue gas desulphurisation or a lime injection equipment has entered into effect, and work on its installation has commenced, before 1 January 2001). 2. For plants 1, 2, 3, 4, 6, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 25, 30 and 34: clarification shall be provided on how the contributions from those plants were calculated to the total TNP ceilings. 3. For plant 34: data on the waste gas flow rates for each fuel fired in this plant shall be provided separately.

Other acts of the same type
Political and Security Committee Decision (CFSP) 2025/1299 of 24 June 2025 extending the mandate of the Head of Mission of the European Union Border Assistance Mission for the Rafah Crossing Point (EU BAM Rafah) (EU BAM Rafah/1/2025)Political and Security Committee Decision (CFSP) 2025/1306 of 24 June 2025 extending the mandate of the Head of Mission of the European Union Police Mission for the Palestinian Territories (EUPOL COPPS) (EUPOL COPPS/1/2025)Council Decision (EU) 2025/1312 of 24 June 2025 appointing an alternate member, proposed by the Kingdom of the Netherlands, of the Committee of the RegionsCommission Decision of 23 June 2025 designating the Central Administrator of the Union RegistryCommission Implementing Decision (EU) 2025/1211 of 23 June 2025 amending Implementing Decision (EU) 2023/1054 as regards governmental services of GOVSATCOMCouncil Decision (CFSP) 2025/1255 of 23 June 2025 amending Decision (CFSP) 2020/1999 concerning restrictive measures against serious human rights violations and abusesCouncil Decision (EU) 2025/1258 of 23 June 2025 on the position to be taken on behalf of the European Union within the Joint Committee established by the Framework Agreement on Comprehensive Partnership and Cooperation between the European Union and its Member States, of the one part, and the Kingdom of Thailand, of the other part, as regards the adoption of the Rules of Procedure of the Joint Committee, the establishment of specialised working groups and the adoption of their terms of referenceCouncil Decision (EU) 2025/1308 of 23 June 2025 on the position to be taken on behalf of the European Union within the World Customs Organization (WCO) Council in relation to a WCO Article 16 Recommendation amending the Harmonised SystemCouncil Decision (EU) 2025/1314 of 23 June 2025 on the submission, on behalf of the European Union, of proposals for amendments to the appendices to the Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) and on the position to be taken on behalf of the European Union at the 20th meeting of the Conference of the Parties to that ConventionCommission Implementing Decision (EU) 2025/1261 of 20 June 2025 amending Implementing Decision (EU) 2025/1160 concerning certain emergency measures relating to sheep pox and goat pox in Bulgaria (notified under document C(2025) 4073)Council Decision (EU) 2025/1273 of 20 June 2025 on the position to be taken on behalf of the European Union in the 196th session of the World Forum for Harmonization of Vehicle Regulations of the United Nations Economic Commission for EuropeCouncil Decision (EU) 2025/1285 of 20 June 2025 on the position to be taken on behalf of the European Union within the International Maritime Organization’s Maritime Safety Committee at its 110th session as regards the adoption of amendments to the International Convention for the Safety of Life at Sea (SOLAS), 1974, the 1994 International Code of Safety for High-Speed Craft (1994 HSC Code) and the 2000 International Code of Safety for High-Speed Craft (2000 HSC Code)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next