LawPlayer
My bookmarksSign up freeSign up free
Source

2013/799/EU: Commission Decision of 17 December 2013 on the notification by the Kingdom of Spain of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2013) 9089)

2013/799/EU: Commission Decision of 17 December 2013 on the notification by the Kingdom of Spain of a transitional national plan referred to in Article 32 of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions (notified under document C(2013) 9089)

Directive 2010/75/EU · Decision · 4 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

1.   The transitional national plan which the Kingdom of Spain notified to the Commission pursuant to Article 32(5) of Directive 2010/75/EU on 14 December 2012, which includes the large combustion plants listed in Annex I to this decision, is not in accordance with the requirements laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU, and shall, therefore, not be accepted. 2.   If the Kingdom of Spain intends to implement a transitional national plan pursuant to Article 32(5), it shall take all necessary measures to address, in a revised version of the plan, the following elements: (a) for plant 2, to correct the emission limit value applied for calculating its contribution to the SO 2 ceiling for 2016; the plant is not eligible for using the emission limit value of 800 mg/Nm 3 for SO 2 for calculating its contribution to the 2016 TNP ceiling on the basis of Article 5(2) of Directive 2001/80/EC, as that emission limit value is not referred to in the second subparagraph of Article 32(3) of Directive 2010/75/EU; (b) for plant 5, to correct the method applied for calculating its contribution to the 2016 TNP ceiling for SO 2 ; that contribution shall be calculated for the entire period 2001-2010 either on the basis of the minimum desulphurisation rate, or on the basis of the emission limit values; (c) for plants 13, 15, 17, 18, 24 and 25: to correct the emission limit values applied for calculating their contribution to the NO x ceiling for 2016; in order for the plants to be eligible for using the emission limit value of 1 200 mg/Nm 3 , the Kingdom of Spain shall demonstrate that the average annual volatile content of the solid fuel used in the plants was below 10 % in the reference years considered for the TNP; (d) to correctly update the total emission ceilings for all years calculated in accordance with the corrected values mentioned in the previous points; (e) to clarify all issues and complement the data as mentioned in Annex II to this decision.

Supplementary provisions

ANNEX ISupplementary provisions

Open ↗

ANNEX I LIST OF PLANTS INCLUDED IN THE TNP Number Plant name in the TNP Total rated thermal input on 31.12.2010 (MW) 1 C.T. Litoral I 1 222 2 C.T. Litoral II 1 268 3 C.T. Compostilla I (G2 and 3) 1 332 4 C.T. Compostilla I (G4 and 5) 1 960 5 C.T. As Pontes 3 800 6 C.T. Teruel (Andorra) 3 000 7 C.T. Besós 3 (CTCC) 722 8 C.T. San Roque (G2) (CTCC) 711 9 C.T. Foix 1 315 10 C.T. Los Barrios 1 645 11 C.T. Puentenuevo 976 12 C.T. Tarragona I (CTCC) 676 13 C.T. Anllares 953 14 C.T. La Robla I 691 15 C.T. La Robla II 951 16 C.T. Meirama 1 437 17 C.T. Narcea I 193 18 C.T. Narcea II 459 19 C.T. Narcea III 993 20 C.T. Aboño I 919 21 C.T. Aboño II 1 364 22 C.T. Soto III 830 23 C.T. de Lada 4 986 24 C.T. de Velilla 1 430 25 C.T. de Velilla 2 1 010 26 Central GICC Puertollano 670 27 San Ciprián I 147 28 San Ciprián II 147 29 San Ciprián IIII 147 30 Cogecan 93 31 Sniace Co-generation I 126 32 Sniace Co-generation II 126 33 Solal 146 34 Solvay I 376

ANNEX IISupplementary provisions

Open ↗

ANNEX II LIST OF DATA REFERRED TO IN POINT (E) OF ARTICLE 1(2) 1. For plant 6 which uses a desulphurisation rate of 92 % in 2016: clarification shall be provided if conditions for application of this value as set in table C3 to Appendix C of the Annex to Implementing Decision 2012/115/EU are met (a contract for fitting a flue gas desulphurisation or a lime injection equipment has entered into effect, and work on its installation has commenced, before 1 January 2001). 2. For plants 1, 2, 3, 4, 6, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 25, 30 and 34: clarification shall be provided on how the contributions from those plants were calculated to the total TNP ceilings. 3. For plant 34: data on the waste gas flow rates for each fuel fired in this plant shall be provided separately.

Other acts of the same type
Council Decision (CFSP) 2025/1495 of 18 July 2025 amending Decision 2014/512/CFSP concerning restrictive measures in view of Russia’s actions destabilising the situation in UkraineCouncil Decision (CFSP) 2025/1497 of 18 July 2025 amending Decision (CFSP) 2017/1775 concerning restrictive measures in view of the situation in MaliCouncil Decision (CFSP) 2025/1498 of 18 July 2025 amending Joint Action 2008/851/CFSP on a European Union military operation to contribute to maritime security in the West Indian Ocean and in the Red Sea (EUNAVFOR ATALANTA)Council Decision (CFSP) 2025/1499 of 18 July 2025 on an assistance measure under the European Peace Facility to support the Togolese Armed ForcesCouncil Decision (EU) 2025/1540 of 18 July 2025 amending Decision 2013/488/EU on the security rules for protecting EU classified informationCouncil Decision (EU) 2025/1541 of 18 July 2025 on the signing, on behalf of the European Union, of the Agreement between the European Union, of the one part, and the Republic of Ecuador, of the other part, on cooperation between the European Union Agency for Law Enforcement Cooperation (Europol) and the Ecuadorian authorities competent for combating serious crime and terrorismCouncil Decision (EU) 2025/1579 of 18 July 2025 authorising the opening of negotiations with the Republic of Kazakhstan for an agreement on readmissionCouncil Decision (EU) 2025/1580 of 18 July 2025 amending Decision 1999/70/EC concerning the external auditors of the national central banks, as regards the external auditors of the Deutsche BundesbankCouncil Decision (EU) 2025/2446 of 18 July 2025 authorising the opening of negotiations on the revision of the Treaty establishing the Transport CommunityCommission Implementing Decision (EU) 2025/1464 of 17 July 2025 on the harmonised standard EN 60335-2-14:2006 on particular requirements for kitchen machines drafted in support of Directive 2014/35/EU of the European Parliament and the CouncilCommission Decision of 16 July 2025 on the approval of guidelines on the closure of the rural development programmes of the Member States adopted for assistance from the European Agricultural Fund for Rural Development (EAFRD) for the period 2014-2022Commission Implementing Decision (EU) 2025/1405 of 16 July 2025 amending Implementing Decision (EU) 2020/2126 as regards the total quantities of cancelled EU ETS allowances that may be taken into account for certain Member States’ compliance under Regulation (EU) 2018/842 of the European Parliament and of the Council

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next