ANNEX IISupplementary provisions
ANNEX II LIST OF DATA REFERRED TO IN POINT (E) OF ARTICLE 1(2) 1. For plant 6 which uses a desulphurisation rate of 92 % in 2016: clarification shall be provided if conditions for application of this value as set in table C3 to Appendix C of the Annex to Implementing Decision 2012/115/EU are met (a contract for fitting a flue gas desulphurisation or a lime injection equipment has entered into effect, and work on its installation has commenced, before 1 January 2001). 2. For plants 1, 2, 3, 4, 6, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 25, 30 and 34: clarification shall be provided on how the contributions from those plants were calculated to the total TNP ceilings. 3. For plant 34: data on the waste gas flow rates for each fuel fired in this plant shall be provided separately.