Commission Implementing Regulation (EU) No 409/2013 CHAPTER II — COMMON PROJECTS

Article 4–Article 6 · 3 articles

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Purpose and content

Article 4

1.   Common projects shall aim to deploy in a timely, coordinated and synchronised way ATM functionalities that will achieve the essential operational changes. 2.   Common projects shall be consistent with and contribute to the European Union-wide performance targets. 3.   Common projects shall identify the ATM functionalities that: (a) having reached the appropriate level of industrialisation, are mature for implementation; (b) require synchronised deployment. 4.   The maturity of ATM functionalities shall be demonstrated, inter alia, on the basis of the results of validation carried out by the SESAR Joint Undertaking, the status of standardisation and certification processes and an assessment of their interoperability, also in relation to the ICAO Global Air Navigation Plan and relevant ICAO material. 5.   The need for synchronised deployment of ATM functionalities shall be assessed on the basis of: (a) a definition of their geographical scope and planning, including deployment target dates; (b) an identification of the operational stakeholders required to deploy them; (c) transitional measures for their progressive deployment. 6.   Common projects shall also: (a) demonstrate a positive business case for the EATMN, based on an independent cost-benefit analysis, and identify any potential local or regional negative impact for any specific category of operational stakeholders; (b) identify incentives for deployment, referred to in Section 3 of Chapter III, in particular to mitigate negative impacts on a specific geographical area or category of operational stakeholders; (c) refer to the implementing rules for interoperability and safety under Regulation (EC) No 552/2004 of the European Parliament and of the Council  ( 8 ) and Regulation (EC) No 216/2008 of the European Parliament and of the Council  ( 9 ) . In particular, reference shall be made to Community specifications under Regulation (EC) No 552/2004 and to acceptable means of compliance and certification specifications under Regulation (EC) No 216/2008; (d) identify any need for new implementing rules for interoperability and safety, Community specifications and civil standards to support their deployment and their applicability to the military taking into consideration civil and military systems’ equivalence; and (e) take account of the relevant deployment elements specified in the Network Strategy Plan and the Network Operations Plan of the Network Manager.

Setup, adoption and implementation

Article 5

1.   The Commission shall set up proposals for common projects in accordance with the requirements of Article 4. 2.   The Commission shall be assisted by the Network Manager, the European Aviation Safety Agency, the Performance Review Body within their respective roles and competencies as defined in the SES regulatory framework, and by the SESAR Joint undertaking, Eurocontrol, the European standardisation organisations, Eurocae and the deployment manager. These bodies shall involve the operational stakeholders and manufacturing industry. 3.   The Commission shall consult the stakeholders in accordance with Articles 6 and 10 of Regulation (EC) No 549/2004 including through the European Defence Agency, within its remit to facilitate the coordination of military views, and the consultative group of experts on the social dimension of the single European sky on its proposals for common projects. 4.   The Commission shall ensure that proposals for common projects are endorsed by the airspace users and the ground operational stakeholders that are required to implement a specific common project. To this end, airspace users shall set up a group made up of representatives of airspace users. 5.   The Commission shall adopt common projects and any amendments to them in accordance with the procedure referred to in Article 15a(3) of Regulation (EC) No 550/2004. 6.   Common projects shall be implemented through implementation projects and in accordance with the deployment programme defined in Chapter III, Section 2.

Monitoring

Article 6

1.   The Commission shall monitor the implementation of common projects and their impact on the performance of the EATMN through specific reporting requirements. Those requirements shall be set out by the Commission under the framework partnership referred to in Article 9(5). 2.   In monitoring the effectiveness of common projects with regard to performance of the EATMN, the Commission shall make best use of existing monitoring and reporting instruments and shall be assisted, in particular, by the Network Manager and the Performance Review Body in accordance with Regulations (EU) No 677/2011 and (EU) No 691/2010 and by the European Aviation Safety Agency regarding the safety aspects. 3.   The Single Sky Committee shall be informed on the implementation of common projects.

Back to Commission Implementing Regulation (EU) No 409/2013 — full text