The formats for reporting on the national programmes for the implementation of Directive 91/271/EEC provided for in the Annex are adopted.
資料由法律人 LawPlayer整理提供·EU law / curated by LawPlayer from EUR-Lex
2014/431/EU: Commission Implementing Decision of 26 June 2014 concerning formats for reporting on the national programmes for the implementation of Council Directive 91/271/EEC (notified under document C(2014) 4208)
Decision 93/481/EEC is repealed.
This Decision is addressed to the Member States.
Schedules & Appendices
ANNEX
PROGRAMME FOR THE IMPLEMENTATION OF THE DIRECTIVE 91/271/EEC
Table 1
Basic Information
Member State:
Date of reporting:
Reference date used for identification of non-compliance or pending deadlines (Tables 2 and 3):
Name of the Contact Person for reporting ( 1 ) :
Institution:
Street:
Post Code:
City:
Phone:
Email:
Any other remark:
Member State:
Table 2
A —
Collecting systems or IAS ( 2 ) of agglomerations of 2 000 p.e. and larger than 2 000 p.e. not compliant at the reference date
Basic Data on the Agglomeration
Article 3 collecting systems and IAS measure(s)
ID of the agglomeration ( 3 )
Name of the agglomeration
Status of the agglomeration
Identified reason(s) for non compliance
Measure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS)
Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, consents as required at MS level, etc.) ( 4 )
Start date or expected start date for works on the collecting systems or IAS
Expected date of completion of the collecting system or IAS works
Forecast investment cost for the collecting system or IAS (as in the national plan)
Name of EU fund planned to be used to complete the collecting system or IAS (if any) ( 5 )
Amount of (planned) EU funds likely to be requested to complete the collecting system or IAS (if any)
Any relevant comment on collecting system or IAS
Not compliant (NC)
(mm/yyyy)
(mm/yyyy )
(mm/yyyy )
EUR
EUR
NC
NC
B — Collecting systems or IAS of agglomerations of 2 000 p.e. and larger than 2 000 p.e. for which pending deadlines existed ( 6 ) at the reference date
Basic Data on the Agglomeration
Article 3 collecting systems or IAS measure(s)
ID of the agglomeration ( 7 )
Name of the agglomeration
Status of the agglomeration
Measure(s) foreseen to reach compliance with Article 3 (collecting systems and IAS)
Date or expected date for completion of preparatory measures for the collecting system or IAS (planning, design, procurement, consents as required at MS level, etc.) ( 8 )
Start date or expected start date for works on the collecting systems or IAS
Expected date of completion of the collecting system or IAS works
Forecast investment cost for the collecting system or IAS (as in the national plan)
Name of EU fund planned to be used to complete the collecting system or IAS (if any) ( 9 )
Amount of (planned) EU funds likely to be requested to complete the collecting system or IAS (if any)
Any relevant comment on collecting system or IAS
Pending Deadlines (PD)
(mm/yyyy)
(mm/yyyy )
(mm/yyyy )
EUR
EUR
PD
PD
Member State:
Table 3
A —
Urban waste water treatment plants (UWWTP) of agglomerations of 2 000 p.e. and larger than 2 000 p.e. not compliant at the reference date ( 10 )
Basic Data on the UWWTP
UWWTPs Articles 4, 5 and 7 ( 11 ) measure(s)
ID of the UWWTP ( 12 )
Name of the UWWTP
ID(s) of the agglomeration(s) served
Name(s) of the agglomeration(s) served
Status of the UWWTP
Identified reason(s) for non-compliance
Measure(s) to reach compliance needed for UWWTP
Load entering the UWWTP at the expected date of compliance (as planned)
Organic design capacity UWWTP (as planned)
Type of treatment UWWTP (as planned)
Date or expected date of completion of preparatory measures (planning, design, etc.) ( 13 )
Date or expected start date for works
Date or expected date of completion of works
Expected date of compliance (12 months of samples)
Forecast cost investment needed for the UWWTP (as in the national plan)
Name of EU fund planned to be used (if any) ( 14 )
Amount of (planned) EU funding needed
Any relevant comment on UWWTP
Not compliant (NC)
E.g. inadequate design/obsolescence/new requirements/ increase of the load/faulty operation/..
p.e.
p.e.
1, 2, 3-N, 3-P, 3-microbiology, 3-other
(mm/yyyy )
(mm/yyyy )
(mm/yyyy )
(mm/yyyy )
EUR
EUR
NC
NC
B — Urban waste water treatment plants of agglomerations of 2 000 p.e. and larger than 2 000 p.e. for which pending deadlines existed ( 15 ) at the reference date ( 16 )
Basic Data on the UWWTP
UWWTPs article 4, 5 and 7 measure(s)
ID of the UWWTP ( 17 )
Name of the UWWTP
ID(s) of the agglomeration(s) served
Name(s) of the agglomeration(s) served
Status of the UWWTP
Measure(s) to reach compliance needed for UWWTP
Load entering the UWWTP at the expected date of compliance (as planned)
Organic design capacity UWWTP (as planned)
Type of treatment UWWTP (as planned)
Date of expected date of completion of preparatory measures (planning, design, etc.) ( 18 )
Date or expected start date for works
Date or expected date of completion of works
Expected date of compliance (12 months of samples)
Forecast cost investment needed for the UWWTP (as in the national plan)
Name of EU fund planned to be used UWWTP (if any) ( 19 )
Amount of (planned) EU funding needed
Any relevant comment on UWWTP
Pending Deadlines (PD)
p.e.
p.e.
1, 2, 3-N, 3-P, 3-microbiology, 3-other
(mm/yyyy )
(mm/yyyy )
(mm/yyyy )
(mm/yyyy )
EUR
EUR
PD
PD
Member State:
Table 4
Current and expected total organic design capacity and investment costs at national level
Period covered
Current and expected situation
Current or expected total organic design capacity of all UWWTPs at the end of the period
Current or expected investment costs of the collecting systems (new and renewal)
Current or expected investment costs of the treatment plants (new and renewal)
Current/Expected
p.e.
million EUR ( 21 )
million EUR ( 21 )
from 1 January xxxx to end xxxx ( 20 )
Current
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
from 1 January xxxx to end xxxx
Expected
Member State:
Table 5
Other issues to be considered for drafting the national programme
Relevant information, if any, should be provided as free text ( 22 )
Topic
Presence in the programme
Status of the National Programme
When was the NP established and when was, if necessary, the last update?
Has the NP been adopted as a legally binding instrument? If affirmative, which one?
How long the NP is intended to run for?
…
Main drivers
What are the main drivers in the NP: reaching compliance, ensuring maintenance and renewal, etc?
Is it possible to have a break down of the associated costs for each?
…
Relations with other pieces of EU legislation
To what extent have the actions in the NP been included in the relevant River Basin Management Plans under Directive 2000/60/EC of the European Parliament and of the Council ( 23 ) ?
Notwithstanding sensitive areas designated under Directive 91/271/EEC, does the NP include actions triggered by the protected areas referred to by Annex IV to Directive 2000/60/EC (bathing waters, Natura 2000, shellfish, drinking water...)? If yes, please describe these actions.
Has the NP been subject to an assessment under Directive 2001/42/EC of the European Parliament and of the Council ( 24 ) ? If yes, please give details.
Does the NP have links with progressive reduction of discharges, emissions and losses of priority substances and the cessation or phasing-out of discharges, emissions and losses of the priority hazardous substances (Article 4 of Directive 2000/60/EC)? If yes, describe the actions.
Does the NP have links with Directive 2008/56/EC of the European Parliament and of the Council ( 25 ) (e.g. decrease of marine litter) ? If yes, please give details.
Does the NP have links with International Conventions or Commissions ? If yes, please describe the links.
Is there any action foreseen to design additional sensitive areas under Annex II.A(c) to Directive 91/271/EEC? If yes, describe these actions?
Is there any action foreseen to apply more stringent treatment to comply with Article 4.3 or 5.3 and Annex I.B.4 to Directive 91/271/EEC? If yes, please give details?
...
Use of EU funds
What is the forecast amount of EU Funds for the implementation of the actions in the NP?
what is the breakdown of EU funds used?
...
Information systems
Is the NP published online? Where?
Is there any system online allowing for the tracking of the implementation of the NP on a regular basis? Please give details.
…
Other requirements of Directive 91/271/EEC
Is any action considered necessary to ensure sufficient performance of UWWTP under all normal climatic conditions (Article 10 and Annex I.B) ?
Is any action foreseen to reduce storm water overflows (Article 3.2 and Annex I.A)?
Is any action foreseen to implement Article 7?
Is any action foreseen to promote the reuse of treated wastewater (Article 12.1)?
Is any action foreseen to implement Article 14 regarding sludge management?
Is any action foreseen to reduce industrial waste water discharges to collecting systems to ensure compliance with the requirements of Annex I.C?
...
Other
Give details of any ongoing or planned research with regard to innovative developments in sanitation policy.
Are there any EU funds used in this respect?
( 1 ) Personal data (name, phone, etc.) will be registered according to Article 2(b) of the Regulation (EC) No 45/2001 of the European Parliament and of the Council ( OJ L 8, 12.1.2001, p. 1 ).
( 2 ) Individual systems or Appropriate Systems (Article 3.1 of the Directive).
( 3 ) Same ID of the agglomeration used for reporting under Article 15(4).
( 4 ) Only necessary if the construction of the collecting system or IAS has not started at the reference date.
( 5 ) E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …
( 6 ) Including those deadlines set by the Accession Treaties
( 7 ) Same ID of the agglomeration used for reporting under Article 15(4).
( 8 ) Only necessary if the construction of the collecting system or IAS has not started at the reference date.
( 9 ) E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …
( 10 ) Information on individual plant level of agglomerations of more than 10 000 p.e., as regard the lack of nitrogen or phosphorus removal, is not required according to the Directive for sensitive areas where it can be shown that the minimum percentage of reduction of the overall load entering all urban waste water treatment plants in that area is at least 75 % for total phosphorus and at least 75 % for total nitrogen at the reference date.
( 11 ) Article 7 refers only to agglomerations of less than 10 000 p.e. which discharge to coastal waters.
( 12 ) Same ID of the UWWTP used for reporting under Article 15(4).
( 13 ) Only necessary if the construction of the UWWTP has not started at the reference date.
( 14 ) E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …
( 15 ) Including those deadlines set by the Accession Treaties or by the definition of new sensitive areas (Article 5).
( 16 ) Information on individual plant level of agglomerations of more than 10 000 p.e., as regard the lack of nitrogen or phosphorus removal, is not required according to the Directive for sensitive areas where it can be shown that the minimum percentage of reduction of the overall load entering all urban waste water treatment plants in that area is at least 75 % for total phosphorus and at least 75 % for total nitrogen at the reference date.
( 17 ) Same ID of the UWWTP used for reporting under Article 15(4).
( 18 ) Only necessary if the construction of the UWWTP has not started at the reference date.
( 19 ) E.g. European Regional Development Fund (ERDF), Cohesion fund (CF), European Investment Bank (EIB) Loan, European Bank for reconstruction and Development (EBRD) loan, Environmental Protection and Energy Efficiency Fund (EPEEF), European Social Fund (ESF), …
( 20 ) Choose the last known period or year.
( 21 ) Indicate euros in current price giving reference date (in mm/yyyy) and whether VAT included or not.
( 22 ) E.g an existing national programme is considered as a response to Table 5 request.
( 23 ) Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of water policy ( OJ L 327, 22.12.2000, p. 1 ).
( 24 ) Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment ( OJ L 197, 21.7.2001, p. 30 ).
( 25 ) Directive 2008/56/EC of the European Parliament and of the Council of 17 June 2008 establishing a framework for community action in the field of marine environmental policy (Marine Strategy Framework Directive) ( OJ L 164, 25.6.2008, p. 19 ).
Cite this act
2014/431/EU: Commission Implementing Decision of 26 June 2014 concerning formats for reporting on the national programmes for the implementation of Council Directive 91/271/EEC (notified under document C(2014) 4208) (EUR-Lex). Retrieved via LawPlayer, https://lawplayer.com/eu/act/32014D0431
© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.
本頁資料來源:EUR-Lex·整理提供:法律人 LawPlayer· lawplayer.com