My bookmarksSign up free
Source

2014/768/EU: Commission Implementing Decision of 30 October 2014 establishing the type, format and frequency of information to be made available by the Member States on integrated emission management techniques applied in mineral oil and gas refineries, pursuant to Directive 2010/75/EU of the European Parliament and of the Council (notified under document C(2014) 7517) Text with EEA relevance

2014/768/EU: Commission Implementing Decision of 30 October 2014 establishing the type, format and frequency of information to be made available by the Member States on integrated emission management techniques applied in mineral oil and gas refineries, pursuant to Directive 2010/75/EU of the European Parliament and of the Council (notified under document C(2014) 7517) Text with EEA relevance

Directive 2010/75/EU · Decision · 3 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Reporting by Member States

Article 1

Open ↗

1.   Member States shall make available to the Commission the information on the implementation of the integrated emission management techniques set out in BAT 57 and BAT 58 adopted by Implementing Decision 2014/738/EU. The information referred to in the first subparagraph shall be made available in accordance with the Annex and shall cover the years 2017, 2018 and 2019. That information shall be made available for each of the mineral oil and gas refineries where an integrated emission management technique set out in BAT 57 or BAT 58 is implemented for emissions to air of nitrogen oxides (NO x ) or sulphur dioxide (SO 2 ). 2.   The information referred to in paragraph 1 shall be made available to the Commission by 30 September 2020 at the latest using the electronic reporting format provided for that purpose.

Supplementary provisions

Type of information on integrated emission management techniques applied in mineral oil and gas refineries to be made available to the Commission

ANNEXSupplementary provisions

Open ↗

ANNEX Type of information on integrated emission management techniques applied in mineral oil and gas refineries to be made available to the Commission 1.    General information 1.1. Reference number of the installation: unique installation identifier for the purposes of Directive 2010/75/EU. 1.2. Installation name. 1.3. Operator name. 1.4. Installation address: street, postal code, city and country. 2.    Information on the scope of the integrated emission management techniques and the applicable emission limit values 2.1. List and description of combustion and process units covered by the integrated emission management techniques for NO x and SO 2 , in particular: (a) type of unit (combustion unit, fluid catalytic cracking unit, waste gas sulphur recovery unit); (b) rated thermal input (for combustion units); (c) fuel type(s) fired (for combustion units); (d) new or existing unit; (e) substantial and structural changes, e.g. in operation or fuel use, during the reporting period, which affected the applicable BAT-associated emission levels (BAT-AELs). 2.2. Applicable emission limit values for NO x and SO 2 under the integrated emission management techniques, detailing: (a) values, units, averaging periods and reference conditions; (b) how these limit values were determined in relation to BAT 57 and BAT 58 set out in the BAT conclusions under Implementing Decision 2014/738/EU; (c) which emission concentrations were considered for each unit concerned in relation to BAT 57 and BAT 58 and in comparison with the individual BAT-AELs and the BAT-associated environmental performance levels (BAT-AEPL) for waste gas sulphur recovery units; (d) which flue-gas flow rates (or other factors) were used as the weighing factor for each unit and how these were determined; (e) which other elements or factors were used to establish the limit values. 3.    Information on the monitoring system 3.1. Description of the monitoring system used for determining the emissions under the integrated emission management techniques. 3.2. Details on the parameters measured and calculated, the type (direct, indirect) and methods of measurements used, the calculation factors used (and their justification) and the frequency of monitoring. 4.    Information on monitoring results Overview of the results of monitoring in view of demonstrating that the applicable BAT-AELs set out in BAT 57 and BAT 58 have been complied with and that the resulting emissions are equal to or lower than emissions when applying the applicable BAT-AELs and BAT-AEPLs at a unit-by-unit level, including at least the following: (a) average emission concentration across all units concerned (mg/Nm 3 , all monthly averages during a year); (b) total monthly emission across all units concerned (tonnes/month); (c) average emission concentration for each unit concerned (mg/Nm 3 , all monthly averages during a year); (d) flue gas flow rate for each unit concerned (Nm 3 /hour, all monthly averages during a year).

Other acts of the same type
Council Decision (CFSP) 2024/1964 of 15 July 2024 amending Decision (CFSP) 2018/1544 concerning restrictive measures against the proliferation and use of chemical weaponsCouncil Decision (CFSP) 2024/1967 of 15 July 2024 amending Decision (CFSP) 2020/1999 concerning restrictive measures against serious human rights violations and abusesCouncil Decision (CFSP) 2024/1968 of 15 July 2024 amending Decision (CFSP) 2022/2319 concerning restrictive measures in view of the situation in HaitiCouncil Decision (CFSP) 2024/1969 of 15 July 2024 amending Decision (CFSP) 2021/1277 concerning restrictive measures in view of the situation in LebanonCouncil Decision (CFSP) 2024/1970 of 15 July 2024 amending Decision (CFSP) 2023/1532 concerning restrictive measures in view of Iran’s military support to Russia’s war of aggression against Ukraine and to armed groups and entities in the Middle East and the Red Sea regionCouncil Decision (CFSP) 2024/1972 of 15 July 2024 amending and updating Decision (CFSP) 2018/340 establishing the list of projects to be developed under PESCOCouncil Decision (CFSP) 2024/1979 of 15 July 2024 on an assistance measure under the European Peace Facility to support the Albanian Armed ForcesCouncil Decision (CFSP) 2024/1980 of 15 July 2024 on an assistance measure under the European Peace Facility to support the Beninese Armed Forces with military equipment designed to deliver lethal forceCouncil Decision (CFSP) 2024/1981 of 15 July 2024 appointing the Chairman of the Military Committee of the European UnionCouncil Decision (CFSP) 2024/1984 of 15 July 2024 in support of the Institutional Transitional Planning for Non-Routine Missions and Investigative Capacities of the Organisation for the Prohibition of Chemical Weapons (OPCW)Council Decision (EU) 2024/2152 of 15 July 2024 on the signing, on behalf of the European Union, and provisional application of the Protocol (2024-2029) implementing the Fisheries Partnership Agreement between the European Community and the Republic of Cabo VerdeCommission Implementing Decision (EU, Euratom) 2024/1974 of 12 July 2024 establishing the framework for allocating costs related to borrowing and debt management operations under the diversified funding strategy

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next