My bookmarksSign up free

Commission Regulation (EU) 2016/1388 CHAPTER 4 — Compliance monitoring

Article 46–Article 47 · 2 articles

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Compliance monitoring for transmission-connected distribution facilities

Article 46

With regard to compliance monitoring of the reactive power requirements applicable to transmission-connected distribution facilities: (a) the transmission-connected distribution facility shall be equipped with necessary equipment to measure the active and reactive power, in accordance with Article 15; and (b) the relevant system operator shall specify the time frame for compliance monitoring.

Compliance monitoring for transmission-connected demand facilities

Article 47

With regard to compliance monitoring of the reactive power requirements applicable to transmission-connected demand facilities: (a) the transmission-connected demand facility shall be equipped with necessary equipment to measure the active and reactive power, in accordance with Article 15; and (b) the relevant system operator shall specify the time frame for compliance monitoring.

Back to Commission Regulation (EU) 2016/1388 — full text

Articles on this page are reproduced verbatim from official open data. See the attribution line.

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

What to look at next