ANNEX IV
‘ANNEX VI
Conditions for reimbursement of expenditure on the basis of standard scales of unit costs to Italy
1. Definition of standard scales of unit costs
Type of operations
Indicator name
Category of costs
Measurement unit for the indicators
Amounts
(in EUR)
1.
Measure 1.B of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 1 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Friuli VG 2014IT05SFOP004
—
POR Lazio 2014IT05SFOP005
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
PON Inclusione 2014IT05SFOP001
—
POR Lombardia FSE 2014IT05SFOP007
Hourly rate for 1 st guidance level support
All eligible costs, including direct staff costs.
Number of hours providing 1 st guidance level support.
34,00
2.
Measure 1.C of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 2 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Friuli VG 2014IT05SFOP004
—
POR Lazio 2014IT05SFOP005
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
PON Inclusione 2014IT05SFOP001
—
POR Lombardia FSE 2014IT05SFOP007
Hourly rate for specialist or 2 nd guidance level support.
All eligible costs, including direct staff costs.
Number of hours providing specialist or 2 nd guidance level support.
35,50
3.
Measures 2.A, 2.B, 4.A, 4.C and 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 3 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Lazio 2014IT05SFOP005
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
PON Inclusione 2014IT05SFOP001
—
POR Lombardia FSE 2014IT05SFOP007
Hourly rate for the following tranings:
—
Training focused on integration in the labour market;
—
Reintegration in the schooling and training system for young people aged between 15 and 18;
—
Apprenticeship for qualification and professional diploma;
—
Apprenticeship for higher training and research;
—
Training for self-employment and self-entrepreneurship ( 4 )
This hourly rate depends on the type of class (A, B or C ( 5 ) )
Hourly rate per student participating in the training
All eligible costs, including direct staff costs and excluding any allowance paid to participants.
Number of hours per training course differentiated by type of class, and the number of hours per student.
TYPE OF CLASS
HOURLY RATE PER COURSE
HOURLY RATE PER STUDENT
C
73,13
0,80
B
117,00
A
146,25
4.
Measure 3 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001)and similar operations ( 6 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Friuli VG 2014IT05SFOP004
—
POR Lazio 2014IT05SFOP005
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
PON Inclusione 2014IT05SFOP001
—
POR Lombardia 2014IT05SFOP007
New employment contracts as a result of job coaching
All eligible costs, including direct staff costs
Number of new employment contracts, differentiated by type of contract and profile classification (from low to very high) ( 7 )
Profile Classification
LOW
MEDIUM
HIGH
VERY HIGH
Open-ended contract and 1 st and 3 rd level apprenticeship contract
1 500
2 000
2 500
3 000
2 nd level apprenticeship, fixed-term and temporary contract ≥ 12 months
1 000
1 300
1 600
2 000
fixed-term and temporary contract 6-12 months
600
800
1 000
1 200
5.
Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 8 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Friuli VG 2014IT05SFOP004
—
POR Lazio 2014IT05SFOP005
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Lombardia 2014IT05SFOP007
—
PON Inclusione 2014IT05SFOP001
New regional/interregional/
transnational traineeships
All eligible costs including direct staff costs for providing a traineeship.
Number of traineeships, differentiated by profile classification.
LOW
MEDIUM
HIGH
VERY HIGH
REGIONAL/INTERREGIONAL/
TRANSNATIONAL
200
300
400
500
6.
Measure 5 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 9 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Friuli VG 2014IT05SFOP004
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Lombardia 2014IT05SFOP007
—
PON Inclusione 2014IT05SFOP001
Traineeships under interregional mobility
Traineeships under transnational mobility
For interregional mobility: all eligible costs, including travel, accommodation and meals, but excluding participant allowances
For transnational mobility: all eligible costs.
Number of traineeships, differentiated by location and, for interregional mobility, the length of traineeship.
Interregional mobility as per the rates set out in point 3.4
Transnational mobility as per the rates set in point 3.5
7.
Measure 6 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 10 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
POR Molise 2014IT16M2OP001
—
POR Piemonte 2014IT05SFOP013
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Lombardia 2014IT05SFOP007
—
PON Inclusione 2014IT05SFOP001
30 hour block of general preparatory training for access to the voluntary civilian service.
All eligible costs, including direct staff costs, excluding allowances and insurance.
Number of participants completing the 30 hour block of training.
90
8.
Measure 7.1 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 11 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Emilia Romagna 2014IT05SFOP003
—
—POR Friuli VG 2014IT05SFOP004
—
POR Lazio 2014IT05SFOP005
—
POR Molise 2014IT16M2OP001
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
—POR Lombardia 2014IT05SFOP007
—
PON Inclusione 2014IT05SFOP001
Hourly rate of support for self-employment and self-entrepreneurship ( 12 )
All eligible costs, including direct staff costs, but excluding any allowance.
Number of hours of support provided to participants.
40
9.
Measure 8 of the national Operational Programme Youth Employment Initiative (2014IT05M9OP001) and similar operations ( 13 ) under:
—
POR Abruzzo 2014IT05SFOP009
—
POR Basilicata 2014IT05SFOP016
—
PO Bolzano 2014IT05SFOP017
—
POR Calabria 2014IT16M2OP006
—
POR Campania 2014IT05SFOP020
—
POR Liguria 2014IT05SFOP006
—
POR Molise 2014IT16M2OP001
—
POR Puglia 2014IT16M2OP002
—
POR Sardegna 2014IT05SFOP021
—
POR Sicilia 2014IT05SFOP014
—
PO Trento 2014IT05SFOP018
—
POR Umbria 2014IT05SFOP010
—
POR Valle D’Aosta 2014IT05SFOP011
—
PON SPAO 2014IT05SFOP002
—
POR Toscana FSE 2014IT05SFOP015
—
POR Lombardia 2014IT05SFOP007
—
PON Inclusione 2014IT05SFOP001
A.
Employment contracts following professional interregional mobility or professional transnational mobility;
B.
Job interview under professional transnational mobility
All eligible costs (one off subsidy for travel, accommodation and meals, and an interview allowance), not including any additional allowances for disadvantaged people and any allowances for travel, accommodation or meals under interregional mobility provided by employer.
Number of employment contracts or job interviews, differentiated by location
—
Professional interregional mobility as per the amounts for more than 600 hours set out in point 3.4. ( 14 )
—
Professional transnational mobility for interview purposes as per the amounts set out in point 3.6.
—
Professional transnational mobility as per the amounts set out in point 3.7.
10.
Operations increasing the number of Industrial PhD positions under the following Operational Programmes:
—
PON Ricerca 2014 IT16M20P005
—
POR Basilicata FSE 2014IT05SFOP016
—
POR Campania FSE 2014IT05SFOP020
—
POR Puglia FESR FSE 2014IT16M2OP002
—
POR Calabria FESR FSE 2014IT16M2OP006
—
POR Abruzzo FSE 2014IT05SFOP009
—
POR Sardegna FSE 2014IT05SFOP021
—
POR Molise FESR FSE 2014IT16M2OP001
—
POR Friuli Venezia Giulia FSE 2014IT05SFOP004
—
POR Liguria FSE 2014IT05SFOP006
—
POR Lombardia FSE 2014IT05SFOP007
—
POR Valle D’Aosta FSE 2014IT05SFOP011
—
POR Toscana FSE 2014IT05SFOP015
—
PA Bolzano FSE 2014IT05SFOP017
—
POR Sicilia FSE 2014IT05SFOP014
—
POR Umbria FSE 2014IT05SFOP010
—
POR Emilia Romagna FSE 2014IT05SFOP003
—
PA Trento 2014IT05SFOP018
Months spent working on PhD.
All eligible costs for the participant (salary and associated social security contributions) and the institution providing the PhD (direct and indirect costs).
Number of months spent working on PhD, according to location in Italy or abroad.
Without a period spent abroad:
1 927,63 per month
With a period spent abroad:
2 891,45 per month
11.
Adult training under OP Education 2014IT05M20P001
Participants gaining a certificate in adult training
All categories of costs
Number of participants gaining a certificate in adult training, differentiated by length of module and additional specific support ( 15 )
327 (30 hour module)
357 (30 hour module with additional specific support)
654 (60 hour module)
684 (60 hour module with additional specific support)
1 090 (100 hour module)
1 120 (100 hour module with additional specific support)
12.
Activities related to Citizenship and the Rule of Law under OP Education 2014IT05M20P001
Participants gaining a certificate in initiatives related to “Citizenship and Rule of Law”.
All categories of costs
Number of participants gaining a certificate related to “Citizenship and Rule of Law”, differentiated by length of module, additional specific support, and meal allowance.
191,10 (30 hour module)
221,10 (30 hours with additional specific support)
261,10 (30 hours with meal allowance)
291,10 (30 hours with additional specific support and meal allowance)
382,20 (60 hour module)
412,20 (60 hours with additional specific support)
522,20 (60 hours with meal allowance)
552,20 (60 hours with additional specific support and meal allowance)
637,00 (100 hour module)
667,00 (100 hours with additional specific support)
871,00 (100 hours with meal allowance)
901,00 (100 hours with additional specific support and meal allowance)
13.
Classroom training under OP Education 2014IT05M20P001
Participants gaining a certificate in classroom training
All categories of costs
Number of participants gaining a certificate in classroom training, differentiated by length of module, additional specific support and meal allowance.
360,60 (30 hour module)
390,60 (30 hours with additional specific support)
430,60 (30 hours with meal allowance)
460,60 (30 hours with additional specific support and meal allowance)
721,20 (60 hour module)
751,20 (60 hours with additional specific support)
861,20 (60 hours with meal allowance)
891,20 (60 hours with additional specific support and meal allowance)
1 202,00 (100 hour module)
1 232,00 (100 hours with additional specific support)
1 436,00 (100 hours with meal allowance)
1 466,00 (100 hours with additional specific support and meal allowance)
14.
Language training in context of transnational mobility under OP Education 2014IT05M20P001
Participants gaining a certificate in language training following transnational mobility.
All categories of costs, except travel and accommodation costs for persons accompanying participants.
Number of participants gaining a certificate in language training following transnational mobility, differentiated by length of module, country and length of stay, and distance travelled
774,00 (40 hour module)
1 161,00 (60 hour module)
1 548,00 (80 hour module)
To these amounts for each participant can be added a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs:
Km
Amount
100-499
500-1 999
2 000 -2 999
3 000 -3 999
4 000 -7 999
8 000 -19 999
180
275
360
530
820
1 100
15.
Internships under OP Education 2014IT05M20P001
Participants gaining an internship certificate, with or without transnational mobility.
All categories of costs, except travel and accommodation for persons accompanying participants.
Number of participants gaining an internship certificate, with or without transnational mobility, differentiated by length of module and, where transnational mobility is included, country, length of stay, and distance travelled
786,60 (60 hour module)
1 179,90 (90 hour module)
1 573,20 (120 hour module)
3 146,40 (240 hour module)
For internships with transnational mobility, these amounts for each participant can be supplemented by a daily amount to cover accommodation costs, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs:
Km
Amount
100-499
500-1 999
2 000 -2 999
3 000 -3 999
4 000 -7 999
8 000 -19 999
180
275
360
530
820
1 100
16.
Language training and internships in the context of transnational mobility under OP Education 2014IT05M20P001
Persons accompanying participants.
Accommodation and travel costs
Number of persons accompanying participants.
Accommodation costs per participant, differentiated by country, as set out in point 3.8 below, and the following amount for travel costs:
Km
Amount
100-499
500-1 999
2 000 -2 999
3 000 -3 999
4 000 -7 999
8 000 -19 999
180
275
360
530
820
1 100
17.
Training in Higher Technical Institutes under the following OPs:
—
2014IT05SFOP016 (POR FSE Basilicata)
—
2014IT16M2OP006 (POR FSE/FESR Calabria)
—
2014IT05SFOP020 (POR FSE Campania)
—
2014IT16M2OP002 (POR FSE/FESR Puglia)
—
2014IT05SFOP014 (POR FSE Sicilia)
—
2014IT05SFOP009 (POR FSE Abruzzo)
—
2014IT16M2OP001 (POR FSE Molise)
—
2014IT05SFOP021 (POR FSE Sardegna)
—
2014IT05SFOP017 (POR FSE Bolzano)
—
2014IT05SFOP003 (POR FSE Emilia-Romagna)
—
2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia)
—
2014IT05SFOP005 (POR FSE Lazio)
—
2014IT05SFOP006 (POR FSE Liguria)
—
2014IT05SFOP007 (POR FSE Lombardia)
—
2014IT05SFOP008 (POR FSE Marche)
—
2014IT05SFOP013 (POR FSE Piemonte)
—
2014IT05SFOP015 (POR FSE Toscana)
—
2014IT05SFOP010 (POR FSE Umbria)
—
2014IT05SFOP011 (POR FSE Valle d”Aosta)
—
2014IT05SFOP012 (POR FSE Veneto)
Participation in a training course in a Higher Technical Institute ( 16 )
Completion of a training course in a Higher Technical Institute
The unit costs cover all eligible categories of costs, except for costs related to courses run by certified centres that are compulsory for obtaining the mandatory certifications provided by the provisions of the Ministry of infrastructure and transportation, in the areas “Mobility of people and goods — conduction of the naval vehicle” and “Mobility of people and goods — management of equipment and onboard assembly”
Number of hours of participation in a training course in a Higher Technical Institute
In addition, number of participants who have successfully completed an academic year ( 17 ) of a training course in a Higher Technical Institute.
Hourly rate
49,93
For 2-year courses per completed year:
4 809,50
For 3-year courses per completed year:
3 206,30
18.
Mobility programmes for researchers under the OP 2014IT16M20P005 - 2014-2020 “Research and Innovation” Operating Programme, Axis I “Human Capital”, Action I.2. Mobility programmes for researchers and similar operations under:
—
2014IT05SFOP011 (POR FSE Valle d’Aosta)
—
2014IT05SFOP020 (POR FSE Campania)
—
2014IT05SFOP004 (POR FSE Friuli-Venezia Giulia)
Monthly cost for a researcher with a fixed-term contract ( 18 )
All categories of costs.
Number of months spent on site or off campus by a researcher hired under the law n.240/2010 for a period of 36 months, and selected through a public competition in a state or private university in one of the regions that are beneficiaries of the intervention.
A. Without periods of activity off campus or abroad for researchers for line of activity “mobility ( 19 ) ”
EUR 4 885,38
B. With periods of activity off campus or abroad for researchers for line of activity “mobility” and for researchers under line of activity “attraction ( 20 ) ”
EUR 5 496,05
19.
Group training under measures 2.C, 5.bis, 6.bis, 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002
Hourly rate for the following tranings:
—
Employment and training ( 21 ) ;
—
Linguistic training for voluntary civilian service in the EU ( 22 ) ;
—
Linguistic training for Professional transnational mobility;
—
Linguistic training for Traineeships in transnational mobility ( 23 )
This hourly rate depends on the type of class (A, B or C ( 24 ) )
Hourly rate per student participating in the training
all eligible costs (personnel costs, other direct and indirect costs), except for any allowance
Cost per hour of training per student plus cost for one hour of training course differentiated by class
TYPE OF CLASS
HOURLY RATE PER
COURSE
HOURLY RATE PER
STUDENT
C
73,13
0,80
B
117,00
A
146,25
20.
Individual and individualised training as foreseen under measures 2.A, 2.B, 2.C, 4.A, 4.C of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002.
Hourly rate for the following individual and individualised trainings:
—
Training focused on integration in the labour market ( 25 ) ;
—
Reintegration in the schooling and training system for young people between 15 and 18 years old ( 26 ) ;
—
Employment and training;
—
Apprenticeship for qualification and professional diploma;
—
Apprenticeship for higher training and research.
all eligible costs (personnel costs, other direct and indirect costs), except for any allowance
Number of training hours and number of participants ( 27 )
40,00
21.
General training activities under measures 5.bis, 6.bis and 8 of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002.
General training courses carried out at the beginning of
—
extra-curricular internships in transnational mobility;
—
voluntary civilian service in the EU;
—
transnational professional mobility projects.
all eligible costs (personnel costs, other direct and indirect costs), except for any allowance
Number of participants in a general training course with a minimum duration of 30 hours
180,00
22.
Voluntary civilian service as foreseen under measure 6.bis of NOP YEI 2014IT05M9OP001 and for similar operations (including different target groups) carried out under NOP SAEP 2014IT05SFOP002
—
Daily allowance for each day of effective stay abroad
—
Accomodation and meal contribution for each day of effective stay abroad
all eligible costs (personnel costs, other direct costs, indirect costs, allowances and insurance costs), excluding travel costs
Number of days of effective stay abroad.
15,00 — daily allowance to participant for each day of effective stay abroad
30,00 — accomodation and meal contribution to participant for each day of effective stay abroad
2. Adjustment of amounts
(a)
For standard scales of unit costs 1-9 and 19-20, the amounts may be adjusted where the FOI index (consumer price index for blue and white collar worker households, excluding tobacco products) shows a monetary revaluation equal to or exceeding 5 %. In particular, in a given year y, the adjustment is made if in a period y+t the difference between the benchmarking coefficients shown by the FOI index for such years is equal to or higher than 5 %. The base year applied — and on the basis of which the amounts were adjusted — is 2014. Where this rate is equal to or higher than 5 %, each unit cost may be adjusted accordingly.
(b)
For standard scale of unit costs 10, the rate may be adjusted by replacing the montly scholarship and/or social security contributions in the calculation method that consists of monthly scholarship plus social security contributions plus an amount for all other costs. Updated data can be found in amendments to the Ministerial Decree of 18.6.2008 (which defines the total gross annual amount of PhD scholarships) and biannual adjustment of the rate of social security contributions (Circular letter No 13 of 29/01/2016 of the Director-General of INPS, the National Institute for Social Security).
(c)
For standard scales of unit costs 11-15, which are based on the historical average number of certificates (output) awarded per module, the rate may be adjusted at the end of each financial year (31/12) following an assessment by the Managing Authority of the implementation of the operations related to each of the unit costs. Where such an assessment shows a divergence in the average number of certificates awarded per module for each type of training as compared to the average number used as the basis for calculating the existing unit cost, then a new unit cost will be calculated according to the following formula:
UC new = UC old + Variation
where
Variation = UC old – (UC old
* Output new /Output old )
(d)
For standard scales of unit costs 17, the rates will be reviewed every four years and if, taking 2017 as the reference year, there is an increase of more than 5 % an adjustment will be made by ISTAT based on the FOI consumer price index (consumer price index for blue and white collar worker households, excluding tobacco products).
(e)
For standard scales of unit costs 18, the rates may be adjusted following amendments of the current legislation (which includes Law n.240/2010, the Presidential Decree n.232/2011, the Law n.232/2016 (Budget Law 2017), Law n.448/1998 “Misure di finanza pubblica per la stabilizzazione e lo sviluppo”, Law n.335/1995, Legislative Decree n.446/1997, and the Presidential Decree n.1032/1973.) as well as changes of the social security contribution rates.
(f)
The amounts for unit costs 21 and 22 may be adapted following amendments to the legislative provisions of Legislative Decree 77/2002, Directorial Determination (DD) of 19 December 2007 and D.D. n. 348 of 18 May 2016 of the Presidency of the Council of Ministers — Department of Youth and Civilian Service
3.1 Interregional travel costs (in EUR)
Region of origin
Travel costs
Destination region
Valle d’Aosta
PA Bolzano
PA Trento
Liguria
Piemonte
Lombardia
Veneto
Friuli Venezia Giulia
Emilia-Romagna
Toscana
Marche
Abruzzo
Umbria
Lazio
Campania
Molise
Basilicata
Puglia
Calabria
Sicilia
Sardegna
Abruzzo
269,30
211,17
198,50
148,63
231,83
232,74
201,95
226,34
167,99
68,60
58,98
0,00
23,32
25,81
125,43
45,79
83,99
93,05
164,82
165,16
182,46
Basilicata
271,11
236,02
227,31
236,81
294,55
239,98
259,23
264,89
201,50
176,59
97,35
83,99
142,75
67,92
33,96
31,24
0,00
55,47
71,43
114,33
224,18
Calabria
369,32
285,04
273,72
242,02
351,32
340,51
304,28
304,39
270,32
238,63
243,15
164,82
178,18
139,01
90,33
85,58
71,43
69,05
0,00
75,62
280,55
Campania
253,00
271,68
259,06
113,20
246,78
221,87
165,84
302,24
178,86
160,74
169,86
125,43
151,01
99,62
0,00
21,28
33,96
89,20
90,33
113,20
190,22
Emilia-Romagna
146,48
81,50
74,71
38,26
129,05
92,82
63,39
55,47
0,00
54,34
62,26
167,99
52,07
131,31
178,86
160,52
201,50
140,37
270,32
292,06
188,94
Friuli Venezia Giulia
129,05
103,24
82,30
120,22
175,52
99,62
37,36
0,00
55,47
70,18
163,01
226,34
162,50
113,20
302,24
218,87
264,89
241,12
304,39
325,00
279,13
Lazio
230,31
172,06
160,74
129,05
210,55
201,50
165,27
113,20
131,31
99,62
70,18
25,81
54,34
0,00
99,62
29,21
67,92
113,20
139,01
138,10
156,65
Liguria
53,66
113,94
105,11
0,00
36,22
49,81
106,41
120,22
38,26
67,47
118,07
148,63
75,50
129,05
113,20
152,03
236,81
250,17
242,02
231,61
224,15
Lombardia
59,37
97,35
76,47
49,81
67,92
0,00
69,05
99,62
92,82
113,20
108,67
232,74
84,90
201,50
221,87
223,91
239,98
179,99
340,51
335,07
179,51
Marche
200,25
84,90
76,98
118,07
119,99
108,67
70,18
163,01
62,26
108,11
0,00
58,98
43,92
70,18
169,86
75,96
97,35
107,54
243,15
216,21
251,20
Molise
259,51
196,06
194,31
152,03
232,97
223,91
194,48
218,87
160,52
126,56
75,96
45,79
106,75
29,21
21,28
0,00
31,24
70,30
85,58
140,48
185,85
PA Bolzano
118,58
0,00
36,22
113,94
151,35
97,35
96,22
103,24
81,50
110,94
84,90
67,92
127,01
172,06
271,68
196,06
236,02
138,10
285,04
310,17
273,47
PA Trento
112,24
36,22
0,00
105,11
147,22
76,47
19,02
82,30
74,71
99,62
76,98
198,50
120,44
160,74
259,06
194,31
227,31
132,44
273,72
308,24
247,26
Piemonte
17,43
151,35
147,22
36,22
0,00
67,92
103,01
175,52
129,05
147,16
119,99
231,83
181,74
210,55
246,78
232,97
294,55
191,31
351,32
273,60
187,92
Puglia
275,59
138,10
132,44
250,17
191,31
179,99
164,71
241,12
140,37
212,82
107,54
93,05
156,78
113,20
89,20
70,30
55,47
0,00
69,05
147,61
279,42
Sardegna
205,36
273,47
247,26
224,15
187,92
179,51
248,56
279,13
188,94
189,41
251,20
182,46
210,98
156,65
190,22
185,85
224,18
279,42
280,55
185,82
0,00
Sicilia
350,35
310,17
308,24
231,61
273,60
335,07
303,38
325,00
292,06
273,94
216,21
165,16
189,50
138,10
113,20
140,48
114,33
147,61
75,62
0,00
185,82
Toscana
169,12
110,94
99,62
67,47
147,16
113,20
95,09
70,18
54,34
0,00
108,11
68,60
36,22
99,62
160,74
126,56
176,59
212,82
238,63
273,94
189,41
Umbria
199,18
127,01
120,44
75,50
181,74
84,90
125,14
162,50
52,07
36,22
43,92
23,32
0,00
54,34
151,01
106,75
142,75
156,78
178,18
189,50
210,98
Valle d’Aosta
0,00
118,58
112,24
53,66
17,43
59,37
155,03
129,05
146,48
169,12
200,25
269,30
199,18
230,31
253,00
259,51
271,11
275,59
369,32
350,35
205,36
Veneto
155,03
96,22
19,02
106,41
103,01
69,05
0,00
37,36
63,39
95,09
70,18
201,95
125,14
165,27
165,84
194,48
259,23
164,71
304,28
303,38
248,56
3.2 Interregional accommodation costs (for more than 600 hours) (in EUR)
Region of origin
ACCOMMODATION COSTS
Destination region
Valle d’Aosta
PA Bolzano
PA Trento
Liguria
Piemonte
Lombardia
Veneto
Friuli Venezia Giulia
Emilia-Romagna
Toscana
Marche
Abruzzo
Umbria
Lazio
Campania
Molise
Basilicata
Puglia
Calabria
Sicilia
Sardegna
Abruzzo
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Basilicata
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Calabria
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Campania
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Emilia-Romagna
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Friuli Venezia Giulia
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Lazio
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Liguria
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Lombardia
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Marche
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Molise
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
PA Bolzano
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
PA Trento
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Piemonte
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Puglia
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Sardegna
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Sicilia
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Toscana
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Umbria
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Valle d’Aosta
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
Veneto
803,84
1153,94
788,70
741,25
695,62
1229,98
700,07
703,65
967,41
1227,68
601,19
578,51
628,23
1229,68
930,19
519,08
684,62
607,95
575,50
988,35
600,62
3.3 Interregional subsistence costs (for more than 600 hours) (in EUR)
Region of origin
MEAL COSTS
Destination region
Valle d’Aosta
PA Bolzano
PA Trento
Liguria
Piemonte
Lombardia
Veneto
Friuli Venezia Giulia
Emilia-Romagna
Toscana
Marche
Abruzzo
Umbria
Lazio
Campania
Molise
Basilicata
Puglia
Calabria
Sicilia
Sardegna
Abruzzo
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Basilicata
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Calabria
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Campania
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Emilia-Romagna
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Friuli Venezia Giulia
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Lazio
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Liguria
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Lombardia
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Marche
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Molise
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
PA Bolzano
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
PA Trento
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Piemonte
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Puglia
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Sardegna
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Sicilia
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Toscana
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Umbria
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Valle d’Aosta
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
Veneto
482,30
252,45
320,93
407,41
521,52
502,26
416,04
616,19
514,94
200,21
480,95
433,27
641,87
596,60
298,90
638,86
205,47
440,97
487,71
359,11
256,27
3.4 Interregional allowances for traineeships (in EUR)
No. of training hours
Abruzzo
Basilicata
Calabria
Campania
Emilia Romagna
Friuli Venezia Giulia
Lazio
Liguria
Lombardia
Marche
Molise
PA Bolzano
PA Trento
Piemonte
Puglia
Sardegna
Sicilia
Toscana
Umbria
Valle d’Aosta
Veneto
Region where the training is taking place
Valle d’Aosta
160
611,70
613,51
711,72
595,40
488,88
471,45
572,71
396,06
401,77
542,65
601,91
460,98
454,64
359,83
617,99
547,76
692,75
511,52
541,58
-
497,43
161-200
613,84
615,65
713,86
597,54
491,02
473,59
574,85
398,20
403,91
544,79
604,05
463,12
456,78
361,97
620,13
549,90
694,89
513,66
543,72
-
499,57
201-249
699,44
701,25
799,46
683,14
576,62
559,19
660,45
483,80
489,51
630,39
689,65
548,72
542,38
447,57
705,73
635,50
780,49
599,26
629,32
-
585,17
250-300
804,30
806,11
904,32
788,00
681,48
664,05
765,31
588,66
594,37
735,25
794,51
653,58
647,24
552,43
810,59
740,36
885,35
704,12
734,18
-
690,03
301-600
913,44
915,25
1.013,46
897,14
790,62
773,19
874,45
697,80
703,51
844,39
903,65
762,72
756,38
661,57
919,73
849,50
994,49
813,26
843,32
-
799,17
> 600
1 555,44
1 557,25
1 655,46
1 539,14
1 432,62
1 415,19
1 516,45
1 339,80
1 345,51
1 486,39
1 545,65
1 404,72
1 398,38
1 303,57
1 561,73
1 491,50
1 636,49
1 455,26
1 485,32
-
1 441,17
Bolzano
160
585,59
610,44
659,45
646,09
455,92
477,65
546,48
488,35
471,77
459,31
570,48
-
410,64
525,76
512,52
647,88
684,58
485,35
501,42
492,99
470,63
161-200
587,93
612,78
661,79
648,43
458,26
479,99
548,82
490,69
474,11
461,65
572,82
-
412,98
528,10
514,86
650,22
686,92
487,69
503,76
495,33
472,97
201-249
681,53
706,38
755,39
742,04
551,86
573,60
642,42
584,29
567,71
555,26
666,42
-
506,58
621,71
608,46
743,83
780,53
581,29
597,37
588,93
566,58
250-300
796,20
821,04
870,06
856,70
666,53
688,26
757,09
698,96
682,37
669,92
781,08
-
621,25
736,37
723,13
858,49
895,19
695,96
712,03
703,60
681,24
301-600
915,54
940,39
989,40
976,05
785,87
807,60
876,43
818,30
801,72
789,27
900,43
-
740,59
855,71
842,47
977,83
1.014,53
815,30
831,38
822,94
800,59
> 600
1 617,57
1 642,41
1 691,43
1 678,07
1 487,90
1 509,63
1 578,46
1 520,33
1 503,74
1 491,29
1 602,45
-
1 442,62
1 557,74
1 544,50
1 679,86
1 716,56
1 517,33
1 533,40
1 524,97
1 502,61
Trento
160
493,91
522,71
569,13
554,47
370,12
377,71
456,15
400,52
371,88
372,38
489,72
331,63
-
442,63
427,85
542,67
603,65
395,02
415,85
407,65
314,43
161-200
495,75
524,56
570,97
556,31
371,97
379,55
458,00
402,36
373,72
374,23
491,56
333,48
-
444,47
429,70
544,52
605,50
396,87
417,70
409,49
316,27
201-249
569,60
598,41
644,82
630,17
445,82
453,40
531,85
476,21
447,57
448,08
565,42
407,33
-
518,32
503,55
618,37
679,35
470,72
491,55
483,35
390,12
250-300
660,07
688,88
735,29
720,63
536,29
543,87
622,32
566,68
538,04
538,55
655,88
497,80
-
608,79
594,02
708,84
769,82
561,19
582,02
573,81
480,59
301-600
754,23
783,04
829,46
814,80
630,45
638,03
716,48
660,84
632,20
632,71
750,05
591,96
-
702,95
688,18
803,00
863,98
655,35
676,18
667,98
574,76
> 600
1 308,13
1 336,93
1 383,35
1 368,69
1 184,34
1 191,93
1 270,37
1 214,74
1 186,10
1 186,61
1 303,94
1 145,85
-
1 256,85
1 242,07
1 356,89
1 417,87
1 209,25
1 230,07
1 221,87
1 128,65
Liguria
160
454,43
542,61
547,82
419,00
344,06
426,02
434,85
-
355,61
423,87
457,83
419,74
410,91
342,02
555,97
529,95
537,41
373,27
381,30
359,46
412,21
161-200
456,34
544,52
549,73
420,91
345,97
427,93
436,76
-
357,52
425,78
459,74
421,65
412,82
343,93
557,88
531,86
539,32
375,18
383,21
361,37
414,12
201-249
532,79
620,97
626,18
497,36
422,42
504,38
513,21
-
433,97
502,23
536,19
498,10
489,27
420,38
634,33
608,31
615,77
451,63
459,66
437,82
490,57
250-300
626,44
714,63
719,83
591,01
516,07
598,03
606,86
-
527,62
595,88
629,84
591,75
582,92
514,04
727,98
701,96
709,42
545,28
553,32
531,47
584,22
301-600
723,92
812,10
817,31
688,48
613,55
695,50
704,33
-
625,09
693,35
727,31
689,22
680,39
611,51
825,46
799,43
806,89
642,75
650,79
628,94
681,69
> 600
1 297,29
1 385,47
1 390,68
1 261,86
1 186,92
1 268,88
1 277,71
-
1 198,47
1 266,73
1 300,69
1 262,59
1 253,76
1 184,88
1 398,83
1 372,81
1 380,27
1 216,13
1 224,16
1 202,32
1 255,07
Piemonte
160
555,86
618,58
675,35
570,81
453,08
499,55
534,58
360,26
391,95
444,02
557,00
475,38
471,25
-
515,34
511,95
597,64
471,19
505,77
341,46
427,04
161-200
557,89
620,60
677,37
572,83
455,10
501,57
536,61
362,28
393,98
446,05
559,02
477,40
473,27
-
517,36
513,98
599,66
473,22
507,80
343,49
429,07
201-249
638,90
701,61
758,38
653,84
536,11
582,58
617,62
443,29
474,98
527,06
640,03
558,41
554,28
-
598,37
594,99
680,67
554,22
588,81
424,50
510,08
250-300
738,13
800,85
857,61
753,07
635,35
681,82
716,85
542,52
574,22
626,29
739,26
657,65
653,52
-
697,61
694,22
779,90
653,46
688,04
523,73
609,31
301-600
841,42
904,13
960,90
856,36
738,63
785,10
820,14
645,81
677,50
729,58
842,55
760,93
756,80
-
800,89
797,51
883,19
756,74
791,33
627,02
712,60
> 600
1 448,98
1 511,69
1 568,46
1 463,92
1 346,19
1 392,66
1 427,69
1 253,37
1 285,06
1 337,13
1 450,11
1 368,49
1 364,36
-
1 408,45
1 405,07
1 490,75
1 364,30
1 398,88
1 234,57
1 320,15
Lombardia
160
693,90
701,15
801,67
683,03
553,99
560,78
662,66
510,97
-
569,83
685,07
558,51
537,63
529,08
641,15
640,67
796,23
574,36
546,06
520,54
530,21
161-200
696,78
704,03
804,55
685,92
556,87
563,66
665,54
513,85
-
572,72
687,95
561,40
540,51
531,96
644,03
643,56
799,12
577,24
548,94
523,42
533,10
201-249
812,07
819,32
919,84
801,21
672,16
678,95
780,83
629,14
-
688,01
803,24
676,69
655,80
647,26
759,32
758,85
914,41
692,54
664,24
638,71
648,39
250-300
953,31
960,55
1 061,07
942,44
813,39
820,18
922,06
770,37
-
829,24
944,48
817,92
797,03
788,49
900,55
900,08
1 055,64
833,77
805,47
779,94
789,62
301-600
1 100,30
1 107,55
1 208,07
1 089,43
960,39
967,18
1 069,06
917,37
-
976,23
1 091,47
964,91
944,03
935,48
1 047,55
1 047,07
1 202,63
980,76
952,46
926,94
936,61
> 600
1 964,98
1 972,23
2 072,75
1 954,11
1 825,07
1 831,86
1 933,74
1 782,05
-
1 840,91
1 956,15
1 829,59
1 808,71
1 800,16
1 912,23
1 911,75
2 067,31
1 845,44
1 817,14
1 791,61
1 801,29
Veneto
160
499,08
556,36
601,42
462,97
360,53
334,49
462,41
403,54
366,19
367,32
491,61
393,36
316,15
400,15
461,84
545,70
600,51
392,22
422,28
452,16
-
161-200
500,94
558,22
603,27
464,83
362,38
336,35
464,26
405,40
368,04
369,18
493,47
395,21
318,01
402,00
463,70
547,56
602,37
394,08
424,13
454,02
-
201-249
575,22
632,50
677,56
539,11
436,67
410,63
538,55
479,68
442,33
443,46
567,75
469,50
392,29
476,29
537,98
621,84
676,65
468,36
498,42
528,30
-
250-300
666,22
723,50
768,56
630,11
527,67
501,63
629,55
570,68
533,33
534,46
658,75
560,49
483,29
567,29
628,98
712,84
767,65
559,36
589,42
619,30
-
301-600
760,93
818,21
863,27
724,82
622,38
596,34
724,26
665,39
628,04
629,17
753,46
655,21
578,00
662,00
723,69
807,55
862,36
654,07
684,13
714,01
-
> 600
1 318,06
1 375,34
1 420,39
1 281,95
1 179,51
1 153,47
1 281,39
1 222,52
1 185,17
1 186,30
1 310,59
1 212,33
1 135,13
1 219,13
1 280,82
1 364,68
1 419,49
1 211,20
1 241,26
1 271,14
-
Friuli Venezia Giulia
160
577,72
616,26
655,77
653,62
406,84
-
464,57
471,59
450,99
514,38
570,24
454,61
433,67
526,89
592,49
630,50
676,37
421,56
513,87
480,42
388,73
161-200
579,91
618,46
657,96
655,81
409,04
-
466,77
473,79
453,18
516,58
572,44
456,81
435,86
529,08
594,68
632,70
678,57
423,75
516,07
482,62
390,92
201-249
667,75
706,30
745,81
743,66
496,88
-
554,61
561,63
541,03
604,42
660,28
544,65
523,71
616,93
682,53
720,54
766,41
511,60
603,91
570,46
478,77
250-300
775,36
813,91
853,41
851,26
604,49
-
662,22
669,24
648,63
712,03
767,89
652,26
631,32
724,54
790,13
828,15
874,02
619,20
711,52
678,07
586,37
301-600
887,36
925,91
965,41
963,26
716,49
-
774,22
781,24
760,63
824,03
879,89
764,26
743,31
836,54
902,13
940,15
986,02
731,20
823,52
790,07
698,37
> 600
1 546,18
1 584,73
1 624,24
1 622,09
1 375,31
-
1 433,04
1 440,06
1 419,46
1 482,85
1 538,71
1 423,08
1 402,14
1 495,36
1 560,96
1 598,97
1 644,84
1 390,03
1 482,34
1 448,89
1 357,20
No. of training hours
Abruzzo
Basilicata
Calabria
Campania
Emilia
Romagna
Friuli
Venezia
Giulia
Lazio
Liguria
Lombardia
Marche
Molise
PA
Bolzano
PA
Trento
Piemonte
Puglia
Sardegna
Sicilia
Toscana
Umbria
Valle
d’Aosta
Veneto
Region where the training is taking place
Emilia Romagna
160
562,62
596,13
664,95
573,49
-
450,10
525,95
432,89
487,46
456,89
555,15
476,14
469,35
523,68
535,00
583,58
686,69
448,97
446,71
541,11
458,03
161-200
565,09
598,60
667,42
575,96
-
452,57
528,41
435,36
489,92
459,36
557,62
478,60
471,81
526,15
537,47
586,04
689,16
451,44
449,17
543,58
460,49
201-249
663,75
697,25
766,08
674,61
-
551,23
627,07
534,02
588,58
558,02
656,28
577,26
570,47
624,81
636,13
684,70
787,81
550,09
547,83
642,24
559,15
250-300
784,60
818,11
886,94
795,47
-
672,08
747,93
654,88
709,44
678,87
777,13
698,12
691,33
745,66
756,98
805,56
908,67
670,95
668,69
763,10
680,01
301-600
910,39
943,90
1 012,73
921,26
-
797,87
873,72
780,67
835,23
804,66
902,92
823,91
817,12
871,45
882,77
931,35
1 034,46
796,74
794,48
888,88
805,80
> 600
1 650,33
1 683,84
1 752,66
1 661,20
-
1 537,81
1 613,65
1 520,60
1 575,16
1 544,60
1 642,86
1 563,84
1 557,05
1 611,39
1 622,71
1 671,28
1 774,40
1 536,68
1 534,41
1 628,82
1 545,73
Toscana
160
448,73
556,73
618,76
540,88
434,47
450,32
479,75
447,60
493,34
488,24
506,69
491,07
479,75
527,30
592,95
569,54
654,08
-
416,36
549,26
475,22
161-200
451,11
559,10
621,14
543,26
436,85
452,70
482,13
449,98
495,71
490,62
509,07
493,45
482,13
529,67
595,33
571,92
656,46
-
418,74
551,63
477,60
201-249
546,14
654,14
716,17
638,29
531,88
547,73
577,16
545,01
590,75
585,65
604,10
588,48
577,16
624,71
690,36
666,95
751,49
-
513,77
646,67
572,63
250-300
662,56
770,55
832,59
754,71
648,30
664,15
693,58
661,43
707,16
702,07
720,52
704,90
693,58
741,12
806,78
783,37
867,91
-
630,19
763,08
689,05
301-600
783,73
891,72
953,76
875,87
769,47
785,31
814,75
782,60
828,33
823,24
841,69
826,07
814,75
862,29
927,95
904,54
989,07
-
751,35
884,25
810,22
> 600
1 496,48
1 604,48
1 666,51
1 588,63
1 482,22
1 498,07
1 527,50
1 495,35
1 541,08
1 535,99
1 554,44
1 538,82
1 527,50
1 575,04
1 640,70
1 617,29
1 701,83
-
1 464,11
1 597,01
1 522,97
Marche
160
347,07
385,44
531,24
457,95
350,35
451,10
358,27
406,16
396,76
-
364,05
372,99
365,07
408,08
395,63
539,29
504,30
396,20
332,01
488,34
358,27
161-200
348,87
387,24
533,04
459,75
352,15
452,90
360,07
407,96
398,56
-
365,85
374,79
366,87
409,88
397,43
541,09
506,10
398,00
333,81
490,14
360,07
201-249
420,89
459,27
605,07
531,77
424,17
524,92
432,10
479,98
470,59
-
437,87
446,81
438,89
481,91
469,45
613,12
578,13
470,02
405,83
562,16
432,10
250-300
509,12
547,49
693,29
620,00
512,40
613,15
520,32
568,21
558,81
-
526,10
535,04
527,12
570,13
557,68
701,34
666,35
558,25
494,06
650,39
520,32
301-600
600,95
639,32
785,12
711,83
604,23
704,98
612,15
660,04
650,64
-
617,93
626,87
618,95
661,96
649,51
793,17
758,18
650,08
585,89
742,22
612,15
> 600
1 141,12
1 179,49
1 325,29
1 251,99
1 144,40
1 245,15
1 152,32
1 200,21
1 190,81
-
1 158,10
1 167,04
1 159,11
1 202,13
1 189,68
1 333,34
1 298,35
1 190,24
1 126,06
1 282,39
1 152,32
Abruzzo
160
-
353,35
434,18
394,78
437,35
495,70
295,17
417,99
502,10
328,34
315,15
337,28
467,86
501,19
362,41
451,81
434,52
337,96
292,68
538,66
471,31
161-200
-
355,04
435,86
396,47
439,03
497,39
296,85
419,67
503,78
330,02
316,83
338,96
469,54
502,88
364,09
453,50
436,20
339,64
294,36
540,35
472,99
201-249
-
422,38
503,20
463,81
506,37
564,73
364,19
487,01
571,12
397,36
384,17
406,30
536,88
570,22
431,43
520,84
503,54
406,98
361,70
607,69
540,33
250-300
-
504,87
585,69
546,30
588,86
647,22
446,68
569,51
653,61
479,85
466,66
488,79
619,37
652,71
513,92
603,33
586,03
489,47
444,19
690,18
622,82
301-600
-
590,73
671,55
632,16
674,72
733,08
532,54
655,36
739,47
565,71
552,52
574,65
705,23
738,57
599,78
689,19
671,89
575,33
530,05
776,03
708,68
> 600
-
1 095,77
1 176,60
1 137,21
1 179,77
1 238,12
1 037,59
1 160,41
1 244,52
1 070,76
1 057,57
1 079,70
1 210,28
1 243,61
1 104,83
1 194,24
1 176,94
1 080,38
1 035,10
1 281,08
1 213,73
Umbria
160
361,45
480,87
516,31
489,14
390,20
500,63
392,46
413,63
423,03
382,05
444,88
465,14
458,57
519,87
494,91
549,11
527,63
374,35
-
537,30
463,27
161-200
363,56
482,99
518,42
491,25
392,31
502,74
394,58
415,75
425,14
384,16
446,99
467,25
460,69
521,98
497,02
551,22
529,74
376,47
-
539,42
465,38
201-249
448,09
567,52
602,95
575,78
476,85
587,27
479,11
500,28
509,67
468,70
531,52
551,78
545,22
606,52
581,56
635,76
614,27
461,00
-
623,95
549,92
250-300
551,65
671,07
706,50
679,34
580,40
690,82
582,66
603,83
613,23
572,25
635,07
655,34
648,77
710,07
685,11
739,31
717,82
564,55
-
727,50
653,47
301-600
659,42
778,85
814,28
787,11
688,18
798,60
690,44
711,61
721,00
680,03
742,85
763,12
756,55
817,85
792,89
847,09
825,60
672,33
-
835,28
761,25
> 600
1 293,42
1 412,84
1 448,27
1 421,11
1 322,17
1 432,59
1 324,43
1 345,60
1 355,00
1 314,02
1 376,84
1 397,11
1 390,54
1 451,84
1 426,88
1 481,08
1 459,59
1 306,32
-
1 469,27
1 395,24
Lazio
160
512,01
554,12
625,21
585,81
617,51
599,40
-
615,25
687,69
556,38
515,40
658,26
646,94
696,75
599,40
642,84
624,30
585,81
540,53
716,50
651,47
161-200
515,05
557,16
628,25
588,85
620,55
602,44
-
618,28
690,73
559,42
518,44
661,30
649,98
699,79
602,44
645,88
627,34
588,85
543,57
719,54
654,51
201-249
636,60
678,71
749,80
710,40
742,10
723,99
-
739,83
812,28
680,97
639,99
782,85
771,53
821,34
723,99
767,43
748,89
710,40
665,12
841,09
776,06
250-300
785,49
827,60
898,69
859,30
891,00
872,88
-
888,73
961,18
829,87
788,89
931,75
920,43
970,24
872,88
916,33
897,79
859,30
814,02
989,99
924,96
301-600
940,47
982,58
1 053,67
1 014,27
1 045,97
1 027,86
-
1 043,71
1 116,15
984,84
943,86
1 086,72
1 075,40
1 125,21
1 027,86
1 071,31
1 052,76
1 014,27
968,99
1 144,96
1 079,93
> 600
1 852,09
1 894,20
1 965,29
1 925,89
1 957,59
1 939,48
-
1 955,33
2 027,77
1 896,46
1 855,48
1 998,34
1 987,02
2 036,83
1 939,48
1 982,93
1 964,38
1 925,89
1 880,61
2 056,58
1 991,55
Campania
160
452,64
361,17
417,55
-
506,07
629,46
426,83
440,41
549,08
497,07
348,49
598,89
586,27
573,99
416,41
517,43
440,41
487,96
478,22
580,21
493,05
161-200
454,68
363,22
419,59
-
508,11
631,50
428,87
442,46
551,13
499,11
350,54
600,94
588,32
576,03
418,46
519,48
442,46
490,00
480,27
582,26
495,10
201-249
536,49
445,02
501,39
-
589,92
713,30
510,68
524,26
632,93
580,92
432,34
682,74
670,12
657,84
500,26
601,28
524,26
571,80
562,07
664,06
576,90
250-300
636,69
545,23
601,60
-
690,13
813,51
610,89
624,47
733,14
681,13
532,55
782,95
770,33
758,05
600,47
701,49
624,47
672,01
662,28
764,27
677,11
301-600
740,99
649,53
705,90
-
794,42
917,81
715,18
728,77
837,44
785,42
636,85
887,25
874,63
862,34
704,77
805,79
728,77
776,31
766,58
868,57
781,41
> 600
1 354,52
1 263,05
1 319,43
-
1 407,95
1 531,34
1 328,71
1 342,29
1 450,96
1 398,95
1 250,37
1 500,77
1 488,15
1 475,87
1 318,29
1 419,31
1 342,29
1 389,84
1 380,10
1 482,09
1 394,93
Molise
160
354,06
339,51
393,85
329,55
468,79
527,14
337,48
460,30
532,18
384,23
-
504,33
502,58
541,24
378,57
494,12
448,75
434,83
415,02
567,78
502,75
161-200
355,99
341,44
395,78
331,48
470,71
529,07
339,40
462,22
534,11
386,15
-
506,26
504,50
543,16
380,49
496,05
450,68
436,75
416,94
569,71
504,67
201-249
433,05
418,51
472,84
408,55
547,78
606,14
416,47
539,29
611,17
463,22
-
583,33
581,57
620,23
457,56
573,12
527,75
513,82
494,01
646,78
581,74
250-300
527,46
512,92
567,25
502,95
642,19
700,54
510,88
633,70
705,58
557,63
-
677,73
675,98
714,64
551,97
667,52
622,15
608,23
588,42
741,18
676,15
301-600
625,72
611,18
665,51
601,21
740,45
798,81
609,14
731,96
803,84
655,89
-
776,00
774,24
812,90
650,23
765,78
720,41
706,49
686,68
839,44
774,41
> 600
1 203,73
1 189,18
1 243,52
1 179,22
1 318,46
1 376,81
1 187,14
1 309,97
1 381,85
1 233,90
-
1 354,00
1 352,25
1 390,90
1 228,24
1 343,79
1 298,42
1 284,50
1 264,69
1 417,45
1 352,42
No. of training hours
Abruzzo
Basilicata
Calabria
Campania
Emilia
Romagna
Friuli
Venezia
Giulia
Lazio
Liguria
Lombardia
Marche
Molise
PA
Bolzano
PA
Trento
Piemonte
Puglia
Sardegna
Sicilia
Toscana
Umbria
Valle
d’Aosta
Veneto
Region where the training is taking place
Basilicata
160
320,95
-
308,39
270,92
438,46
501,85
304,88
473,77
476,94
334,31
268,20
472,98
464,27
531,51
292,43
461,14
351,29
413,55
379,71
508,07
496,19
161-200
322,44
-
309,87
272,40
439,94
503,33
306,36
475,26
478,43
335,79
269,68
474,46
465,75
532,99
293,91
462,62
352,77
415,03
381,19
509,56
497,67
201-249
381,68
-
369,11
331,64
499,18
562,57
365,60
534,50
537,67
395,03
328,92
533,70
524,99
592,23
353,15
521,86
412,01
474,27
440,43
568,80
556,91
250-300
454,25
-
441,68
404,21
571,75
635,14
438,17
607,07
610,23
467,60
401,49
606,27
597,56
664,80
425,72
594,43
484,58
546,84
513,00
641,36
629,48
301-600
529,78
-
517,21
479,74
647,28
710,67
513,70
682,60
685,77
543,13
477,02
681,80
673,09
740,33
501,25
669,96
560,11
622,37
588,53
716,90
705,01
> 600
974,08
-
961,51
924,04
1 091,58
1 154,97
958,00
1 126,90
1 130,07
987,43
921,33
1 126,10
1 117,39
1 184,63
945,55
1 114,26
1 004,41
1 066,67
1 032,83
1 161,20
1 149,31
Puglia
160
372,30
334,71
348,30
368,45
419,61
520,36
392,45
529,42
459,23
386,79
349,54
417,35
411,69
470,55
-
558,67
426,86
492,06
436,03
554,83
443,95
161-200
374,04
336,46
350,04
370,19
421,36
522,11
394,19
531,16
460,98
388,53
351,29
419,09
413,43
472,30
-
560,41
428,60
493,81
437,77
556,58
445,70
201-249
443,85
406,27
419,85
440,00
491,17
591,92
464,00
600,97
530,79
458,34
421,10
488,91
483,25
542,11
-
630,22
498,41
563,62
507,58
626,39
515,51
250-300
529,37
491,79
505,37
525,52
576,69
677,44
549,52
686,49
616,31
543,86
506,62
574,42
568,76
627,63
-
715,74
583,93
649,14
593,10
711,91
601,03
301-600
618,38
580,80
594,38
614,53
665,70
766,45
638,53
775,50
705,32
632,87
595,63
663,43
657,77
716,64
-
804,75
672,94
738,15
682,11
800,92
690,04
> 600
1 141,97
1 104,38
1 117,97
1 138,12
1 189,28
1 290,03
1 162,11
1 299,09
1 228,90
1 156,45
1 119,21
1 187,02
1 181,36
1 240,22
-
1 328,34
1 196,53
1 261,73
1 205,70
1 324,50
1 213,62
Calabria
160
447,87
354,48
-
373,38
553,37
587,45
422,06
525,07
623,56
526,20
368,63
568,09
556,77
634,37
352,10
563,61
358,67
521,68
461,23
652,37
587,33
161-200
449,64
356,25
-
375,15
555,14
589,22
423,83
526,84
625,33
527,97
370,40
569,86
558,54
636,14
353,87
565,38
360,44
523,45
463,00
654,14
589,10
201-249
520,40
427,01
-
445,92
625,90
659,98
494,59
597,60
696,09
598,74
441,16
640,62
629,30
706,90
424,64
636,14
431,20
594,21
533,76
724,90
659,86
250-300
607,09
513,70
-
532,60
712,59
746,66
581,28
684,29
782,77
685,42
527,85
727,31
715,99
793,58
511,32
722,82
517,89
680,89
620,44
811,58
746,55
301-600
697,31
603,92
-
622,82
802,81
836,88
671,50
774,51
873,00
775,64
618,07
817,53
806,21
883,81
601,54
813,04
608,11
771,12
710,67
901,81
836,77
> 600
1 228,03
1 134,64
-
1 153,54
1 333,53
1 367,61
1 202,22
1 305,23
1 403,72
1 306,36
1 148,79
1 348,25
1 336,93
1 414,53
1 132,26
1 343,77
1 138,83
1 301,84
1 241,39
1 432,53
1 367,49
Sicilia
160
523,88
473,06
434,34
471,93
650,78
683,72
496,83
590,33
693,80
574,94
499,21
668,89
666,97
632,33
506,34
544,54
-
632,67
548,22
709,08
662,10
161-200
526,13
475,30
436,59
474,17
653,02
685,96
499,07
592,57
696,04
577,18
501,45
671,14
669,21
634,57
508,58
546,79
-
634,91
550,46
711,32
664,34
201-249
615,81
564,98
526,27
563,85
742,70
775,65
588,75
682,26
785,72
666,86
591,13
760,82
758,89
724,25
598,26
636,47
-
724,59
640,15
801,00
754,02
250-300
725,67
674,84
636,13
673,71
852,56
885,51
698,61
792,12
895,58
776,72
700,99
870,68
868,75
834,11
708,12
746,33
-
834,45
750,01
910,86
863,88
301-600
840,01
789,18
750,47
788,05
966,91
999,85
812,96
906,46
1 009,92
891,06
815,33
985,02
983,10
948,46
822,46
860,67
-
948,80
864,35
1 025,21
978,23
> 600
1 512,62
1 461,79
1 423,08
1 460,66
1 639,52
1 672,46
1 485,57
1 579,07
1 682,53
1 563,67
1 487,94
1 657,63
1 655,71
1 621,07
1 495,08
1 533,28
-
1 621,41
1 536,96
1 697,82
1 650,84
Sardegna
160
410,58
452,31
508,68
418,35
417,07
507,25
384,77
452,27
407,64
479,33
413,98
501,59
475,39
416,05
507,55
-
413,94
417,53
439,11
433,48
476,69
161-200
412,01
453,73
510,10
419,77
418,49
508,68
386,20
453,70
409,06
480,75
415,40
503,02
476,81
417,47
508,97
-
415,37
418,96
440,53
434,91
478,11
201-249
469,04
510,76
567,14
476,80
475,52
565,71
443,23
510,73
466,09
537,78
472,43
560,05
533,84
474,50
566,00
-
472,40
475,99
497,56
491,94
535,15
250-300
538,90
580,63
637,00
546,67
545,39
635,57
513,09
580,59
535,96
607,65
542,30
629,91
603,71
544,37
635,87
-
542,26
545,85
567,43
561,80
605,01
301-600
611,61
653,34
709,71
619,38
618,10
708,29
585,80
653,31
608,67
680,36
615,01
702,63
676,42
617,08
708,58
-
614,98
618,56
640,14
634,51
677,72
> 600
1 039,35
1 081,07
1 137,45
1 047,11
1 045,83
1 136,02
1 013,54
1 081,04
1 036,40
1 108,09
1 042,74
1 130,36
1 104,15
1 044,81
1 136,31
-
1 042,71
1 046,30
1 067,87
1 062,25
1 105,46
3.5 Allowances for traineeships under transnational mobility (in EUR)
Country
Months
SA
( 28 )
MA
( 29 )
GA
( 30 )
1
2
3
4
5
6
Austria
1 617
2 312
3 094
4 082
4 732
5 382
162,5
650,2
22,733
Belgium
1 501
2 183
2 841
3 719
4 305
4 890
151,0
585,3
21,575
Bulgaria
990
1 413
1 831
2 583
2 980
3 377
99,2
396,7
13,97
Cyprus
1 342
1 854
2 499
3 316
3 957
4 495
134,5
538,2
18,94
Czechia
1 365
1 876
2 522
3 369
4 018
4 564
136,5
546,17
19,51
Germany
1 477
1 477
2 751
3 749
4 344
4 939
148,7
594,67
21,24
Denmark
1 973
2 840
3 707
5 080,5
5 889
6 698
202,1
808,5
28,88
Estonia
1 504
2 226
2 949
3 765
4 366
4 968
150,3
601,33
21,48
Spain
1 552
2 199
2 860
3 894
4 514
5 133
154,8
619,17
22,11
Finland
1 806
2 587
3 351
4 537
5 260
5 982
180,6
722,5
25,80
France
1 771
2 533
3 295
4 451
5 162
5 873
177,8
711
25,39
United Kingdom
1 972
2 820
3 668
4 950
5 737
6 525
196,9
787,67
28,13
Hungary
1 255
1 790
2 324
3 223
3 727
4 231
126,1
504,33
18,01
Greece
1 402
2 000
2 598
3 674
4 251
4 828
144,2
576,83
20,60
Ireland
1 788
2 559
3 330
4 493
5 210
5 927
179,3
717,3
25,62
Iceland
1 614
2 312
3 011
4 062
4 710
5 358
162
648
23,14
Liechenstein
1 978
2 817
3 656
4 968
5 758
6 547
197,4
789,5
28,20
Lithuania
1 145
1 639
2 133
2 912
3 420
3 882
115,6
462,3
16,51
Luxembourg
1 501
2 148
2 794
3 802
4 406
5 010
151
604
21,57
Latvia
1 204
1 721
2 238
3 104
3 589
4 074
121,2
484,8
17,32
Malta
1 315
1 883
2 452
3 362
3 891
4 420
132,3
529
18,89
Netherlands
1 597
2 350
3 058
4 144
4 805
5 466
165,3
661,2
23,61
Norway
2 129
3 035
3 942
5 341
6 189
7 036
211,9
847,7
30,27
Poland
1 232
1 758
2 284
3 174
3 669
4 165
123,9
495,5
17,70
Portugal
1 371
1 959
2 548
3 492
4 041
4 591
137,4
549,5
19,63
Romania
1 056
1 507
1 958
2 745
3 170
3 596
106,3
425,3
15,19
Sweden
1 771
2 533
3 288
4 452
5 161
5 871
177,3
709,3
25,33
Slovenia
1 363
1 945
2 526
3 465
4 011
4 556
136,3
545,3
19,48
Slovakia
1 293
1 850
2 408
3 308
3 827
4 346
129,8
519,2
18,54
Turkey
1 194
1 706
2 218
3 071
3 552
4 033
120,3
481
17,18
Switzerland
1 879
2 579
3 279
4 670
5 370
6 070
175,0
700,0
25,00
Croatia
1 157
1 589
2 021
2 953
3 385
3 817
108
432
15,43
3.6 Allowances for interview(s)
Place or country of destination
Distance (KM)
Amount (EUR)
Travel and accommodation
Daily subsistence allowance (DSA)
Any EU-28 or Iceland and Norway
0-50
0
50/day (> 12 hours) 25/½ day (> 6 - 12 hours) Max 3 days
> 50-250
100
> 250-500
250
> 500
350
3.7 Allowance to move to another Member State (work placement)
Country of Destination
Amount (EUR)
Austria
1 025
Belgium
970
Bulgaria
635
Croatia
675
Cyprus
835
Czechia
750
Denmark
1 270
Estonia
750
Finland
1 090
France
1 045
Germany
940
Greece
910
Hungary
655
Iceland
945
Ireland
1 015
Italy
995
Latvia
675
Lithuania
675
Luxembourg
970
Malta
825
Netherlands
950
Norway
1 270
Poland
655
Portugal
825
Romania
635
Slovakia
740
Slovenia
825
Spain
890
Sweden
1 090
United Kingdom
1 060
3.8 Daily accommodation costs (in EUR)
Student daily allowances
Staff daily allowances
Country Group
Country
(Day 1-day 14)
(Day 15-Day 60)
(Day 1-day 14)
(Day 15-Day 60)
Group A
United Kingdom
90
63
128
90
Group B
Denmark
86
60
128
90
Group C
Netherlands
83
58
128
90
Sweden
83
58
128
90
Group D
Cyprus
77
54
112
78
Finland
77
54
112
78
Luxembourg
77
54
112
78
Group E
Austria
74
52
112
78
Belgium
74
52
112
78
Bulgaria
74
52
112
78
Czechia
74
52
112
78
Group F
Greece
70
49
112
78
Hungary
70
49
112
78
Switzerland
70
49
112
78
Liechtenstein
70
49
112
78
Norway
70
49
112
78
Poland
70
49
112
78
Romania
70
49
112
78
Turkey
70
49
112
78
Group G
Germany
67
47
96
67
Spain
67
47
96
67
Latvia
67
47
96
67
North Macedonia
67
47
96
67
Malta
67
47
96
67
Slovakia
67
47
96
67
Group H
Croatia
58
41
80
56
Estonia
58
41
80
56
Lithuania
58
41
80
56
Slovenia
58
41
80
56
Group I
France
80
56
112
78
Ireland
80
56
128
90
Iceland
80
56
112
78
Group L
Portugal
64
45
96
67
’
( 1 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.B of NOP YEI but with different target groups.
( 2 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 1.C of NOP YEI but with different target groups.
( 3 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measures 2A, 2B, 4A, 4C and 7.1 of NOP YEI but with different target groups.
( 4 ) For unit cost number 3 relating to training for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of group formation of 4 or more students.
( 5 ) The definition of the classes is in accordance with the provisions of Ministerial Circular no. 2 of 2 February 2009. This Circular defines the classes according to the type of teachers providing training.
( 6 ) Similar operations is to be understood as including those operations with similar activities to those in measure 3 of NOP YEI but with different target groups
( 7 ) The young person will be profiled according to one of the four classes (low, medium, high, very high) on the basis of the following variables:
—
age;
—
sex;
—
education;
—
employment status one year before;
—
region and province where the competent body which took in charge the young is based;
—
language skills (only for non-nationals who have not obtained the educational qualification in Italy), for the evaluation of which will be used the already developed methodology for the issuance of an EC residence permit for long-term residents.
Based on the variables identified for the young, a ‘disadvantage coefficient’ is calculated, with a value between 0 and 1.
( 8 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 5 of NOP YEI but with different target groups.
( 9 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 5 of NOP YEI but with different target groups
( 10 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in NOP YEI but with different target groups.
( 11 )
‘Similar operations’ is to be understood as including those operations with similar activities to those in measure 7.1 of NOP YEI but with different target groups.
( 12 ) For unit cost number 8 relating to support for self-employment and self-entrepreneurship, the amount will be reimbursed only in the case of individual or individualised training (‘individualised’ meaning a maximum of 3 students).
( 13 )
‘Similar operations’ are to be understood as including those operations with similar activities to those in measure 8 of NOP YEI but with different target groups.
( 14 ) The amounts in table 3.4 are the maximum allowance payable. Where an employer provides an allowance to cover travel, accommodation or meals, the allowance mentioned in point 3.4 will be reduced by:
—
the amount mentioned in point 3.1 for travel (depending on location)
—
the amount mentioned in point 3.2 for accommodation (depending on location)
—
the amount mentioned in point 3.3 for meals (depending on location).
The amounts mentioned in tables 3.1, 3.2 and 3.3. will also be payable in a situation where the beneficiary pays only the categories of allowances mentioned in those tables.
( 15 ) Additional specific support is limited to one unit per student per module.
( 16 )
‘Istituto Tecnico Superiore’.
( 17 ) Successfully completion of an academic year corresponds to admission to the next year or admission to the final exam.
( 18 ) A researcher hired under the law n.240/2010 for a period of 36 months with a full-time fixed-term contract, and selected through a public competition
( 19 ) Line of Activity Mobility
Concerning this line of activity, the NOP will co-finance the international mobility of researchers holding a PhD since no more than four years at the time of the call publication. The NOP will support the hiring under the law n.240/2010 (art.24.3, letter a) of full time fixed-term researchers mainly to address them to international mobility programs.
( 20 ) Line of activity Attraction
This line of activity will co-finance the return of researchers to less developed and in transition Regions hired under the law n.240/2010.(art.24.3, letter a) holding a PhD since no more than eight years at the time of the call publication, working in universities/research institutes/enterprises/other institutions out of the NOP target areas or even abroad, with an experience of at least two years in such structures.
( 21 ) A ceiling of 4 000 euros is foreseen for each final recipient.
( 22 ) A ceiling of 1 200 euros is foreseen for each final recipient.
( 23 ) A ceiling of 1 200 euros is foreseen for each final recipient
( 24 ) The definition of the classes is in accordance with the provisions of Ministerial Circular no. 2 of 2 February 2009. This Circular defines the classes according to the type of teachers providing training.
( 25 ) For measure 2.A, it is specified that, for trainings focused on integration in the labour market, the standard unit costs are payable according to the following arrangement: 70 % of the grant is recognised on the basis of delivered training hours; the remaining 30 % is recognised on the basis of delivered training hours if in compliance with the conditionality that the participant finds a job (within 120 days after the end of the course).
( 26 ) For measures 2.B, 2.C, 4.A and 4.C, the standard unit costs are payable according to the following arrangement: 100 % of the grant is recognised on the basis of delivered training hours.
( 27 ) Maximum number of students per training: 3 people
( 28 ) SA = Additional Week
( 29 ) MA = Additional Month