My bookmarksSign up free
Source

Commission Implementing Decision (EU) 2022/172 of 7 February 2022 amending Implementing Decision (EU) 2018/1538 on the harmonisation of radio spectrum for use by short-range devices within the 874-876 and 915-921 MHz frequency bands (notified under document C(2022) 608) (Text with EEA relevance)

Commission Implementing Decision (EU) 2022/172 of 7 February 2022 amending Implementing Decision (EU) 2018/1538 on the harmonisation of radio spectrum for use by short-range devices within the 874-876 and 915-921 MHz frequency bands (notified under document C(2022) 608) (Text with EEA relevance)

Implementing Decision (EU) 2022/172 · Decision · 3 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

(1) Decision (EU) 2018/1538 is amended as follows: Article 2 is replaced by the following: ‘Article 2 For the purposes of this Decision, the following definitions shall apply: (1) “short-range device” means a radio device which provides either unidirectional or bidirectional communication and which receives and/or transmits over a short distance at low power; (2) “non-interference and non-protected basis” means that no harmful interference may be caused to any radio communication service and that no claim may be made for protection of these devices against interference originating from radio communication services; (3) “category of short-range devices” means a group of short-range or networked short-range devices that use spectrum with similar technical spectrum access mechanisms or based on common usage scenarios;’; (2) The Annex is replaced by the text in the Annex to this Decision

Supplementary provisions

Frequency bands with corresponding harmonised technical conditions and implementation deadlines for short-range devices

ANNEXSupplementary provisions

Open ↗

ANNEX Frequency bands with corresponding harmonised technical conditions and implementation deadlines for short-range devices The following table specifies different combinations of frequency band and category of short-range devices (as defined in Article 2(6)), and the harmonised technical conditions for spectrum access and implementation deadlines applicable thereto. General technical conditions applicable to all bands and short-range devices that fall in the scope of this Decision: — Member States must allow the usage of spectrum up to the transmit power, field strength or power density given in this table. In accordance with Article 3(3), they may impose less restrictive conditions, i.e. allow the use of spectrum with higher transmit power, field strength or power density, provided that this does not reduce or compromise the appropriate coexistence between short-range devices in bands harmonised by this Decision; — Member States may only impose the ‘ additional parameters (channelling and/or channel access and occupation rules)’ identified in the table, and shall not add other parameters or spectrum access and mitigation requirements. Less restrictive conditions within the meaning of Article 3(3), mean that Member States may completely omit the ‘additional parameters (channelling and/or channel access and occupation rules)’ in a given cell or allow higher values, provided that the appropriate sharing environment in the harmonised band is not compromised. — Member States may only impose the ‘ other usage restrictions ’ identified in the table and shall not add additional usage restrictions unless the conditions mentioned in Article 3(2) apply. As less restrictive conditions may be introduced within the meaning of Article 3(3), Member States may omit one or all of these restrictions, provided that the appropriate sharing environment in the harmonised band is not compromised. Terms used: ‘ Duty cycle ’ is defined as the ratio, expressed as a percentage, of Σ(Ton)/(Tobs) where Ton is the ‘on’ time of a single transmitter device and Tobs is the observation period. Ton is measured in an observation frequency band (Fobs). Unless otherwise specified in this technical annex, Tobs is a continuous one hour period and Fobs is the applicable frequency band in this Annex. Less restrictive conditions within the meaning of Article 3(3), mean that Member States may allow a higher value for ‘duty cycle’. Band no Frequency band Category of short-range devices Transmit power limit/field strength limit/power density limit Additional parameters (channelling and/or channel access and occupation rules) Other usage restrictions Implemen-tation deadline 1 874-874,4 MHz  ( [8] ) Non-specific short-range devices  ( [1] ) 500 mW e.r.p. Adaptive Power Control (APC) required, alternatively other mitigation techniques which achieve at least an equivalent level of spectrum compatibility Techniques to access spectrum and mitigate interference that provide an appropriate level of performance to comply with the essential requirements of Directive 2014/53/EU shall be used. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. Bandwidth: ≤ 200 kHz Duty cycle: ≤ 10 % for network access points  ( [4] ) Duty cycle: 2,5 % otherwise This set of usage conditions is only available for data networks All nomadic and mobile devices within the data network shall be controlled by a master network access point  ( [4] ) ,  ( [5] ) ,  ( [6] ) ,  ( [7] ) 1 July 2022 2 917,4-919,4 MHz  ( [9] ) Wideband data transmission devices  ( [3] ) 25 mW e.r.p Techniques to access spectrum and mitigate interference that provide an appropriate level of performance to comply with the essential requirements of Directive 2014/53/EU shall be used. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. Bandwidth: > 600 kHz and ≤ 1 MHz Duty cycle: ≤ 10 % for network access points  ( [4] ) Duty cycle: ≤ 2,8 % otherwise This set of usage conditions is only available for wideband short-range devices in data networks All nomadic and mobile devices within the data network shall be controlled by a master network access point  ( [4] ) ,  ( [5] ) ,  ( [6] ) 1 July 2022 3 916,1-918,9 MHz  ( [10] ) Radio Frequency Identification (RFID) devices  ( [2] ) Interrogator transmissions at 4 W e.r.p. only permitted at the centre frequencies 916,3 MHz, 917,5 MHz, 918,7 MHz Techniques to access spectrum and mitigate interference that provide an appropriate level of performance to comply with the essential requirements of Directive 2014/53/EU shall be used. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. Bandwidth: ≤ 400 kHz  ( [5] ) ,  ( [6] ) ,  ( [7] ) 1 July 2022 4 917,3-918,9 MHz Non-specific short-range devices  ( [1] ) 500 mW e.r.p. Transmissions only permitted within the frequency ranges 917,3-917,7 MHz, 918,5-918,9 MHz Adaptive Power Control (APC) required, alternatively other mitigation techniques which achieve at least an equivalent level of spectrum compatibility Techniques to access spectrum and mitigate interference that provide an appropriate level of performance to comply with the essential requirements of Directive 2014/53/EU shall be used. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. Bandwidth: ≤ 200 kHz Duty cycle: ≤ 10 % for network access points  ( [4] ) Duty cycle: ≤ 2,5 % otherwise This set of usage conditions is only available for data networks All nomadic and mobile devices within the data network shall be controlled by a master network access point  ( [4] ) ,  ( [5] ) ,  ( [6] ) ,  ( [7] ) . 1 July 2022 5 917,4-919,4 MHz  ( [9] ) Non-specific short-range devices  ( [1] ) 25 mW e.r.p. Techniques to access spectrum and mitigate interference that provide an appropriate level of performance to comply with the essential requirements of Directive 2014/53/EU shall be used. If relevant techniques are described in harmonised standards or parts thereof the references of which have been published in the Official Journal of the European Union under Directive 2014/53/EU, performance at least equivalent to these techniques shall be ensured. Bandwidth: ≤ 600 kHz Duty cycle: ≤ 1 %, This set of usage conditions is only available for short-range device in data networks All nomadic and mobile devices within the data network shall be controlled by a master network access point  ( [4] ) ,  ( [5] ) ,  ( [6] ) 1 July 2022 ( [1] )   The non-specific short-range device category covers all kinds of radio devices, regardless of the application or the purpose, which fulfil the technical conditions as specified for a given frequency band. Typical uses include telemetry, telecommand, alarms, data transmissions in general and other applications. ( [2] )   The radio frequency identification (RFID) device category covers tag/interrogator based radio communications systems, consisting of radio devices (tags) attached to animate or inanimate items and of transmitter/receiver units (interrogators) which activate the tags and receive data back. Typical uses include the tracking and identification of items, such as for electronic article surveillance (EAS), and collecting and transmitting data relating to the items to which tags are attached, which may be either battery-less, battery assisted or battery powered. The responses from a tag are validated by its interrogator and passed to its host system. ( [3] )   The wideband data transmission device category covers radio devices that use wideband modulation techniques to access the spectrum. Typical uses include wireless access systems such as radio local area networks (WAS/RLANs) or wideband short-range devices in data networks. ( [4] )   A network access point in a data network is a fixed terrestrial short range device that acts as a connection point for the other short range devices in the data network to service platforms located outside of that data network. The term data network refers to several short range devices, including the network access point, as network components and to the wireless connections between them.’ ( [5] )   According to Article 3(1) the frequency bands shall be designated and made available on a non-exclusive and shared basis. The harmonised technical conditions shall make it possible for most short-range devices in most Member States to be operated subject to a general authorisation regime under national law. This is without prejudice to Articles 46 and 51 of Directive (EU) 2018/1972 and to Articles 3(2) and 7 of Directive 2014/53/EU. Member States may limit usage of this entry such that installation and operation are performed only by professional users and may consider individual authorisation, e.g. to administer geographical sharing and/or the application of mitigation techniques to ensure protection of radio services. ( [6] )   In Member States where parts or all of this frequency range are used for public order and public security purposes and defence and coordination is not possible, Member States may decide not to implement this entry partially or entirely, in accordance with Article 1(4) of Decision 676/2002/EC and Article 3(2) of this Decision. ( [7] )   National rules, such as local coordination, may also be needed in order to avoid interference to radio services operating in the adjacent bands, for example due to intermodulation or blocking. ( [8] )   This frequency range 874-874,4 MHz is the harmonised minimum core band. ( [9] )   This frequency range 917,4-919,4 MHz is the harmonised minimum core band. ( [10] )   RFID tags respond at a very low power level (-10 dBm e.r.p.) in a frequency range around the RFID interrogator channels and must comply with the essential requirements of Directive 2014/53/EU.

Other acts of the same type
Commission Decision (EU) 2025/1167 of 29 November 2024 on State aid SA.50952 (2022/C) (ex 2018/FC) implemented by Germany for DB Cargo (notified under document C(2024) 8610)Commission Implementing Decision (EU) 2024/2944 of 28 November 2024 on the harmonised standards for appliances burning gaseous fuels drafted in support of Regulation (EU) 2016/426 of the European Parliament and of the Council and repealing Commission Implementing Decision (EU) 2024/224European Council Decision (EU) 2024/2997 of 28 November 2024 appointing the CommissionCouncil Implementing Decision (EU) 2024/3013 of 28 November 2024 amending Implementing Decision 2009/1013/EU authorising the Republic of Austria to continue to apply a measure derogating from Articles 168 and 168a of Directive 2006/112/EC on the common system of value added taxPolitical and Security Committee Decision (CFSP) 2024/3178 of 28 November 2024 on the appointment of the Special Training Commander for the European Union Military Assistance Mission in support of Ukraine (EUMAM Ukraine) and repealing Decision (CFSP) 2022/2097 (EUMAM Ukraine/1/2024)Commission Decision (EU) 2025/2402 of 28 November 2024 on tax rulings SA.38374 (2014/C) (ex 2014/NN) (ex 2014/CP) – Netherlands, alleged aid to Starbucks (notified under document C(2024) 8566)Commission Decision (EU) 2025/2404 of 28 November 2024 on tax ruling SA.38375 (2014/C) (ex 2014/NN) – Luxembourg, alleged aid to FFT (notified under document C(2024) 8564)Commission Decision (EU) 2025/2405 of 28 November 2024 on tax ruling SA.38944 (2014/C) (ex 2014/NN) – Luxembourg, alleged aid to Amazon (notified under document C(2024) 8565)Commission Implementing Decision (EU) 2024/2924 of 27 November 2024 amending Commission Implementing Decision (EU) 2023/2895 as regards the list of islands and ports referred to in Article 12(3-d) of Directive 2003/87/EC of the European Parliament and of the CouncilDecision (EU) 2024/3105 of the European Parliament and of the Council of 27 November 2024 on the mobilisation of the European Union Solidarity Fund to provide assistance to Germany and Italy relating to floods occurred in 2024Commission Delegated Decision (EU) 2025/318 of 27 November 2024 on the unilateral inclusion of sectors by Sweden in the emissions trading system within the Union for buildings, road transport and additional sectors pursuant to Article 30j of Directive 2003/87/EC of the European Parliament and of the CouncilCouncil Decision (EU) 2024/3106 of 26 November 2024 on the position to be taken on behalf of the European Union within the International Maritime Organization’s Maritime Safety Committee at its 109th session as regards the adoption of amendments to the International Code of Safety for Ships using Gases or other Low-flashpoint Fuels (IGF Code)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next