My bookmarksSign up free

2012/413/EU: Commission Decision of 19 July 2012 on the… Article 1

2012/413/EU: Commission Decision of 19 July 2012 on the… Article 1

Article 1

As it is foreseen that harmonised rules on transparency will pass the comitology procedure in 2012 the Commission establishes for the development of harmonised electricity rules this annual priority list for 2013: — capacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (adoption under comitology procedure), — rules for longer-term (forward) capacity allocation (drafting of network code), — network connection rules: — network rules on generator grid connection (adoption under comitology procedure), — network code on distribution system operator and industrial load connection (finalise network code and start comitology process), — network code on High-voltage direct current transmission system connection, — system operation (finalise network codes on operational security, on operational planning and scheduling and on load-frequency control and reserves and start adoption process  ( 5 ) ), — balancing rules including network-related reserve power rules (finalise network code on balancing), — rules regarding harmonised transmission tariff structures and/or investment incentives.

Read the full instrument →

Other provisions in 2012/413/EU: Commission Decision of 19 July 2012 on the…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 1 of 2012/413/EU: Commission Decision of 19 July 2012 on the… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next