Article 1
As it is foreseen that harmonised rules on transparency will pass the comitology procedure in 2012 the Commission establishes for the development of harmonised electricity rules this annual priority list for 2013: — capacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (adoption under comitology procedure), — rules for longer-term (forward) capacity allocation (drafting of network code), — network connection rules: — network rules on generator grid connection (adoption under comitology procedure), — network code on distribution system operator and industrial load connection (finalise network code and start comitology process), — network code on High-voltage direct current transmission system connection, — system operation (finalise network codes on operational security, on operational planning and scheduling and on load-frequency control and reserves and start adoption process ( 5 ) ), — balancing rules including network-related reserve power rules (finalise network code on balancing), — rules regarding harmonised transmission tariff structures and/or investment incentives.