My bookmarksSign up free

Directive 2012/34/EU of the European Parliament and of the… Article 54

Directive 2012/34/EU of the European Parliament and of the… Article 54

Special measures to be taken in the event of disturbance

Article 54

1.   In the event of disturbance to train movements caused by technical failure or accident the infrastructure manager shall take all necessary steps to restore the situation to normal. To that end, it shall draw up a contingency plan listing the various bodies to be informed in the event of serious incidents or serious disturbance to train movements. 2.   In an emergency and, where absolutely necessary, on account of a breakdown making the infrastructure temporarily unusable, the train paths allocated may be withdrawn without warning for as long as is necessary to repair the system. The infrastructure manager may, if it deems this necessary, require railway undertakings to make available to it the resources which it feels are the most appropriate to restore the situation to normal as soon as possible. 3.   Member States may require railway undertakings to be involved in assuring the enforcement and monitoring of their own compliance with the safety standards and rules.

Read the full instrument → · Read this in context: SECTION 3 — Allocation of infrastructure capacity →

Other provisions in SECTION 3 — Allocation of infrastructure capacity

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 54 of Directive 2012/34/EU of the European Parliament and of the… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next